Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LX & BPCS: Waste in Manufacturing

What if you could eliminate waste and optimize your business for $5/day?

Crossroads MES (Manufacturing Execution System) captures all of your ERP production data and harnesses the power of that data to increase your team’s efficiency by providing the right information at the right time to the right people. 

Reducing waste enables manufacturers to save money and increase productivity.
Where is the waste happening in your processes? How often is your department spending time and resources on the following tasks?

Manufacturing:

  • Correcting repeated problems with production quality
  • Juggling manual production schedules
  • Holding up production due to delayed component deliveries
  • Constantly evaluating labor and material resource needs


Materials:

  • Correcting deliveries with missing or wrong items
  • Sending overstocked inventory back to a warehouse or other location
  • Searching for raw materials, tools, or other equipment
  • Waiting on a late delivery from a supplier


Finance:

  • Managing increasing carrying costs of inventory
  • Dealing with budget overruns on projects
  • Managing cash flow due to unnecessarily long lead times and shipment times
  • Constantly evaluating labor and material costs to get overall production costs down


Company-wide:

  • Correcting repeated problems with production quality
  • Correcting deliveries with missing or wrong items
  • Holding up production due to delayed component deliveries
  • Constantly evaluating labor and material costs to get overall production costs down

Request a demo

Previous Article Infor LX & BPCS Tip: Have you considered WebTop?
Next Article Infor LN & Baan Tip: All About Invoicing Methods
Print
9027 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Did you know that you can set up one-time vendors in LX? One Time Vendor (1,A): Specify Y to indicate that this vendor is a one-time vendor. Otherwise, could you specify N. The system removes a one-time vendor's information from the Vendor Master file after all transactions are reconciled. If this vendor already exists as a one-time vendor, you can specify N to change the vendor to a regular vendor.

Determining whether to use Master Production Schedule (MPS) planning or Material Requirements Planning (MRP) planning for items in Infor LX and BPCS involves understanding the nature of the items and their demand characteristics.

Master Scheduled Items typically encompass finished goods or service items. These items receive their requirements either from Independent demand, Dependent demand, or a combination of both...

1345678910Last

Theme picker

Tips: LN | Baan

A serialized item is a physical occurrence of a standard item that is given a unique lifetime serial number. This enables tracking of the individual item throughout its lifetime, for example, through the design, production, testing, installation, and maintenance phases. A serialized item can consist of other serialized components.

In Service, a serialized item can be a customer-specific or owner-specific installation. Installation groups are a group of installations/serialized items such as photocopiers, computers, air conditioners, forklifts, lathe machines, and even aircraft.

A serialized item is identified by both the item code and serial number. You can set up the mask used to generate the serial numbers so the serial number includes some fields of the item data, such as the item group and the manufacturer.

In a multi-company structure, the companies can share the serialized item data. All the service departments in the various companies can refer to the same serialized items.

The serialized item can originate from a sales order or a project. The details of a serialized item indicate their origin, for example, by using specific sets of serial numbers for items that originate from sales orders and from projects. Serialized items can also originate from an as-built structure or directly from the production bill of material in Manufacturing.

In Service...

Are you striving to create shipping labels that cater to all your customers' needs? Do you require specific details on your shipping labels for particular items or product lines?

According to recent research, the global barcode label printer market was valued at $2.6 billion in 2022 and is estimated to reach $4.3 billion by 2032, exhibiting a CAGR of 5.2% from 2023 to 2032.

Crossroads RMC's RMClabel software automates the printing of customer-specific and item-specific labels...

1345678910Last

Theme picker

Categories