ERP & the Importance of Accuracy & Productivity

Infor LN & Baan

Kathy Barthelt 0 4758 Article rating: 5.0

If you don't think accuracy and productivity are important, you need to take a hard look at HOW you’re running your ERP system.

  • Have you eliminated large amounts of data entry?
  • Is your data error-free at month's end?
  • Do all of your systems talk to one another?

If the answer is no, Crossroads RMC can improve accuracy and productivity with system integration and/or automation.

Too expensive you say? Too time-consuming and way too much effort to make it happen? Not necessarily... 

Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3

AND Infor will no longer support LX and related products on IBM i 7.3 as of June 1, 2024

Crossroads RMC 0 4817 Article rating: 5.0

THE CLOCK is T I C K I N G ... 

MARK YOUR CALENDARS!
Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3  AND  in line with IBM’s support policy, Infor will no longer support LX and related products on IBM i 7.3 after May 31, 2024.

All Infor LX releases, patches, and related solutions will be...

Infor LN & Baan Tip: Considerations for Release to Warehousing for a Cost Item

Kathy Barthelt 0 8585 Article rating: 5.0

When there are two Cost Items, one with Release to Warehousing applied and the other with Release to Warehousing not applied, upon approval of the Sales Order, the Cost Item that is released to Warehousing will go straight to Staged status, pending Shipment confirmation, while the Cost Item that is not released to Warehousing will be up for Sales Deliveries.

Apart from this main difference in functionality between having and not having this option to release to Warehousing checked, there are other impacts to consider...

Reskilling and Upskilling Your Staff – Why You Shouldn’t Ignore This

Crossroads RMC 0 5765 Article rating: 5.0

According to the World Economic Forum, half of all employees will require significant reskilling or upskilling by 2025.

For many of you, your Infor ERP system was implemented 5, 10, 15, or 20+ years ago, and now there are only a handful of people left from that implementation if any at all. Since most of your "how and why" walked out the door, how much longer can you get by on “tribal knowledge”? While many companies understand the importance of employee training, implementing that training remains a challenge. What’s the best way to proceed you ask?

Infor LN & Baan Tip: What conditions must exist before changing an item's inventory unit?

Kathy Barthelt 0 7651 Article rating: 5.0

Is there a procedure for changing an item’s inventory unit? What conditions must exist before it can be done?

Once inventory transactions (receipts or issues) have occurred for an item, the inventory unit cannot be changed. If only orders have been placed against the item (sales or purchase), the inventory unit can be changed if these...

Infor LX & BPCS Tip: 4 Approaches to Customizing LX / BPCS - Preparing for a Future Upgrade

George Moroses 0 5785 Article rating: 5.0

How do I modify BPCS/LX to allow for the ease of upgrading in the future?

  1. Exit Points...

Is it time to get more out of your ERP?

Crossroads RMC 0 4912 Article rating: 5.0

As crazy as it sounds, we’re about to enter the 2nd half of 2023. How are you doing on your 2023 goals? Planning for 2024 projects?
Maybe it's time to get more out of your Infor ERP system.

OFF SUPPORT AND MAINTENANCE WITH INFOR AND FEEL STUCK?

⇒⇒ TIME TO UPGRADE?

⇒⇒ NOT UPGRADING?

RSS
First34568101112Last

Theme picker

Tips:  LX | BPCS | M3

Did you know that you can set up one-time vendors in LX? One Time Vendor (1,A): Specify Y to indicate that this vendor is a one-time vendor. Otherwise, could you specify N. The system removes a one-time vendor's information from the Vendor Master file after all transactions are reconciled. If this vendor already exists as a one-time vendor, you can specify N to change the vendor to a regular vendor.

Determining whether to use Master Production Schedule (MPS) planning or Material Requirements Planning (MRP) planning for items in Infor LX and BPCS involves understanding the nature of the items and their demand characteristics.

Master Scheduled Items typically encompass finished goods or service items. These items receive their requirements either from Independent demand, Dependent demand, or a combination of both...

1345678910Last

Theme picker

Tips: LN | Baan

Who gets involved?
  1. Most commonly Engineering is involved in writing the rules, creating the bills and routings.
  2. Sales or Customer Service determines the questions and the order they are asked in.
  3. Sales or Customer Service determines the rules for the pricing.
  4. Sales, or Customer Service, and Engineering work together in determining the part number, description and text.

What are the steps?

  1. You must start by defining the features and options (questions and answers) and the order in which these are asked. We work this out first using sticky notes and large easel paper. Normally during the process we find that we want to move these questions around. Setting them down on paper makes the process of getting the data into Baan much more efficient. We also then have a record of what decisions were made prior to entering the data. This is normally a joint effort of Engineering and Sales. This is required and must be the first step.
  2. Constraints for features and options. These are the rules for determining what questions are asked and which options are allowed. This is generally done by Engineering or whoever is responsible for the configurator. This is required.
  3. Generic Bill of Material. All possible bill options are entered here and constraints are written to determine which options are selected based on the answers to the questions. This is generally done by Engineering or whoever is responsible for the configurator. This is a required step.
  4. Generic Routing. Similar to the bill of material, but used for generation of the routing steps. This is generally done by Engineering or whoever is responsible for the configurator. This is optional.
  5. Generic Item Data. This consists of creating custom item numbers, descriptions, text, material, size or standard fields in the custom item master. This is generally done by Engineering or whoever is responsible for the configurator though Sales may have some involvement. This is optional.
  6. Generic Pricing. This is used to calculate the selling price based on the answers to the questions. This is normally a responsibility of Sales or whoever determines the pricing. This group is also trained on writing the constraints for this section only. This is optional.