Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 41227 Article rating: No rating
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

BPCS/LX Tip of the Week: The Item Master Requirements Code

Anthony Etzel 0 36795 Article rating: No rating

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

RSS
First152153154155157159160161Last

Theme picker

Tips:  LX | BPCS | M3

Did you know that you can set up one-time vendors in LX? One Time Vendor (1,A): Specify Y to indicate that this vendor is a one-time vendor. Otherwise, could you specify N. The system removes a one-time vendor's information from the Vendor Master file after all transactions are reconciled. If this vendor already exists as a one-time vendor, you can specify N to change the vendor to a regular vendor.

Determining whether to use Master Production Schedule (MPS) planning or Material Requirements Planning (MRP) planning for items in Infor LX and BPCS involves understanding the nature of the items and their demand characteristics.

Master Scheduled Items typically encompass finished goods or service items. These items receive their requirements either from Independent demand, Dependent demand, or a combination of both...

12345678910Last

Theme picker

Tips: LN | Baan

George Moroses

Infor LX & BPCS Tip: Infor ION - What is ION, and why do I need it?

Infor’s Intelligent Open Network (ION) technology easily integrates Infor ERPs and third-party enterprise systems. ION is an advanced middleware cloud platform that provides the flexibility you need to make the most complex web of enterprise systems work together on-premise, in the cloud, or both. ION’s long-term sustainability will optimize your ROI, and with ION, one application can be upgraded, replaced, or even fail without taking the entire network down.

Benefits:

  • Faster integration and upgrade times
  • Access to real-time information
  • Reduced burden on IT
  • Immediate access to business services like reporting and mobility

For older BPCS installations that don’t use ION, Crossroads RMC has the expertise to build powerful adapters to allow your specific BPCS version to communicate and exchange information with virtually any sub-system that can import/export data.
 

Infor ION Intro Video (2:11)

Get a free consultation

Print
14369 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

x

Categories