Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

ERP & the Importance of Accuracy & Productivity

Infor LN & Baan

Kathy Barthelt 0 4706 Article rating: 5.0

If you don't think accuracy and productivity are important, you need to take a hard look at HOW you’re running your ERP system.

  • Have you eliminated large amounts of data entry?
  • Is your data error-free at month's end?
  • Do all of your systems talk to one another?

If the answer is no, Crossroads RMC can improve accuracy and productivity with system integration and/or automation.

Too expensive you say? Too time-consuming and way too much effort to make it happen? Not necessarily... 

Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3

AND Infor will no longer support LX and related products on IBM i 7.3 as of June 1, 2024

Crossroads RMC 0 4785 Article rating: 5.0

THE CLOCK is T I C K I N G ... 

MARK YOUR CALENDARS!
Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3  AND  in line with IBM’s support policy, Infor will no longer support LX and related products on IBM i 7.3 after May 31, 2024.

All Infor LX releases, patches, and related solutions will be...

Infor LN & Baan Tip: Considerations for Release to Warehousing for a Cost Item

Kathy Barthelt 0 8527 Article rating: 5.0

When there are two Cost Items, one with Release to Warehousing applied and the other with Release to Warehousing not applied, upon approval of the Sales Order, the Cost Item that is released to Warehousing will go straight to Staged status, pending Shipment confirmation, while the Cost Item that is not released to Warehousing will be up for Sales Deliveries.

Apart from this main difference in functionality between having and not having this option to release to Warehousing checked, there are other impacts to consider...

Reskilling and Upskilling Your Staff – Why You Shouldn’t Ignore This

Crossroads RMC 0 5700 Article rating: 5.0

According to the World Economic Forum, half of all employees will require significant reskilling or upskilling by 2025.

For many of you, your Infor ERP system was implemented 5, 10, 15, or 20+ years ago, and now there are only a handful of people left from that implementation if any at all. Since most of your "how and why" walked out the door, how much longer can you get by on “tribal knowledge”? While many companies understand the importance of employee training, implementing that training remains a challenge. What’s the best way to proceed you ask?

Infor LN & Baan Tip: What conditions must exist before changing an item's inventory unit?

Kathy Barthelt 0 7594 Article rating: 5.0

Is there a procedure for changing an item’s inventory unit? What conditions must exist before it can be done?

Once inventory transactions (receipts or issues) have occurred for an item, the inventory unit cannot be changed. If only orders have been placed against the item (sales or purchase), the inventory unit can be changed if these...

Infor LX & BPCS Tip: 4 Approaches to Customizing LX / BPCS - Preparing for a Future Upgrade

George Moroses 0 5745 Article rating: 5.0

How do I modify BPCS/LX to allow for the ease of upgrading in the future?

  1. Exit Points...

Is it time to get more out of your ERP?

Crossroads RMC 0 4849 Article rating: 5.0

As crazy as it sounds, we’re about to enter the 2nd half of 2023. How are you doing on your 2023 goals? Planning for 2024 projects?
Maybe it's time to get more out of your Infor ERP system.

OFF SUPPORT AND MAINTENANCE WITH INFOR AND FEEL STUCK?

⇒⇒ TIME TO UPGRADE?

⇒⇒ NOT UPGRADING?

RSS
First34568101112Last

Theme picker

Tips:  LX | BPCS | M3

Did you know that you can set up one-time vendors in LX? One Time Vendor (1,A): Specify Y to indicate that this vendor is a one-time vendor. Otherwise, could you specify N. The system removes a one-time vendor's information from the Vendor Master file after all transactions are reconciled. If this vendor already exists as a one-time vendor, you can specify N to change the vendor to a regular vendor.

Determining whether to use Master Production Schedule (MPS) planning or Material Requirements Planning (MRP) planning for items in Infor LX and BPCS involves understanding the nature of the items and their demand characteristics.

Master Scheduled Items typically encompass finished goods or service items. These items receive their requirements either from Independent demand, Dependent demand, or a combination of both...

123456810Last

Theme picker

Tips: LN | Baan

Kathy Barthelt

Introducing VJES (Visual Job Execution Software)

You would be hard-pressed to completely miss the stories in the news recently about quality issues in manufacturing. The crux of the issue has been a complete focus on production and a lack of focus on quality. Yes, it is a wonderful thing to get the goods out the door, but when you’re sacrificing quality, what good is it really?

There are specifications for production for a reason. Engineering exists for a reason. If products are not built according to exact design specifications, scrap is likely to go up, rework goes up, customer returns and/or service requests go up, and customer satisfaction and overall customer confidence in your product plummets.

Is all of that worth it to get the good out the door in the shortest amount of time possible?

Every manufacturer relies on a few core measurements to manage their operations. Measurements like efficiency, productivity, capacity, labor and equipment utilization are used by manufacturers across the globe to benchmark performance and assess the effectiveness of processes.

Quality needs to be part of that mix. Because measurements like efficiency and productivity don’t necessarily mean high quality, incorporating ways to ensure quality from the start can help to eliminate waste and rework.

Manufacturing quality is achieved through quality control using documented, repeatable, and measurable processes.

What if you could incorporate quality control in every operation, at every work center to not only ensure high-quality finished goods but also simultaneously train high-quality operators?

Introducing Crossroads’ ERP independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface between engineering and the paperless manufacturing floor. VJES makes available only one version of the work instructions – the RIGHT one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES gives production personnel the best opportunity to build it right the first time and provides a way to track worker productivity during the build at every step.

VJES Overview

VJES achieves RESULTS:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improvement of quality score from 68/100 to 93/100 in 12 months
  • During the first month of use, employee training timeframe improved from 1 week, to 3 days.
  • First pass yield percentage at 100% for 8 months straight this year.
  • Able to incorporate a quality cell after productivity increased due to newfound bandwidth received when adopting VJES.


Request a demo or Contact us to learn more.

Print
2582 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

x

Categories