Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

DON'T MISS - 8 Ways to Modernize your IBM i product– Topic #1: Best practices for improving security

Thursday, February 15, 2024 - 10am EST | 9am CST

George Moroses 0 3028 Article rating: 5.0

From internal controls to data protection, elevate your company’s security standards by exploring best practices that enhance both data protection and segregation of duty issues. Risk Management, Audit, IT, and Finance Officers are all invited to hear strategies that are used by fellow IBM i (LX, XA, System21) customers for modernizing and strengthening their prior vulnerabilities. 

Hosted by Peg Tuttle from the IBM i podcast, “The Incredible i Show,” join us to hear insights from both Infor leadership and your industry peers on:

  • How version upgrades have tightened internal control loopholes.
  • Structural IBM i advancements designed to safeguard your organization.
  • IBM i ecosystem solutions that strengthen both data and access vulnerabilities.

Don’t miss this first fireside chat, Eight Ways to Modernize your IBM i product – Topic #1 of 8: Best practices for improving security.

Register today!

Join Crossroads RMC at inPOWER 2023

Frank Petrasio 0 4824 Article rating: 5.0

🌟 Unlock the Future of Infor LX at inPower 2023! 🌟

Are you ready to take your Infor LX experience to the next level?

Join us at the highly anticipated inPower 2023 conference, where innovation, expertise, and networking converge to shape the future of your enterprise.

📅 Event Dates: September 11-14 📍 Location: Ingleside Hotel, Pewaukee, WI

🔥 Top 10 Reasons to Attend:

Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3

AND Infor will no longer support LX and related products on IBM i 7.3 as of June 1, 2024

Crossroads RMC 0 4813 Article rating: 5.0

THE CLOCK is T I C K I N G ... 

MARK YOUR CALENDARS!
Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3  AND  in line with IBM’s support policy, Infor will no longer support LX and related products on IBM i 7.3 after May 31, 2024.

All Infor LX releases, patches, and related solutions will be...

Optimize with Infor Development Framework: IDF

Infor LX | BPCS | M3

George Moroses 0 6200 Article rating: 5.0

Why You Need IDF

The Infor Development Framework (IDF) not only helps you modernize the look and feel of your LX software but also the interactions of the IBM i software with other applications in your business.

“The IDF is a multi-user interface, single codebase architecture that’s metadata-driven (and) provides a lot of flexibility to adapt the software for their processes.” says Infor. This is the direction that Infor is going starting...

RSS
12345678910Last

Theme picker

Tips:  LX | BPCS | M3

Did you know that you can set up one-time vendors in LX? One Time Vendor (1,A): Specify Y to indicate that this vendor is a one-time vendor. Otherwise, could you specify N. The system removes a one-time vendor's information from the Vendor Master file after all transactions are reconciled. If this vendor already exists as a one-time vendor, you can specify N to change the vendor to a regular vendor.

Determining whether to use Master Production Schedule (MPS) planning or Material Requirements Planning (MRP) planning for items in Infor LX and BPCS involves understanding the nature of the items and their demand characteristics.

Master Scheduled Items typically encompass finished goods or service items. These items receive their requirements either from Independent demand, Dependent demand, or a combination of both...

12345678910Last

Theme picker

Tips: LN | Baan

To break down an item’s standard cost, sales price, or valuation price, use cost components. With cost components, you can compare estimated and actual costs, calculate production variances, and analyze costs in Standard Cost Calculation.

If cost components are set up in a detailed way, detailed records...

Ever wonder what the implications are of choosing one project status versus another?

Here is the explanation of project status possible values:

Free
You can carry out project engineering. This means that you can:

  • Define the project master schedule (PMS) by using the Project Control module.
  • Maintain the project structure.
  • Maintain the customized product structure by using customized bills of material and routing sheets.
  • Carry out project estimating.

Simulated
You simulate the rough capacity requirements planning...

First1314151618202122Last

Theme picker

Categories