BPCS/LX Tip of the Day: LX Inventory Pallet Status Flow

Four fields in the Item/Warehouse record (IIW file) affect the disposition of the

pallet status.

 

1.  Goods Receiving Code: You define these codes in Goods Receiving Maintenance (WHM130). The codes control whether or not the stock passes through inspection, what percentage, or quantity of a delivery to inspect, and the number of quarantine days, if any.

 

2.  Inspection Zone/Inspection Location: Either the Inspection Zone or the Inspection Location must be entered on the Item/Warehouse Master Maintenance screen WHM150D2-01.

 

3.  Default Inventory Status: If the status is 0 (Received) or 1 (Inspection), the item moves from the receiving location to the inspection location in inspection status. If the pallet status is not 0 or 1 (that is, 4 (Available) or 9 (Rejected)), the pallet moves to the inspection location with the default status, but the pallet will not proceed from the Inspection location to the Putaway location. You must manually move the stock.

 

4.  Pallet Status Codes: 0 (Received), 1 (Inspection), 4 (Available), and 9 (Rejected) are the only pallet status codes reserved by the system to update and advance inventory/pallet status. To do this Warehouse Management uses the following rules:

 

·    Rejected inventory goes from receiving to a Reject (type 9) Location with a Location Type A (Rejected) in the Location Extension file (ILE) record. All inventory received into a reject location is set to a pallet/inventory status of Reject (9).

·    Inventory received by Goods Receiving (WHM510) into a Receiving Location takes on the Default Inventory Status that is in the Item Warehouse file (IIW) record.

·    If the Default Inventory Status is 0 (Received), the system places the pallet status at 0 (Received) in the Receiving Location, I (Inspection) in the Inspection Location, and 4 (Available) if moved from Inspection to any palletized location other than rejection. If moved to rejection the Default Inventory Status changes to 9 (Rejected).

Previous Article McKinsey Quarterly - Next Frontiers for Lean
Next Article Barcodes and the Small Business Manufacturer
Print
34975 Rate this article:
No rating
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Did you know that you can set up one-time vendors in LX? One Time Vendor (1,A): Specify Y to indicate that this vendor is a one-time vendor. Otherwise, could you specify N. The system removes a one-time vendor's information from the Vendor Master file after all transactions are reconciled. If this vendor already exists as a one-time vendor, you can specify N to change the vendor to a regular vendor.

Determining whether to use Master Production Schedule (MPS) planning or Material Requirements Planning (MRP) planning for items in Infor LX and BPCS involves understanding the nature of the items and their demand characteristics.

Master Scheduled Items typically encompass finished goods or service items. These items receive their requirements either from Independent demand, Dependent demand, or a combination of both...

12345678910Last

Theme picker

Tips: LN | Baan

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

If Location Control is turned on in Baan IV, then inventory should never be negative.

If Location Control is not turned on in Baan IV, and the parameter “Negative Inventory Allowed” in INV Parameters is set to “NO”, then inventory should never be negative.

In Baan V and LN, the parameters in Inventory Handling Parameters determine whether you can have negative inventory. If these parameters are set to “NO”, then inventory should never be negative.