3 Essential Tactics to Increase Efficiency on the Manufacturing Floor

Crossroads RMC 0 49699 Article rating: No rating

From John O'Kelly's article on Manufacturing.net:

"Regardless of industry, efficiency gains and increased speed provide a competitive edge. The ever-increasing competition in the manufacturing world makes it necessary to find new, efficient ways to speed up the process while remaining accurate and productive. While flying robots and miracle technologies may promise to reshape the industry, we still have a way to go until full automation, and thus the most important asset on the manufacturing floor in 2019 will remain its people.

In 2019, the focus will undoubtably be increasing efficiencies, and this can be achieved through investing in employees, equipping them with the proper techniques and tools. An invested labor force will limit mistakes on the manufacturing floor and improve throughput at every level of the process."

Here are a few best practices to increase efficiency on the manufacturing floor in 2019:

  1. Invest in your labor force
  2. Prioritize quality assurance
  3. Improve labeling errors

You can read the full article with detailed descriptions at: https://blog.safe.com/

Optimize Your Manufacturing Today!

RSS
12345678910Last

Theme picker

Tips:  LX | BPCS | M3

Did you know that you can set up one-time vendors in LX? One Time Vendor (1,A): Specify Y to indicate that this vendor is a one-time vendor. Otherwise, could you specify N. The system removes a one-time vendor's information from the Vendor Master file after all transactions are reconciled. If this vendor already exists as a one-time vendor, you can specify N to change the vendor to a regular vendor.

Determining whether to use Master Production Schedule (MPS) planning or Material Requirements Planning (MRP) planning for items in Infor LX and BPCS involves understanding the nature of the items and their demand characteristics.

Master Scheduled Items typically encompass finished goods or service items. These items receive their requirements either from Independent demand, Dependent demand, or a combination of both...

12345678910Last

Theme picker

Tips: LN | Baan

In Baan IVC, plan items on the lowest plan level were automatically actual items (not product families). All plan items on higher plan levels were product families.

The relationship between a product family and items on lower plan levels was defined in a planning bill of material.

In Infor LN, every family item must be defined in the Item Base Data module. A family item can exist on any plan level. The relationship between a family item and items on lower plan levels is defined in aggregation relationships.

Aggregation relationships in Infor LN are much more flexible than the planning bills of material in Baan IV. For example, users can define aggregation relationships between items on the same plan level.

Baan uses the company calendar in the following modules to determine the start and end dates for planned orders:

  • Master Production Scheduling
  • Material Requirements Planning
  • Capacity Requirements Planning (All three combined in a single planning module for Baan V and LN)
  • Shop Floor Control

The calendar provides the valid working days, number of shifts per day and the number of hours in a day.

Baan allows for a single calendar for the whole company or for a calendar for each work center.