Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Navistar goes global with Crossroads RMC!

Kathy Barthelt 0 29598 Article rating: 4.7

Navistar, a leading manufacturer of commercial trucks, buses, defense vehicles, and engines, has selected Crossroads RMC’s data collection middleware to use for their global data collection solution. Implementation began in late 2018 with Navistar’s Illinois facility and will be completed in all other divisions by the end of 2019.

Don’t Let Malware Destroy Your ERP System!

Crossroads RMC 0 26313 Article rating: 5.0

We just got a report that another one of our customers has been affected by malware. In this case it wiped out their ERP server. We are working with them to restore it an get everything up and running again. It is highly likely that this got into their network by an email attachment. This seemed like a good opportunity to remind everyone to be extremely careful with email attachments. Even if it appears to be from someone that you know, email “From” addresses can be forged.

Best practice is to save the attachment to a folder, and run a virus scan before opening or viewing the file.

Baan/LN Tip: Credit Control Parameters (ACR Parameters)

Kathy Barthelt 0 114342 Article rating: 5.0

In the Credit Control Parameters, you can indicate if the same letter will be sent for reminding and action taken if amounts are zero or negative. The reminder letters work in conjunction with overdue sales invoices and the “Reminder Diary Margin.” When an invoice has passed its due date plus a certain margin of days, LN generates a reminder advice for the invoice. 

Crossroads Welcomes Ridewell Corporation – MES for Infor LX

Anthony Etzel 0 29608 Article rating: 5.0

Crossroads RMC welcomes Ridewell Corporation as our newest client having selected Crossroads MES (Manufacturing Execution System) for their shop floor automation with integration to Infor LX. 

Ridewell engineers and manufactures air-ride, rubber-ride, steel spring and mechanical suspension systems for the truck, trailer, RV and bus industries. The company has served the transportation industry since 1967 and holds many active patents for exclusive features that provide for low maintenance and superior ride quality.

Ridewell’s objective was to eliminate shop floor paperwork and manual processes, obtain real time performance metrics, and achieve greater visibility over manufacturing operations. After carefully conducting their due diligence they selected Crossroads MES to address these challenges.

Crossroads Manufacturing Execution System connects your manufacturing plant to the rest of your enterprise by using touch screen PCs on the shop floor. Powered by IBM I Power Systems, Crossroads MES fills the gap that exists between your ERP system and your lean manufacturing initiatives by modernizing and transforming the ERP experience. It delivers paperless shop packets to your entire workforce, captures live manufacturing data, and then delivers real-time status to your Tablet or PC.

Key Features include:

  • Paperless Shop Floor                               
  • Labor and Machine Time
  • Production Reporting
  • Material Issue
  • Scrap Reporting
  • Scheduling
  • Capacity Load Balancing
  • Label Integration
  • Dashboard Analytics                    

Crossroads MES provides information that helps manufacturing decision makers understand how current conditions on the plant floor can be optimized to improve production output.

Crossroads RMC is proud to have Ridewell Corporation as a client and we look forward to working together to support their company growth and success.

BPCS/LX Tip of the Week: Shelf Life Days and Retest Days

Anthony Etzel 0 60938 Article rating: 5.0

This feature provides the ability to enter information in the shelf life days and retest days fields for non-QMS lot controlled items, even when the QMS product is installed. The purpose of this enhancement is to allow the user to enter information for non-QMS lot controlled items even when QMS is activated in Parameters Generation, SYS800D. In previous versions, when QMS was activated, the Shelf Life Days and Retest Days fields in Facility Planning Maintenance (MRP140) and Item Master Maintenance (INV100) were not maintainable for non-QMS lot controlled items. The user is now able to change non-QMS lot controlled items even when a QMS product is installed.

Baan & LN Integration News: Playing Telephone Can Get You In Trouble

Kathy Barthelt 0 37725 Article rating: 5.0

Somehow information must be relayed from one person to another, and the “connection” (as it turns out) is pretty manual, and error prone.

How about moving into the 21st century and eliminate the manual effort. How about automating your integrations? Learn About Crossroads RMC Consulting

We have tied Baan and Infor LN to:

  • Warranty systems
  • CRM systems
  • Web portals
  • Automated batch picking systems, and so much more!

Contact me to find out how we can automate the communication between your systems, so you don’t have to worry about what got lost in translation.

Baan/LN Tip: New Mapping Scheme

Kathy Barthelt 0 87465 Article rating: 5.0
After a new mapping scheme is copied from an existing one, it is possible to check transactions in a simulation mode, before activating the new scheme. However, before the simulation can take place, the new mapping scheme needs to have completed the “Check Mapping Scheme” step. When the check is completed, a transaction can be simulated by highlighting it and from the Specific menu, selecting “Map with Specific Mapping Scheme.” Any errors can be corrected without having to activate the new mapping scheme.

Anthony Etzel- Featured Speaker at inPower 2019

Anthony Etzel 0 31163 Article rating: 4.5

Infor IDF is replacing green screens for inquiries and release LX 8.4 for file maintenance. This session will show you how to use IDF over your non-LX file. 
 

Many Companies have IDF and are not effectively using it. This session will cover:

  • Building a business object (Intergrator) 
    • How to create a logical expression
    • How to make a field a maintainable field with IDF
  • Views 
    • How to create custom views
    • How to navigate in IDF and create search subsets

First8384858688909192Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for OPERATIONS: Pegging Material Supply Lines for Operation and Product Subcontracting

For project pegged production orders, operations can be subcontracted. The material delivered to the subcontractor can be project pegged or anonymous. The subassemblies sent and retrieved are always project pegged. Costing breaks can be applied to direct the costs of the subcontracted operation to a specific project cost account. If (production material) costing breaks are used, a purchase order line's peg can differ from the peg on the material supply line.

For product subcontracting, the subcontracted purchase orders can include materials that inherit the project pegs or can include anonymous materials. The pegged materials are stored in inventory and are shipped to the subcontractor with project pegged orders.

In case of a project pegged order, a peg distribution is linked to the Purchase Order Material Supply Line in the Purchase Peg Distribution (tdpur5100m000) session. For a specific purchase order line (detail) and material sequence, the material supply line's Order and Consumption quantities are distributed across the peg distribution lines for combinations of project/budget, project element, and/or project activity. The peg information in the Purchase Peg Distribution (tdpur5100m000) session includes the line number for the peg in the distribution, the peg (project, element, activity), and the material supply line quantity by peg. The peg distribution cannot be manually created and must always be generated using the parent.

For operation subcontracting, the purchase order line, the material supply line, and the linked peg distributions are generated by Job Shop Control and can only be updated by Job Shop Control.

For product subcontracting, the purchase order line, the material supply line, and the peg distributions are generated by Procurement. A material supply line's peg distribution can be updated only from the parent, that is the purchase order line, the purchase order line peg distribution, or the material supply line. If a purchase order line's distribution line is changed, and no quantities are received or consumed yet, the pegged fields on the linked material supply lines are synchronized to the updated distribution line in the Purchase Order Material Supply Lines (tdpur4116m000) session. However, if a different quantity distribution is applicable, the quantities of the material supply lines' distribution lines are redetermined in the Purchase Peg Distribution (tdpur5100m000) session.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Currency Differences
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Load Audit Tables for Profile (ttaud3220s000)
Print
7330 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories