Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Baan/LN Tip: New Mapping Scheme

Kathy Barthelt 0 66341 Article rating: 5.0
After a new mapping scheme is copied from an existing one, it is possible to check transactions in a simulation mode, before activating the new scheme. However, before the simulation can take place, the new mapping scheme needs to have completed the “Check Mapping Scheme” step. When the check is completed, a transaction can be simulated by highlighting it and from the Specific menu, selecting “Map with Specific Mapping Scheme.” Any errors can be corrected without having to activate the new mapping scheme.

Anthony Etzel- Featured Speaker at inPower 2019

Anthony Etzel 0 26312 Article rating: 4.5

Infor IDF is replacing green screens for inquiries and release LX 8.4 for file maintenance. This session will show you how to use IDF over your non-LX file. 
 

Many Companies have IDF and are not effectively using it. This session will cover:

  • Building a business object (Intergrator) 
    • How to create a logical expression
    • How to make a field a maintainable field with IDF
  • Views 
    • How to create custom views
    • How to navigate in IDF and create search subsets

Pushing Forward In the Face of Adversity. Soundview recently suffered a major loss when fire struck on January 30, 2019.

Crossroads RMC 0 21841 Article rating: 5.0

Soundview Paper lost their main building when disaster struck. This building housed offices, their computer center and part of their manufacturing facility. The loss including hardware, networks, system data backups, etc. Crossroads RMC was contacted immediately to assist in the recovery of their BPCS V6 system. With limited backups and a full team effort, Crossroads RMC assisted in the acquisition of new hardware and are currently in the midst of helping to bring their system back to life. Soundview has secured support from various partners to make all this happen, and we are privileged to be part of the team. A lot of work has been done so far, but we have a long road ahead. Users will soon regain access by the end of this week,  and as required, Crossroads RMC will provide the necessary consulting support from our LX team to get Soundview back up and running. We are communicating with them daily, as we work thru this process.

BPCS/LX Tip of the Week: Facility Period Close

Anthony Etzel 0 46620 Article rating: No rating

The Facility Period Close process, as introduced in Infor LX 8.3.4, was designed to function interactively. 

The expectation was that clients with a continuous or 24-hour worldwide operation in multiple facilities would submit the Period End Close jobs for each facility as daily operations ceased or shifts ended for each facility. This process was designed to function interactively so that validations of users performing transactions that conflicted with period end processing, and resulting messages, were immediately sent to the period end user. 

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process. For example, a user has a 24-hour operation in facilities around the world, but a centralized IT operation. With this enhancement the user can submit the individual facilities to be closed to a batch process that can be managed by a scheduler, automatically releasing each facility to be closed at a predetermined time.

Flexfab Expands Their Use of Crossroads RMC Data Collection for All LN Installations Globally

Data Collection News

Kathy Barthelt 0 25076 Article rating: 5.0

Flexfab Horizons International, Inc, a global leader in the manufacture of high performance silicone and other advanced polimer products, has made the decision to expand their use of Crossroads RMC’s Data Collection Solution, RMC3, to their China location. The initial implementations in Nottinghamshire, UK and the United States took place in 2018, and the China implementation is expected to be completed by Q2 of 2019. All installations focus on improvements in warehouse management in Infor LN. Applications implemented include Receiving, Inspections/Approvals, Putaway, Stock Transfers and Stock Inquiry.

Crossroads RMC partnered with Electrolux Corporation to Connect Baan IVc4 to Vertex 8.0 (O Series)

Vertex Q to Vertex O… the ABC’s of tying this to Baan IV

Kathy Barthelt 0 22038 Article rating: No rating

Crossroads RMC partnered with Electrolux Corporation to Connect Baan IVc4 to Vertex 8.0 (O Series), and was able to successfully complete this project in under 3 months. This project was completed using Crossroads RMCconnector as a web service to read the Vertex tax data and pass the information back into Baan for further processing. Triggers were created to handle the following processes:

  • Sales Order Lines
  • Print/Reprint Order Acknowledgement
  • Print Sales Invoice (Both compose and final)
  • Purchase Order Lines
  • Purchase order Acknowledgement
  • Purchase Order invoice
  • Manual Finance Invoice (Compose, print and post)
  • Post Integration transactions
  • Finalize batch

Nazdaq has released Version 3.0 of B2Win Suite

Partner News

Kathy Barthelt 0 35945 Article rating: No rating

New Release of B2Win Suite: Format customer reports, email documents to your suppliers and customers, and more! 

New features – B2Win Suite - You are no longer limited to the data that comes from your canned reports! You can now add new columns to your already existing reports in Excel, based on SQL commands that bring additional data from any database (ERP or other), based on values from the report.

Existing Nazdaq customers should contact us to learn how we can convert your software to the latest and greatest Nazdaq product suite!

For more information: watch our webinar:

Webinar Recording: 48:18

Crossroads is proud to work with Johnson Crushers International on their LN re-implementation to 10.6

Kathy Barthelt 0 17706 Article rating: 5.0

Johnson Crushers International (JCI), a global leader in engineering and manufacturing full lines of cone crushers, horizontal and incline vibrating screens and track-mounted, portable and stationary crushing and screening plants, has selected Crossroads RMC to help them re-implement Infor LN on 10.6.  JCI’s main objectives with this project are to support their continued growth, align and standardize their business processes, and enable a continuous improvement effort to drive additional value to the business. Go live is expected to occur in early Q1 of 2020.

First7071727375777879Last

Tips:  LX | BPCS | M3

Item Facility Master has a new attribute to define the override inspection days lead time CICP.ICINSD.

  • When an item facility has a defined override inspection days lead time, that value will be used instead of the system parameter inspection days lead time.

MRP exception report, MRP200B
Purchase planning report, PUR285B
Purchase order / Requisition maintenance, PUR500D3
Purchase order consolidation / release, PUR640B1
Vendor splits, PUR653B

This enhancement improved the subfile utilized in MRP320D Master Schedule Detail Inquiry -SCR001 by expanding the subfile with data rather than clearing the subfile as user pages. This change provides full support for the WebTop 4.8 Grid decorator.

This enhancement updated the approach used to populate the subfile to allow a deployed Webtop Grid to function correctly. There is no visible or user-impacted change to the way the program functions.

This enhancement provides improved functionality and full support of a Webtop grid applied to the subfile.

Last

Tips: LN | Baan

Infor LN & Baan Tip of the Week: Reports to Analyze Company Performance

You know what data you need to analyze your company’s financial and production health, but sometimes it's a struggle to get that data in a format that is meaningful. Here are some reports in Baan IV, Baan V, and Infor LN which you may find useful.

As is the case with most ERP reports, with each version progression from Baan IV, to Baan V, to LN, there are improvements in selection criteria and report content. Some may require some setup and others may require some formatting if you would like to export them to Excel.  Contact me if you have questions or need assistance.

BAAN & LN FINANCE:

Baan IV –

Customer Statistics Module

  • Print Customer Statistics by Customer/Credit Analyst (tfcmg3400m000)
    • Prints Average Days Payment, Amount Paid, Average Days Outstanding, Amount Open, Discounts Allowed and Discounts Taken.  
       
  • Print Average Days Outstanding (tfcmg3401m000)
    • Prints Open Amount and Average Days Outstanding.
  • Print Average Receipt Days (tfcmg3402m000)
    • Prints Amount Paid and Average Number of Days for a Payment.


Cash Forecasting Module

  • Print Cash Forecast Summary by Period/Currency (tfcmg3410m000)
    • Prints Total Cash coming in from Sales Invoices, Sales Orders, Sales Quotes, Project Orders, and Budgets. Prints Total Cash going out from Purchase Invoices, Purchase Orders, Standing Orders, and Budgets.
       
  • Print Cash Forecast Summary by Date/Currency (tfcmg3411m000)
    • Prints the same as above but by a specific date.
       
  • Print Cash Forecast Details by Period/Currency (tfcmg3412m000)
    • Prints the same as above but by each period across in columns.
       
  • Prints Detailed Cash Forecast in Home Currency (tfcmg3413m000)
    • Prints each item, purchase order, sales order, etc, with forecast in home currency.


Baan V –

  • Print Finalized Transactions Ledger Account – tfgld1406m000
    • Output can be run to show transactions (debit/credit) by ledger account, transaction type, and time periods. This can be run by range of ledger account and/or range of periods.
  • Print Integration Transactions -tfgld4410m000
    • This has 3 options: a short version of the report, a standard version, and a version by company/ledger account.

Infor LN -

  • Print Finalized Transactions Ledger Account – tfgld1406m000
    • Output can be run to show transactions (debit/credit) by ledger account, transaction type, and time periods. This can be run by range of ledger account and/or range of periods.
  • Print Integration Transactions by Business Flow – tfgld4482m100
    • Output can be run to show all transactions (debit/credit) by business object (production/purchasing/sales)


BAAN & LN MANUFACTURING:

Baan IV

  • Print Actual Cost by Production Order ticst0401m000
    • This report can be run at any time in the production order’s life to show how hours-spent and material-used compare between estimated and actual usage.
       
  • Print Work Center Utilization By Week tiscf1402m000
    • This report shows capacity issues at work centers/machines which help identify production bottlenecks.


Baan V

  • Print Estimated vs Actual Material Costs ticst0401m000
    • This report can be run at any time in the production order’s life to show how actual material-used compares to estimated usage.
       
  • Print Estimated vs Actual Hour Costs ticst0402m000
    • This report can be run at any time in the production order’s life to show how actual hours-spent compares estimated hours.
       
  • Print Work Center Utilization By Week tiscf1402m000
    • This report shows capacity issues at work centers/machines which help identify production bottlenecks.


Infor LN

  • Print Estimated vs Actual Material Costs ticst0401m000
    • This report can be run at any time in the production order’s life to show how actual material-used compares to estimated usage.
       
  • Print Estimated vs Actual Hour Costs ticst0402m000
    • This report can be run at any time in the production order’s life to show how actual hours-spent compares estimated hours.
       
  • Utilization report from– Print Resource Order Plan cprrp0430m000
    • This report from Enterprise Planning will show all orders from planning and production. By incorporating both order types, capacity issues can be seen short range where planning has determined that new orders are needed, as well as long range where planners may find opportunities to shift work or even to plan machine maintenance.

Previous Article The Best Baan | Infor LN Manufacturing Reports to Analyze Company Performance
Next Article Infor LN & Baan Tip of the Week: Year End
Print
51984 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories