Infor LX / BPCS Tip of the Week: Control Date Lead Times in LX

George Moroses 0 61742 Article rating: 5.0
  • Control Date Lead Times – LX provides five separate Control Date Lead Time fields so you can specify additional lead time values for Shop Orders, Purchase Orders and Planned and Firm Planned orders. Each Control Lead Time Date represents additional time (days) required at each step in the process that needs more time (Quarantine, Stabilize), that is to say, when a component is due, and when it can be used. (working with an aerospace  precision bearing manufacturer, I had to account for the QA requirement that no measurements could be taken until the parts had been “soaked” (stored) in an atmospheric controlled environment (72 degrees, and controlled humidity) for 24 hours. This requirement added one full day of lead time between each machining operation) The MPS/MRP Generation program, as well as programs that Shop Order Material Allocation records use the five control date lead times to adjust component required dates to function in the same way as the BOM Offset Lead Time.
     
  • All programs that create MRP Planned Orders, MRP Firm Planned Orders, Shop Orders, and Purchase Orders call the Control Date Calculation program (MRP515B) to establish all five control dates. A Control Lead Time Date is used to adjust the component Required Dates data in the Material Requirements file (KMR), based on planned orders for a parent, and the FMA Required Dates data, based on shop order release dates for a parent.

Flexfab Goes Live with Crossroads Data Collection in China

Kathy Barthelt 0 37799 Article rating: 5.0

Flexfab Horizons International, Inc, a global leader in the manufacturing of high performance silicone and other advanced polymer products, goes live with Crossroads RMC’s Data Collection Solution, Web Collect, formerly RMC3, in their China facility. This represents the 3rd data collection go live for the Crossroads data collection solution within Flexfab with the US and UK going live in 2018. All installations focused on improvements in warehouse management in Infor LN 10.6. Applications implemented included Receiving, Inspections/Approvals, Putaway, Stock Transfers and Stock Inquiry.

Crossroads RMC is proud to partner with an American manufacturer of diagnostic healthcare

Integrated freight management solution for Infor LN 10.5.2 Cloud implementation

Kathy Barthelt 0 43136 Article rating: 5.0

An American manufacturer of diagnostic healthcare has selected the RMCship solution from Crossroads RMC to streamline their shipping process on Infor LN 10.5.2 in the cloud. They went live with one site running RMCship in June of 2019 and 3 more sites to follow by end of year. They will use RMCship to increase accuracy by eliminating manual steps and streamlining their operations.

Hunter Douglas Architectural Products Selects Crossroads RMC for LN 10.6 Upgrade Project

LN Upgrade 10.6

Kathy Barthelt 0 37358 Article rating: 5.0

Hunter Douglas, the world leader in window coverings and a major manufacturer of architectural products, has selected Crossroads RMC for their LN 10.2.1 to 10.6 upgrade project. Hunter Douglas has been an LN user for years, but due to a requirement from their parent organization to modernize their hardware/infrastructure, it was decided to update their ERP version as well. Phase 1 of the project will consist of a base technology upgrade with a Phase 2 planned for 2020. Phase 1 Go-Live is slated for January 1, 2020.

To learn more about our Infor LN & Baan Consulting, contact us at: 800.762.2077, email Kathy Barthelt, or visit our Services webpage.

Infor LN & Baan Tip of the Week: The Production Bill of Material – 10.7

Kathy Barthelt 0 184429 Article rating: 5.0

The production bill of material is globally specified at the company level. It can be used as a source for the definition of the local material lists, such as:

  • The production model in the repetitive module.
  • The production model in the job shop module.
  • The subcontracting model in the subcontracting module.

The production bill of material can be generated through the engineering bill of material. The new production bill of material differs from the old bill of material:

  • It has a header and a status.
  • It is always revision controlled.
  • The effective dates have been moved from the material lines to the header.
  • The BOM quantity has been moved from item production data to the header.
  • The use up has been moved from alternatives to the material line.
  • The material line excludes logistic data (no warehouse nor routing operation).

The production bill of material is not mandatory.

Production bill of material revisions:
The production bill of material is revision controlled. The objective of the revision is to control the changes to the bill of material over time.

The P-bom includes this revision-related data:

  • Revision number
  • Effective date and Expiry date
  • Status (New, Approved, Expired)
  • Creation date and Created by: user
  • Approval date and Approved by: user
  • Expiry date and Expired by: user
  • Source information

On Time Orders: OTTO - The Right Tools!

George Moroses 0 38524 Article rating: 5.0

Your business doesn’t run without the right people and processes in place, but in order for people to manage the right things at the right time, they need tools... the RIGHT tools

OTTO helps manufacturing plants consistently meet customer commitments, allowing supervisors and managers to spend more time analyzing, making decisions, communicating, and coordinating. We can prove that OTTO is the right tool for the job.

Give it a test drive for 30 days at no charge and see immediate results.

Contact George Moroses today to learn more.

First6768697072747576Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Infor LN & Baan: BIG DATA - Keeping Track of Key Metrics

In order to communicate effectively as a team, everyone needs to speak the same language and operate off the same playbook. If decisions are made based on the data or the view of data that individuals are maintaining through their own spreadsheets or other data silos, then communication is negatively impacted.

Manufacturers need to review large amounts of data every day, making it difficult to keep track of key metrics within your department.

That’s where Crossroads RMC’s Analytics Dashboard solution comes in. Our Analytics Dashboard was developed to make tasks easier by putting all of the key information in one convenient location so you can view all of your crucial data in real-time.
 

With powerful dashboards, you can:

  • Create pie charts, graphs, interactive maps, and more with just a few clicks.
  • Build a dashboard once and make it instantly available on any device.
  • Tell a story with your data with your own custom layouts, colors, and commentary—all with no coding.
  • Confidently provide reports with real-time data updates.
  • Access your dashboards from anywhere–computer, tablet, or phone.

Check out the sample of our dashboards by department below. Then, to get started, request a demo for a complete walkthrough of our Analytics Dashboard.
 

Manufacturing

OEE, time usage, downtime, quantities, cycle times, and more...

Enlarge Production Summary Dashboard Enlarge Work Center Job Step Status
Production Summary Dashboard Machine / Labor Performance Dashboard Work Center Job Step Status Dashboard



Finance

Revenue, income, working capital, assets, and more...

Enlarge Accounts Receivable Dashboard
Accounts Receivable
Summary Dashboard
Accounts Receivable
Dashboard
Enterprise Accounting
Dashboard


Materials

Planning, sourcing, procuring, transporting, storing, controlling materials, and more...

Enlarge Inventory Dashboard Enlarge Sales History Dashboard
Inventory Dashboard Purchasing Dashboard Sales History Dashboard

Learn more>
 

Contact us or Request a demo to Get Started.

Previous Article Infor LN & Baan Tip: How to deal with data growth of your ERP system…
Next Article Infor LN & Baan Tip: Backflushing of Materials & Hours
Print
130069 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories