BPCS/LX Tip of the Week: Understanding What Goes On – Out on the Factory Floor

Anthony Etzel 0 346 Article rating: No rating

Ok… so you want to know the status of a specific shop order that was released two days ago.

What do you do?

It’s a sure bet that you have a manager, supervisor, or planner who can walk the floor and find the order at whatever work center it happens to be at. He/she can then answer “what operations have been completed and how many were completed?” All this requires leg work, and of course, a fair amount of time.

Now, if you have setup your BPCS master files properly, and you report transaction activity, you should be able to get those shop order statuses much faster using the SFC300 Shop Order Inquiry Screen.

At your fingertips you can see:

  • Release date & due date
  • How many hours remain in total and at each operation
  • The quantity required, what was finished and the remaining quantity
  • What components (materials) have been issued

Pretty basic information, right? Are you getting what you need to know? If not, then you may want to reexamine how your BPCS files are setup and what transactions along with their frequency are captured.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 178 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

BPCS/LX Tip of the Week: Indirect Time

Anthony Etzel 0 1002 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.
 

  1. If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  2. If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

 

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

 

10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 38032 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 73575 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 80859 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 32293 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

First121122123124126128129130Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE: Clear Rounding Differences for Documents with Period Change (tccri7214m000)

Use this session to adjust the rounding difference transactions, calculated during the internal conversion, for inter-period postings.

Inter-period postings are the postings made to the ledger accounts defined in the Finance Company Parameters (tfgld0503m000) session for fiscal and reporting period changes.

If inter-period postings exist, very big rounding differences are calculated . If you run this session, those rounding differences are replaced with values that properly deal with an observed period change.

If inter-period postings exist, during the internal conversion rounding differences can be calculated for the wrong period. If you run this session, those rounding differences are deleted and the rounding differences are created for the correct period.



OPERATIONS: Sales Contract Linked Documents (tdsls3506m000)

Use this session to view the documents linked to a sales contract. You can view these documents only when a sales order line or a sales schedule line is linked to a sales contract line.

Note: 

  • You can view this session only if the Contracts check box is selected in the Sales Parameters (tdsls0100s000) session.
  • You can use the Linked Document option from the References menu to view the details of a specific linked document.


Field Information

Contract: The code of the sales contract.

Description: The description of the sales contract

Line: The sequence number of the sales contract line.

Sales Office: The code of the sales office.

Description: The description of the Sales Office

Linked Document: The document type that is linked to the sales contract line.

Note: This field can be set to Sales Order Line or Sales Schedule Line only.

Linked Document Company: The company in which the document is linked to the sales contract line.

Linked Document: The code of the document that is linked to the sales contract line.

Note: 

  • The code of the sales order is defaulted from the Order Line field in Sales Order Lines (tdsls4101m000) session.
  • The code of the sales schedule is defaulted from the Schedule field in the Sales Schedule Lines (tdsls3107m000) session.

Linked Document Reference: The reference number of the linked document.

Note: 

  • The line number of the sales order line is defaulted from the Line field in the Sales Order Lines (tdsls4101m000) session.
  • The line number of the sales schedule line is defaulted from the Line field in the Sales Schedule Lines (tdsls3107m000) session.

Link Sequence: The sequence number of the linked document.


TECHNOLOGY: Audit Fields by Table (ttaud3125m000)

Use this session to to define which fields must be audited, and when they must be audited.

Note: 

  • It is not required to define the fields that must be audited. Only if not all fields in a table must be audited, you must specify the fields that must be audited. You can only specify fields for a table for which you selected Specified in the Field Selection field of the Audit Tables by Profile (ttaud3120m000) session. If you selected All in that field, all fields in the table are audited, and no fields can be specified.

  • For a detailed explanation of the relation between audit type and field specification, refer to the section How to determine the net result of the audit configuration in the Audit Configuration Management topic.

  • The audit functionality uses the positive approach, which means that you can only specify which tables and fields must be audited, but not which tables and fields must not be audited. Therefore, through the appropriate menu, commands are available to load all (key) fields. You can then delete the fields you do not require.
     

Previous Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Load Audit Tables for Profile (ttaud3220s000)
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Clear Rounding Differences for Documents with Period Change (tccri7214m000)
Print
574 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories