Baan/LN Tip of the Day: Multi-Company Warehousing 10.4

Kathy Barthelt 0 435 Article rating: No rating

You can define internal trade relationships between enterprise units or individual warehouses of the same logistic company for the transfer of material, labor, or other costs between warehouses, and to generate invoices for these without using sales orders and purchase orders. For example, you can use this to transfer goods between warehouses in different countries.


You can define warehouse surcharges, which are added to the actual costs of the goods either when the goods are issued from a warehouse or when the goods are received.

BPCS/LX Tip of the Day: MRP/MPS Simulation in LX

Anthony Etzel 0 785 Article rating: No rating

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 1943 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

BPCS/LX Tip of the Day: Cost Accounting – LX

Anthony Etzel 0 868 Article rating: No rating

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

▪ Four sets of costs: actual, standard, frozen standard, and simulated

▪ Nine user-defined elements per set

▪ Full and partial cost roll-up and simulation

▪ Cumulative in-process cost tracking

▪ Cost summaries by item

▪ Cost definition tied to work centers or material type

▪ Process hour costing

Baan/LN Tip of the Day: Vendor Rating

Kathy Barthelt 0 1416 Article rating: No rating

In LN, a supplier's reliability is no longer based only on correct deliveries. The vendor rating functionality of LN is based on various objective criteria and subjective criteria that can be used to calculate the vendor’s rating.

 

The set up procedure for analyzing suppliers has changed completely compared to Baan IV.  To execute the vendor rating process, users must update the vendor ratings in the Update Vendor Rating (tdpur8850m000) session.

If users update the vendor ratings, the following stages exist in the update vendor rating procedure:


1. Calculate actual weightings

2. Calculate ratings for objective criteria

3. Calculate ratings for subjective criteria

4. Update overall vendor rating

Baan/LN Tip of the Day: Release Commissions/Rebates to Invoicing

Kathy Barthelt 0 3103 Article rating: No rating

In Baan IV, this session is called Release Commissions/Rebates to Invoicing (tdcms2201m000) and is used to set the status of the commissions/rebates to Reserved, or Closed. In Infor LN, this session is only used to set the status to  Closed. Users can reserve commissions/rebates in the Reservation and Approval of Reserved Commissions/Rebates (tdcms2202m000) session. In addition, the following fields are added to the Release Commissions/Rebates to Invoicing (tdcms2201m000) session:

▪ Commissions to Accounts Payable

▪ Rebates to Central Invoicing

BPCS/LX Tip of the Day: How Does LX Fit in With Just-In-Time?

Anthony Etzel 0 364 Article rating: No rating

For years, repetitive manufacturing industries have been applying many of the principles in Just-in-Time philosophy. They have established balanced production lines that depend on a steady flow of material to each work station. They schedule production in daily or weekly rates rather than in discrete shop order lots. They track finished inventory by work center rather than by job. They typically backflush stock balances (decrement stock balances upon completion of specific manufacturing steps rather than issued at the beginning of each production run).

 

Costing is typically based upon a daily rate or hourly rate rather than being associated with specific shop orders. 

 

Repetitive manufacturers use MRP II software adaptable to their environments

in the following key areas:


 Product definition

 Inventory tracking

 MRP/Master Scheduling

 Shop Floor Control

 Purchasing

 Costing

BPCS/LX Tip of the Day: What is Just-In-Time?

Anthony Etzel 0 313 Article rating: No rating

Just-in-Time (JIT) is a management philosophy that focuses on minimizing the resources necessary to add value to your products and to operate your factory in ways that eliminate waste. Resources are labor, materials, equipment, space, and time. Waste is anything that does not add value to your products. Moving work-in-process from place to place, stacking and sorting, investing capital in large work-in-process and raw material inventories, inspecting materials at your vendors' sites, and tying up warehouse space with finished goods are all activities that add cost, not value, to your products. 

JIT is a process that reduces lead time. JIT does not replace an MRP, an inventory program, a scheduling technique to bypass your Master Schedule, or a materials management project. JIT is the never-ending commitment of everyone, from top management to your workers on the floor, to maximize your effectiveness through continuous, incremental improvements.

First117118119120122124125126Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE: Clear Rounding Differences for Documents with Period Change (tccri7214m000)

Use this session to adjust the rounding difference transactions, calculated during the internal conversion, for inter-period postings.

Inter-period postings are the postings made to the ledger accounts defined in the Finance Company Parameters (tfgld0503m000) session for fiscal and reporting period changes.

If inter-period postings exist, very big rounding differences are calculated . If you run this session, those rounding differences are replaced with values that properly deal with an observed period change.

If inter-period postings exist, during the internal conversion rounding differences can be calculated for the wrong period. If you run this session, those rounding differences are deleted and the rounding differences are created for the correct period.



OPERATIONS: Sales Contract Linked Documents (tdsls3506m000)

Use this session to view the documents linked to a sales contract. You can view these documents only when a sales order line or a sales schedule line is linked to a sales contract line.

Note: 

  • You can view this session only if the Contracts check box is selected in the Sales Parameters (tdsls0100s000) session.
  • You can use the Linked Document option from the References menu to view the details of a specific linked document.


Field Information

Contract: The code of the sales contract.

Description: The description of the sales contract

Line: The sequence number of the sales contract line.

Sales Office: The code of the sales office.

Description: The description of the Sales Office

Linked Document: The document type that is linked to the sales contract line.

Note: This field can be set to Sales Order Line or Sales Schedule Line only.

Linked Document Company: The company in which the document is linked to the sales contract line.

Linked Document: The code of the document that is linked to the sales contract line.

Note: 

  • The code of the sales order is defaulted from the Order Line field in Sales Order Lines (tdsls4101m000) session.
  • The code of the sales schedule is defaulted from the Schedule field in the Sales Schedule Lines (tdsls3107m000) session.

Linked Document Reference: The reference number of the linked document.

Note: 

  • The line number of the sales order line is defaulted from the Line field in the Sales Order Lines (tdsls4101m000) session.
  • The line number of the sales schedule line is defaulted from the Line field in the Sales Schedule Lines (tdsls3107m000) session.

Link Sequence: The sequence number of the linked document.


TECHNOLOGY: Audit Fields by Table (ttaud3125m000)

Use this session to to define which fields must be audited, and when they must be audited.

Note: 

  • It is not required to define the fields that must be audited. Only if not all fields in a table must be audited, you must specify the fields that must be audited. You can only specify fields for a table for which you selected Specified in the Field Selection field of the Audit Tables by Profile (ttaud3120m000) session. If you selected All in that field, all fields in the table are audited, and no fields can be specified.

  • For a detailed explanation of the relation between audit type and field specification, refer to the section How to determine the net result of the audit configuration in the Audit Configuration Management topic.

  • The audit functionality uses the positive approach, which means that you can only specify which tables and fields must be audited, but not which tables and fields must not be audited. Therefore, through the appropriate menu, commands are available to load all (key) fields. You can then delete the fields you do not require.
     

Previous Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Load Audit Tables for Profile (ttaud3220s000)
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Clear Rounding Differences for Documents with Period Change (tccri7214m000)
Print
574 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories