Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Inventory Control

Anthony Etzel 0 61138 Article rating: 1.0

Is Lot Control necessary?

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

BPCS/LX Tip of the Week: Alternate Items

Anthony Etzel 0 59001 Article rating: No rating
How can I use an alternate item on a shop order?

The best way is to have the approved alternate item appear on the Bill of Material just after the standard item with a zero required quantity. Now the alternate item will appear on the Shop Order. So, if the standard item is not available, the alternate item can be issued to the shop order.

When the shop order is closed out, one item will have an unfavorable variance while the other shows a favorable variance. This is an easy way to provide alternate items provided engineering approves and they are part of the Bill of Material.

Baan/LN Tip of the Week: Negative Inventory

Kathy Barthelt 0 57992 Article rating: No rating

If Location Control is turned on in Baan IV, then inventory should never be negative.

If Location Control is not turned on in Baan IV, and the parameter “Negative Inventory Allowed” in INV Parameters is set to “NO”, then inventory should never be negative.

In Baan V and LN, the parameters in Inventory Handling Parameters determine whether you can have negative inventory. If these parameters are set to “NO”, then inventory should never be negative.

BPCS/LX Tip of the Week: User Defined Transactions

Anthony Etzel 0 62602 Article rating: No rating

When to use a user defined inventory transaction

ERP LX (BPCS) provides you with the flexibility to create inventory transactions without program modifications. The typical transaction types are defined with effects set on how the transaction will impact inventory balances.

Perhaps you want to process a customer return and don’t want to the inventory to be impacted. You can create a user define transaction effect to allow the customer receipt and not update the inventory balance.

Baan/LN Tip of the Week: Old Porting Set

Kathy Barthelt 0 55213 Article rating: No rating

Here are some issues that you might run into if you stay on an old porting set too long:

  • Incompatibility because of operating system patches
  • Printing issues because of out-of-date libraries
  • Potential performance issues if binaries are not updated
  • Updating third-party products may not be possible because of dependencies
  • Limited support from Infor
  • Issues with updating database software/patches because of dependencies (if the database is also running on the same server as the application)

Need help getting on a newer porting set? Let us know! We’d be happy to help.

Crossroads MES Released for Windows 10

Anthony Etzel 0 29452 Article rating: No rating

Crossroads RMC is pleased to announce the availability of Crossroads MES, V11 for Windows 10. Any customers wishing to upgrade from a previous version to V11 can do so by contacting  support@crossroadsrmc.com. As previously announced, Crossroads MES  is also compatible with tablet PCs running Windows 8.1. Tablet PCs are becoming the clipboard replacement for supervisors and managers to monitor what’s happening on the shop floor.

BPCS/LX Tip of the Week: Shop Order Release Date

Anthony Etzel 0 65670 Article rating: No rating

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 62855 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

First118119120121123125126127Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Infor LN & Baan Period End & Fiscal Year End Processing Checklist

Year-end is always a busy time and it is easy to forget things that must be done in your ERP system to close out the year properly and also set you up for a good start to the following year. Here are some things that you should make sure to add to your to-do checklist:

The year-end close process provides an opportunity to:

_____ Remove discontinued items.

_____ Remove sold purchase receipts.

_____ Remove lot attributes for sold lots.

_____ Update standard cost based on current cost field (for environments without Manufacturing only).

Prepare for Year-End Close

_____ Conduct full physical inventory and update quantities before actual year-end or establish a strong cycle-counting program.

_____ Check for any applicable sales and purchase invoices/returns and post.

_____ Prepare users for a year-end push to complete all year-to-date inventory adjustments, receipts, and invoicing.

_____ Determine how to handle new year transactions without posting.

_____ Determine what new standard costs should be entered for the upcoming year. (Manufacturing)

_____ Discuss cutoff dates for removing Archived BOMS and Closed/Canceled Mfg Orders. (Manufacturing)

Finance Specific Items:

_____ Set up the financial periods for 2022 (fiscal, reporting, and tax, as applicable).

_____ Open period January in 2022.

_____ Finalize any outstanding transactions from the current year (2021).

_____ Soft-close any open periods in 2021.

General Baan/LN Tips:

_____ Issue any old sales invoices.

_____ Fix any outstanding financial integration errors.

_____ Set up new integration mapping for 2022 as needed.

_____ Test the mapping in a test environment prior to the new year.

_____ Review & update jobs as needed to ensure they will process in 2022.

_____ Determine for cash-flow purposes, what purchase invoices won’t be paid until 2022.

_____ Make sure that calendars are set up for the new year with holidays properly indicated.

_____ Check jobs to make sure any that are hard-coded with dates will point at the new year.


Want even more tips for year-end processing? See the following documents in the Infor Knowledge Base:

 KB 

 Content 

 1879191  

 Document including step by step procedure, possible error/warning messages, and more (Infor LN) 

 1147023 

 Step by step procedure description (Infor LN)

 1116239 

 Step by step procedure description (Infor LN)

 1117334

 Step by step procedure description (Infor LN; Portuguese)

 1171300 

 Step by step procedure description (Baan IV) 

Need help? Contact us and we’ll be happy to walk you through what needs to be done to ensure that everything is done correctly and completely. 1.800.762.2077 or solutions@crossroadsrmc.com

Previous Article Infor LN & Baan Tip: Using the “Use Up” Functionality in Infor LN
Next Article Infor LN & Baan | Infor LX & BPCS Tip: Time for the dreaded three words?
Print
65381 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories