Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 62419 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

Filtec Selects Crossroads RMC for Baan Data Collection

Kathy Barthelt 0 29803 Article rating: No rating

Filtec, a leading provider of in-line inspection solutions for the food, beverage, and pharmaceutical industries, has selected the Web Collect, formerly RMC3 data collection solution from Crossroads RMC for their Baan IV system. Filtec plans to implement Labor Reporting and Report Operations Complete as part of this project with the goal of eliminating manual data entry and gaining better visibility to gap time. The project is scheduled to go live in early November 2015.

BPCS/LX TIP OF THE DAY: MATERIAL REQUIREMENT DATES AND LEAD TIME OFFSETS IN MRP

Anthony Etzel 0 65525 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

Baan/LN Tip of the Week: Data Sizing Moving to LN

Kathy Barthelt 0 62960 Article rating: No rating

The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume.  Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 62773 Article rating: 3.0

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items

Kathy Barthelt 0 71506 Article rating: 3.0

If you have a parts warehouse and prefer to use SIC for planning (re-order point) but need to use MRP/MPS planning for production, create a non-nettable warehouse for the parts warehouse and run the SIC plan against that warehouse.

When running the SIC plan, be sure to set the Order System to “MPS to MRP” for Baan IV and to “Planned to Planned” for Baan V and LN.

Using this method you keep the parts inventory out of the production planning and in the hands of the parts warehouse planner.

BPCS/LX Tip of the Week: Indirect Time Reporting

Anthony Etzel 0 61672 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.

  • If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  • If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

Baan/LN Tip of the Week: Differences Between Constraint Planning in Baan IV and Enterprise Planning in LN

Kathy Barthelt 0 58159 Article rating: No rating

In Baan IV, a distinction is made between the actual ERP system and a separate planning tool which contains the Constraint Planning package. This tool was intended to work with any ERP system, not just with Baan IV. The Enterprise Planning package is now considered to be a package like any other package in Infor LN.

Users of Baan IV could choose whether they wanted to plan their supply in one of the following ways:

  • By using the MPS and MRP modules in the Manufacturing package.
  • By using the RPD and RMP modules in the Constraint Planning package.

Users of Infor LN can only use the Enterprise Planning package. The distinction between the MPS items and MRP items has been abandoned. In Infor LN, all items can be planned by using a combination of master-based planning methods and order-based planning methods.

First117118119120122124125126Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for FINANCE: Using Dimensions

You can independently define dimensions and use them to prepare analyses of ledger account transactions and balances. You can use up to 12

dimension types. You can define a name and an entire structure of dimension codes for each of these dimension types. There is no relationship between the dimension types.

For example, you can set up these dimensions:

  • Dimension Type 1 = Cost center
  • Dimension Type 2 = Item group
  • Dimension Type 3 = Business unit
  • Dimension Type 4 = Geographical area
  • Dimension Type 5 = Activities

You can separately define the dimension structure for each of these dimension types, in other words, you can set up a dimension structure for the cost centers, a structure for item groups, and so on.

You can define the number of dimension types that you use in the Group Company Parameters (tfgld0101s000) session. If you have several financial companies in a company group, the dimension types used apply to all the companies in the group.

You can name the dimension types and define linked objects in the Dimension Type Descriptions (tfgld0102m000) session. You can then define the dimension codes to be used in each company in the Dimensions (tfgld0510m000) session. You can also make multilevel dimension structures with totals and subtotals. You can build a dimension hierarchy of up to ten levels.

In the Dimensions (tfgld0510m000) session, you can define the dimensions for each dimension type, and link the dimensions to parent dimensions and child dimensions.

Dimensions are always used together with ledger accounts. For each ledger account, you can define which dimension type or types are linked to the ledger account in the Chart of Accounts (tfgld0508m000) session. For each dimension type, you must select whether the dimensions type is MandatoryOptional, or Not Used by the ledger account.

When you enter a transaction, you must first state the ledger account. Then you must enter a dimension for each Mandatory dimension type that is linked to the ledger account, and you can enter a dimension for each Optional dimension type.

For example, the sales revenues ledger account is linked to dimension type 2 (item group) and dimension type 4 (area). The dimension type 1 (cost center) and dimension type 3 (business unit) are not used for the ledger account. The freight costs ledger account is linked to only dimension type 1 (cost center). The other dimension types are not used for the ledger account.

For each dimension type, you can define one dimension with an empty dimension code. If the dimension type is Optional for a ledger account, LN posts transactions for which no dimension is specified to this dimension. In this way, differences between the ledger history and the dimension history can be avoided.

In the Cross Validation Rules (tfgld0151m000) session, you can define the ranges of allowed dimensions by ledger accounts. You cannot change the dimension range for a ledger account that occurs in an unfinalized batch.

You can create transactions for Financials from the integration with other LN packages. You can enter these transactions into ledger accounts and into dimensions. You can define the assignment to ledger accounts through the Mapping Scheme (tfgld4573m000) session.

You can use the dimensions to split the transactions on the customer and supplier control accounts by departments, persons responsible for the revenues, costs, properties, debts, and so on.

The dimensions also provide the basis for the cost allocation in the Cost Accounting module. In CAT, you can allocate the costs (and any revenues) within a dimension type from one dimension code to another and from one dimension type to another.

Previous Article Infor LN & Baan Tips & Tricks for EXECUTIVES
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: High Contrast Skin