Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC Moves Arrowhead from 4.0.05CD to Infor LX

Crossroads RMC 0 34853 Article rating: 5.0

Arrowhead Products, a world leader in the design, development and manufacture of ducting systems for aircraft and propulsion lines for rocks, has partnered with Crossroads RMC to move from BPCS 4.0.05CD to Infor LX. Crossroads RMC is providing financial business consulting as part of this project. Go live is expected in Q4 of 2017.

Baan/LN Tip of the Week: What Could go Wrong With GRINYA?

Kathy Barthelt 0 212395 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan/LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

It is recommended that the Integrations Setup tables be audited either through Baan or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Still have GRINYA questions you need answered?
Contact us. We’d be happy to help.

Optimize Your Manufacturing Today!
 

BPCS/LX Tip of the Week: Efficiency– The What & How

Anthony Etzel 0 52505 Article rating: No rating

Efficiency is something we all strive for in our personal lives and at work. How can manufacturers increase their efficiency? Take a hard look at the 4 key areas:

  1. Planning
  2. Bill of Material and Job Accuracy
  3. Inventory Planning
  4. Real Time Reporting / Processing 

Need help figuring out how to become more efficient in each of these areas? Contact us, we’d be happy to help.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Actual Versus Standard

Anthony Etzel 0 52967 Article rating: No rating

Job costing based on standards is great, but what if reality doesn’t match up to that?

What if jobs are really taking twice as long, and you don’t know that? What if jobs are taking ½ as long as you think, but you’re scheduling based on how much time they “should” take? Either way, you’re losing money and productivity. Getting a handle on start/stop times for jobs, and therefore the total amount of time actually spent allows you to take proper action and be more productive.

 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Project Templates

Kathy Barthelt 0 195508 Article rating: No rating

Project templates are useful because you can specify all of the information that you would normally want to include when creating a new project such as project structure, budget and so on.

In Baan IV/V, project templates do not exist, but you can set up a project template by creating a regular project, and setting the status to simulated or free. This is done so that the project does not create plans. Under this scenario, you can easily copy one project to another.

In LN, when you create a new project, a template can be used as the starting point. This is similar to copying a normal project, but unlike normal projects, no costs or revenues can be posted on a template.

Optimize Your Manufacturing Today!

 

Infor LX and Crossroads MES Selected by Blonder Tongue

Crossroads RMC 0 33896 Article rating: No rating

Blonder Tongue, a global communication equipment supplier for TV broadcasters, cable system operator, lodging video, Internet system, and institutional systems, has selected Crossroads RMC to assist them with a BPCS 6.0.04 upgrade to Infor LX. Crossroads RMC will be providing all applications and technical consulting for this project. Also included as part of the project will be the implementation of the Crossroads MES solution. Go live for both solutions is expected in January of 2018.

BPCS/LX Tip of the Week: LX 8.3.5 Facility Period Close

Anthony Etzel 0 46896 Article rating: 5.0

The Facility Period Close process was introduced in Infor LX 8.3.4 and has been enhanced in 8.3.5. This feature allows continuous or 24-hour worldwide operations in multiple facilities to submit Period End Close jobs for each facility as daily operations cease, or shifts end.

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process.

Optimize Your Manufacturing Today!

First9394959698100101102Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Materials Tip: Sales Quotations

Sales quotations are used to supply a sold-to business partner with the required details to make a purchasing decision.

You can create a sales quotation in response to a request for quotation (RFQ) from a business partner, or as a sales tool to initiate the sales process with potential business partners. A quotation includes the dates, terms, items, or item descriptions to be sold, and a success percentage, which reflects the level of certainty that the quotation will be accepted. Sales quotations are included in the planning modules based on their success percentages. Quotations with a high success percentage are considered as sold.

You can print and send quotations to business partners. You can specify the results of the returned quotations in Sales. If the quotation is not accepted, you can specify the reason for failure and the competitor who won the quote. If the business partner accepts the quotation, you can transfer the quotation to a sales order and specify the reason for success.

Sales quotation procedure - The normal sales quotation procedure includes the creation, printing, specification of results, and processing of sales quotations.

Additional processes - A number of processes do not always occur in the sales quotation procedure, but can be used optionally, such as ATP and CTP checks, creating alternative quotation lines, and copying bill of material components to a sales quotation.

Inserting items from a catalog - You can add items from a catalog to a sales quotation.

Product variants -  You can configure or link product variants for generic items on the sales quotation line.

Price stages - You can link a price stage to a sales quotation line. When processing the quotation to a sales order, the price stage is copied from the quotation line to the sales order line. Sales order lines can be blocked based on the price stage.

Material price information - You can link material price information to a sales quotation line. As a result, the (document line) price on the sales quotation line includes material prices.

After-sales services -  You can specify the after-sales services that will apply to a sold item after delivery. When processing a quotation to a sales order, the after-sales service data is copied from the sales quotation to the sales order.

Project pegging in sales - To identify costs, demand, and supply for a project, you can peg project costs for sales quotation.

Previous Article Infor LN & Baan Finance Tip: What Can You Do in the Financial Statements Module?
Next Article Infor LN & Baan Tip: Job Management
Print
69216 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories