Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

FSB North America Streamlines Their Shipping on Infor LN with RMCship

Kathy Barthelt 0 24463 Article rating: 5.0

FSB North America, a leading producer of high quality electrified and mechanical locking devices, has selected the RMCship solution from Crossroads RMC to streamline their shipping process on Infor LN and the integration with FedEx® and UPS Worldship™. Using Web Collect formerly RMCship for shipping increases accuracy by eliminating manual steps, streamlines operations, and process steps, and improves customer satisfaction.

BPCS/LX Tip of the Week: Vendor Evaluation

Anthony Etzel 0 44143 Article rating: No rating

Want to ensure that you have the materials you need when you need them?Want to gain insight into your ability to fulfill current and future orders timely? 

Consider implementing a method of evaluating your suppliers. A good understanding of your suppliers’ capabilities and past performance allows you to better plan and deliver orders on time to your customers. 

Some ERP systems have built in features to track supplier performance data. Reports can also be written to gather the information you need.  By whatever means you can achieve it, getting those results could be eye opening and very meaningful to your business.

Baan/LN Tip of the Week: Vendor Evaluation

Kathy Barthelt 0 77927 Article rating: No rating

Want to ensure that you have the materials you need when you need them?

Want to gain insight into your ability to fulfill current and future orders timely? 

Consider implementing a method of evaluating your suppliers. A good understanding of your suppliers’ capabilities and past performance allows you to better plan and deliver orders on time to your customers. 

Some ERP systems have built in features to track supplier performance data. Reports can also be written to gather the information you need.  By whatever means you can achieve it, getting those results could be eye opening and very meaningful to your business.

BPCS/LX Tip of the Week: Transactions

Anthony Etzel 0 47989 Article rating: No rating

If you opt to summarize transactions, do so after a period of testing so that you can be certain that all models and aliases are working to your satisfaction. When you summarize, consider ‘Summary with Detail’ because this retains the detail transactions in GLH.

Baan/LN Tip of the Week: Creating Product Variants

Kathy Barthelt 0 73621 Article rating: No rating

If you specify a configurable item on the sales order line, you can configure or link a product variant.

An item is configurable if the Configurable check box is selected in the Item - General (tcibd0101s000) session.

Manufactured items with theDefault Supply Sourceset to Assembly in the Item - General (tcibd0101s000) session and Generic items, are always configurable.

Purchased items with the Purchase Schedule in Use check box selected in the Item - General (tcibd0101s000) session, can be configurable.

Crossroads RMC, in partnership with Infor, takes Yupo to LX 8.3.4

Crossroads RMC 0 28381 Article rating: 5.0

Yupo Corporation, a leader in synthetic paper, with products that are 100% recyclable, waterproof and tree-free, went live on Infor LX 8.3.4 on April 3, 2017. Yupo partnered with Crossroads RMC for this important technology upgrade. Included in the implementation were the Finance, Supply Chain, Manufacturing and Plant Maintenance (EAM) modules.

Crossroads RMC Takes Polar to LX 8.3.4

Crossroads RMC 0 31078 Article rating: No rating

Polar Beverages, the largest independent soft drink bottler in the United States, went live on Infor LX 8.3.4 on January 16, 2017. Polar partnered with Crossroads RMC for this important technology initiative. Included in the implementation were the Finance Supply Chain and Manufacturing modules. Phase 2 will include Adirondack Beverages, a subsidiary of Polar. This project will begin in Q3 2017.

BPCS/LX Tip of the Week: Handwritten Inventory Tickets

Anthony Etzel 0 46879 Article rating: No rating

Are you still using handwritten tickets for your inventory?  This method of inventory tracking is slow and prone to human error.

Putting a simple barcode system in place speeds up the process of tracking inventory movements, reduces the likelihood of mistakes, and creates a recorded history of the who/what/where that can provide valuable insight to those who make critical business decisions for your business.

Not sure where to start? Contact us and we’d be happy to help you take the first step.

First91929394969899100Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Product Configurator - Part 2

Baan Tips

Who gets involved?
  1. Most commonly Engineering is involved in writing the rules, creating the bills and routings.
  2. Sales or Customer Service determines the questions and the order they are asked in.
  3. Sales or Customer Service determines the rules for the pricing.
  4. Sales, or Customer Service, and Engineering work together in determining the part number, description and text.

What are the steps?

  1. You must start by defining the features and options (questions and answers) and the order in which these are asked. We work this out first using sticky notes and large easel paper. Normally during the process we find that we want to move these questions around. Setting them down on paper makes the process of getting the data into Baan much more efficient. We also then have a record of what decisions were made prior to entering the data. This is normally a joint effort of Engineering and Sales. This is required and must be the first step.
  2. Constraints for features and options. These are the rules for determining what questions are asked and which options are allowed. This is generally done by Engineering or whoever is responsible for the configurator. This is required.
  3. Generic Bill of Material. All possible bill options are entered here and constraints are written to determine which options are selected based on the answers to the questions. This is generally done by Engineering or whoever is responsible for the configurator. This is a required step.
  4. Generic Routing. Similar to the bill of material, but used for generation of the routing steps. This is generally done by Engineering or whoever is responsible for the configurator. This is optional.
  5. Generic Item Data. This consists of creating custom item numbers, descriptions, text, material, size or standard fields in the custom item master. This is generally done by Engineering or whoever is responsible for the configurator though Sales may have some involvement. This is optional.
  6. Generic Pricing. This is used to calculate the selling price based on the answers to the questions. This is normally a responsibility of Sales or whoever determines the pricing. This group is also trained on writing the constraints for this section only. This is optional.

What other modules will be affected?
  1. Quotes, sales orders and projects.
  2. PRP planning for the configured items.
  3. Managing changes to the configuration. Who, what and when?
  4. Variant statistics.
  5. MPS and generic items.
Previous Article Baan/LN Tip of the Week: Product Configurator - Part 1
Next Article Baan/LN Tip of the Week: Printing Pick Lists
Print
112436 Rate this article:
3.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories