Baan/LN Tip of the Week: What Could go Wrong With GRINYA?

Kathy Barthelt 0 171794 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan/LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

It is recommended that the Integrations Setup tables be audited either through Baan or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Still have GRINYA questions you need answered?
Contact us. We’d be happy to help.

Optimize Your Manufacturing Today!
 

BPCS/LX Tip of the Week: Efficiency– The What & How

Anthony Etzel 0 50324 Article rating: No rating

Efficiency is something we all strive for in our personal lives and at work. How can manufacturers increase their efficiency? Take a hard look at the 4 key areas:

  1. Planning
  2. Bill of Material and Job Accuracy
  3. Inventory Planning
  4. Real Time Reporting / Processing 

Need help figuring out how to become more efficient in each of these areas? Contact us, we’d be happy to help.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Actual Versus Standard

Anthony Etzel 0 51351 Article rating: No rating

Job costing based on standards is great, but what if reality doesn’t match up to that?

What if jobs are really taking twice as long, and you don’t know that? What if jobs are taking ½ as long as you think, but you’re scheduling based on how much time they “should” take? Either way, you’re losing money and productivity. Getting a handle on start/stop times for jobs, and therefore the total amount of time actually spent allows you to take proper action and be more productive.

 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Project Templates

Kathy Barthelt 0 189949 Article rating: No rating

Project templates are useful because you can specify all of the information that you would normally want to include when creating a new project such as project structure, budget and so on.

In Baan IV/V, project templates do not exist, but you can set up a project template by creating a regular project, and setting the status to simulated or free. This is done so that the project does not create plans. Under this scenario, you can easily copy one project to another.

In LN, when you create a new project, a template can be used as the starting point. This is similar to copying a normal project, but unlike normal projects, no costs or revenues can be posted on a template.

Optimize Your Manufacturing Today!

 

Infor LX and Crossroads MES Selected by Blonder Tongue

Crossroads RMC 0 33054 Article rating: No rating

Blonder Tongue, a global communication equipment supplier for TV broadcasters, cable system operator, lodging video, Internet system, and institutional systems, has selected Crossroads RMC to assist them with a BPCS 6.0.04 upgrade to Infor LX. Crossroads RMC will be providing all applications and technical consulting for this project. Also included as part of the project will be the implementation of the Crossroads MES solution. Go live for both solutions is expected in January of 2018.

BPCS/LX Tip of the Week: LX 8.3.5 Facility Period Close

Anthony Etzel 0 44380 Article rating: 5.0

The Facility Period Close process was introduced in Infor LX 8.3.4 and has been enhanced in 8.3.5. This feature allows continuous or 24-hour worldwide operations in multiple facilities to submit Period End Close jobs for each facility as daily operations cease, or shifts end.

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Order Series Full – Switching to a Different Series

Kathy Barthelt 0 158322 Article rating: 5.0

In general, you can enter a different series in the order field if you have an available series.

To add a new series, find the appropriate group in the First Free Number session, and add a new series and first free number (usually 1).

In Baan IV, go to the Maintain First Free Numbers Session (under Common, Tables, Maintain Logistics Tables, Maintenance 1).
Groups are easily identified (e.g., Purchase Order, Sales Order, etc.).

In Baan V, go to the First Free Number Session (under Common Data, Tables, Logistics). There are number groups (e.g., 570 may be for Purchase Orders, 650 may be for Sales Orders, etc.).

In LN, go to the First Free Number Session (tcmcs0150m000 – it is in different places in the menu under different Feature Packs). There are number groups (e.g., 210 may be for Purchase Orders, 310 may be for Sales Orders, etc.).

BPCS/LX Tip of the Week: Revisit The Last Brilliant Idea

Anthony Etzel 0 47599 Article rating: No rating

Sometimes the best ideas have to be tabled due to competing priorities. That doesn’t mean that the idea was bad. Revisit previously suggested cost savings ideas, or ideas to make a manual process more efficient. Now could be the right time to do something great!

Optimize Your Manufacturing Today!

First8586878890929394Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Year-End Processing Checklist for Period and Fiscal Year Closure

The conclusion of the fiscal year is inevitably a hectic period, making it crucial not to overlook essential tasks within your ERP system to ensure a seamless year-end close and set the stage for a successful start to the upcoming year. Below are critical items to include in your comprehensive checklist:

Year-End Close Process:

  1. Remove discontinued items.
  2. Eliminate sold purchase receipts.
  3. Clear lot attributes for sold lots.
  4. Update standard cost based on the current cost field (for environments without Manufacturing only).

Prepare for Year-End Close:

  1. Conduct a comprehensive physical inventory and update quantities before the actual year-end or establish a robust cycle-counting program.
  2. Review and post any applicable sales and purchase invoices/returns.
  3. Prepare users for a year-end push to complete all year-to-date inventory adjustments, receipts, and invoicing.
  4. Determine procedures for handling new year transactions without immediate posting.
  5. Establish new standard costs for the upcoming year (Manufacturing).
  6. Discuss cutoff dates for removing Archived BOMs and Closed/Canceled Mfg Orders (Manufacturing).

Finance Specific Items:

  1. Set up financial periods for 2024 (fiscal, reporting, and tax, as applicable).
  2. Open January period in 2024.
  3. Finalize any outstanding transactions from the current year (2023).
  4. Perform a soft-close for any open periods in 2023.

General Baan/LN Tips:

  1. Issue any pending old sales invoices.
  2. Resolve outstanding financial integration errors.
  3. Establish new integration mapping for 2024 as needed.
  4. Test the mapping in a controlled environment before the new year.
  5. Review and update jobs to ensure they will process in 2024.
  6. Determine, for cash-flow purposes, which purchase invoices won’t be paid until 2024.
  7. Verify that calendars are set up for the new year with holidays correctly indicated.
  8. Check jobs to ensure that any with hard-coded dates will point at the new year.

For additional insights and tips on year-end processing, refer to the relevant documents in the Infor Knowledge Base.

 KB 

 Content 

 1879191  

 Document including step by step procedure, possible error/warning messages, and more (Infor LN) 

 1147023 

 Step by step procedure description (Infor LN)

 1116239 

 Step by step procedure description (Infor LN)

 1117334

 Step by step procedure description (Infor LN; Portuguese)

 1171300 

 Step by step procedure description (Baan IV) 

If you require assistance or have any questions, feel free to reach out to us, and we'll gladly guide you through the necessary steps to ensure a thorough and accurate completion of your year-end processes. Contact us at 1.800.762.2077 or via email at solutions@crossroadsrmc.com. Your success is our priority, and we're here to help.

Previous Article Infor LN & Baan Tip: When is backflushing disabled in LN?
Next Article Infor LX / BPCS & Infor LN / Baan Tip: Time for the Notorious TRIO: Manual -  Physical -  Inventory
Print
59515 Rate this article:
2.5
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories