BPCS/LX TIP OF THE WEEK: 6 POWERFUL STEPS TO WIN WITH AUTOMATION:

Anthony Etzel 0 32454 Article rating: No rating
  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice real-time data reporting to monitor efficiencies and identify problems as they occur.

Baan/LN Tip of the Week: 6 Powerful Steps to Win With Automation:

Kathy Barthelt 0 73557 Article rating: No rating
  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.  
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice real-time data reporting to monitor efficiencies and identify problems as they occur.

Duncan – Out With the Old In With the New… MES

Anthony Etzel 0 19039 Article rating: No rating
Duncan Enterprises, Inc., a leading designer, manufacturer, and distributor of ceramics, arts and crafts, fabric dying and painting products, fashion arts, and home decor DIY products, has selected Crossroads MES to implement throughout all of their shop floor departments and work centers. Through this implementation, Duncan intends to replace their existing Code Soft label software and Shop 2000 Reports. In addition, they expect to eliminate manual tracking of performance measurements and labor. With Crossroads MES, all shop floor paperwork will be distributed in a paperless fashion and all shop floor activities and production receipts will be captured. In addition, real time shop floor status information will be available for reporting across the enterprise.

Baan/LN Tip of the Week: Transaction Accounts – Commissions

Kathy Barthelt 0 76782 Article rating: No rating

In Baan IV, if a link with Financials exists for commissions and rebates, invoices are created directly in the Commission Control System (CMS) module and posted to Financials. As a result, users must specify the ledger accounts that are used for posting commissions and rebates in the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session.

In LN, the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session is removed from the Commission Control System (CMS) module, because invoices are no longer created directly in the Commission Control System module.

BPCS/LX Tip of the Week: Vendor Maintenance Security Option for Company or Program

Anthony Etzel 0 39188 Article rating: No rating

The Vendor Maintenance Security option is in the Purchasing System Parameters program(PUR820D). The purpose of this program is to provide an additional security option for VendorMaster Maintenance. To access this program, the user selects the Parameters Generation option from the System Functions menu, SYS500. The user can modify the Vendor Maintenance Security parameter from PUR820D-04 in the Purchasing System Parameters program.This feature provides an additional security parameter for Vendor Master Maintenance.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: 6 Powerful Steps to Win With Automation

Anthony Etzel 0 35438 Article rating: No rating

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.  

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: GRINYA Reconciliation – What Could Go Wrong?

Kathy Barthelt 0 78529 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan or LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

To ensure, it’s recommended that the Integrations Setup tables should be audited either through Baan/LN or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Purchase Order Receive All Processing

Anthony Etzel 0 29165 Article rating: No rating

With this enhancement, the Purchase Receipts screens are optionally shown with the quantity and weight fields populated with the open value on the purchase order.

Previously the user had tomanually enter the quantity received or, for a dynamic weight and measure items, the weightreceived for each line on the purchase order.

Now the screens are populated with the open valueand if the open value is the same as the value received, the user can simply accept the line.

Optimize Your Manufacturing Today!

First8384858688909192Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Tip of the Week: 10 Ways to Succeed at an OEE Project Where 90% Fail

  1. Collect the requirements. Learn from everyone with the intent of developing a phased approach to implementing on your shop floor with OEE being Phase 1. 
  2. Create your list. Capture all of required functions, taking into account what the “output” of the system will be. What does the plant manager need to see in real-time? What KPI’s does each line need displayed in real-time? What reports are required?
  3. Insist Upon Real-time. In the moment data for the right OEE is the right approach. If it’s possible, collect the data automatically. Remember that real-time feedback to line operators results in an automatic increase in OEE.
  4. Evaluate your lines. Focus where production counts can be monitored automatically. If the data is in your PLC’s, can you get it out? OPC communication is the right way to go here. If not, the approach is to install a new dedicated PLC with sensors installed on each line.
  5. Find Your Data Points. If automatic production monitoring is not applicable, what will be your collection points and how will you collect the data?
  6. Calculate the Load. Determine how to load the “job” you’re reporting on into the OEE system. This will typically be the order/operation or the product from the ERP.
  7. Recognize Great Data. Do not accept “manual collection of data” as a viable approach because it produces false results and is labor-intensive.
  8. Be Tough. Evaluate systems based on OEE specificity to start and expandability to future phase functions as determined by your requirements. Plan to justify the OEE purchase on its own merits.
  9. Go Easy. Make sure the system is easy to implement. Software installation and configuration should take no more than 2 weeks.
  10. Be Simple. Put together a detailed but simple project plan indicating who will do what, how long it will take, and how you will monitor progress.
Read Full Article

Optimize Your Manufacturing Today!

Previous Article Baan/LN Tip of the Week: 5 Ways to Motivate Your Employees
Next Article Tip of the Week: Gain Efficiency & Save Money - Evaluate Your Production Lines