Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC's Analytics Dashboard serves as the perfect complement to extend your MES solution

George Moroses 0 36294 Article rating: 5.0

Did you know our Analytics Dashboard serves as the perfect complement to extend your MES solution?

Need real-time information regarding what shop orders are active, which lines are down, and overall OEE? Want to display all of this data in easy to understand graphs and charts with drill-down capability?

Contact us today to find out how our Analytics Dashboard can provide all of the information you need in real-time.

  • MES Work Center Job Step Status
  • MES Work Center Machine Status
  • MES Shop Order Status
  • MES Order / Operation Status
  • MES Order / Parts Status
  • MES Badge Status

Contact George Moroses to learn more.

Infor and Crossroads RMC Partner to Drive Success at Ridewell

Anthony Etzel 0 37267 Article rating: 5.0

Earlier this year, Ridewell Corporation inked a deal with Infor to move their BPCS 4.05 CD system to Infor LX. As part of that deal, Crossroads RMC’s MES software was selected to provide shop floor automation. 

For the ERP upgrade, Infor reached out to Crossroads RMC to provide support for both Finance and Data Conversion due to our positive track record with 4.05 CD to LX migrations. Crossroads RMC has extensive migration experience and developed a methodology for converting legacy 4.05 CD GL into CEA. 

The process Crossroads RMC developed makes it cleaner, more manageable, and easy to embrace from the client perspective. Infor also engaged Crossroads RMC to provide technical support to manage the data conversion, utilizing the Infor utilities and converting Ridewell’s 4.05 CD data to standard LX.

IDF: Defining the Attributes for a New Object

Anthony Etzel 0 30931 Article rating: 5.0

Attributes are the fields you define in your System i file.

You can begin by building your attribute list in Integrator by synchronizing the object with the host. This process reads the file definition from the System i and builds your list of attributes. The synchronize process will automatically run and read the definitions for the first occurrence of this file name within the library list. You can repeat this process manually multiple times if you change the file definition on the host by using the ‘Synchronize with Host’ option. However, the synchronization process will not recognize changed field names.

Non on key field attributes: The integrator requires a unique key for each object. If the host file already has a key, the synchronization process will automatically identify fields as part of the key as well as add a sequence number to multiple key parts. If the file does not have a unique key, you must either create a keyed logical file or identify the key manually. Key fields are the default sort order for all list views for an object.

Why do you need OTTO? Let’s let our customers tell you…

George Moroses 0 26702 Article rating: 5.0

“Our priorities change daily. It’s important to manage the priorities instead of having someone here in the office constantly expediting. We don’t want to run MRP every day, that would just introduce nervousness, all plans and priorities are likely to change and the flood of recommendations would be unmanageable. We run MRP once a week and rely on OTTO to track the constantly shifting priorities day-to-day.”  
Production & Inventory Control Manager, Top U.S. Crane Manufacturer

Learn More About OTTO

Crossroads RMC is proud to announce the release of the following dashboard views that come STANDARD with the LX Analytics Dashboard

George Moroses 0 30493 Article rating: 5.0

Standard Analytics Dashboard Views: 

  • Sales Bookings (ECH)
  • Accounts Receivable (RAR)
  • Accounts Payable (APH)
  • Planned Orders (KFP)
  • Purchasing (HPH)
  • Shop Order Material (FMA)
  • Shop Order Operations (FOD)
  • CEA
  • Order Booking (ECS)
  • Labor History (FLT)
  • Sales History (SIH)
  • Material Status (IIM/ILI)

Click Here to Learn More

If you can't see everything that happens on your shop floor, you are at a competitive disadvantage

Anthony Etzel 0 31930 Article rating: 5.0

If you’re not able to see everything that happens on your shop floor in real-time, you’re at a HUGE competitive disadvantage! Your competitors are running MES. 

Crossroads MES software provides:

  • A user-friendly interface and an easy exchange of information between the shop floor users and your ERP database. 
  • Planners the ability to schedule work to a specific machine or work area. In addition, it allows for work to be re-sequenced and split for better flexibility in scheduling shop floor activities.
  • Factory workers with the ability to receive the work schedule electronically as well as interacting with it by reporting transactional activity.
  • The ability to electronically display Drawing, Process Instructions, and Quality Instructions so you can eliminate, or minimize, the need for some of the paper on the shop floor.
  • The ability to pass shop floor transactional activity to dashboard displays as well as the ERP system. 

Click here to learn more about Crossroads MES 

or Contact Anthony Etzel today to learn more.

Infor LN & Baan Tip of the Week: Job Groups in LN

Kathy Barthelt 0 85000 Article rating: 5.0

In a scenario where performing job A depends on the result of job B, it is hard to decide at what time job A must be scheduled, and how long job B runs. To handle dependent jobs, you can now create a job group. Use the Job Groups (ttaad5140m000) session to create a job group. A job group has a name, with the same characteristics as a job name, and a description. The Status and User of the job group are handled automatically.

After creating the job group, the jobs are added to the group, approximately in the order the jobs must be performed. The first job in the group (with the lowest Group Number) determines the handling of the whole job group, such as execution date and whether the job group is being repeated. If the job group is not repeating, the job group and all non-repeating jobs in the job group are deleted when the job group has run.

The dependencies of the jobs in the job group are also determined. A job in the job group can only depend on a job in the same job group with a lower job number.

You can use the specific options in the Job Groups (ttaad5140m000 andttams5640m000) sessions to change the status of the job group. The job group statuses have the same meaning as the status of the jobs and the same status changes are allowed.

Note: Job groups are only handled by the BSE service Job Scheduler Service.

A/P Payment Update in LX 8.3.4

Anthony Etzel 0 43647 Article rating: 5.0

A/P Payment Update in LX 8.3.4. ACP660B creates a file using a layout required by the bank; the file informs the bank to pay invoices. These conditions must be met to create the file:

  • FIM is an installed product in SYS821  ­
  • The user is authorized to FIM in SYS600 ­
  • The company is active in FIMCOMIT in SYS105  ­
  • The payment type is in BONPAYTP (SYS105)
First7172737476787980Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for OPERATIONS: Sales Contract Linked Documents (tdsls3506m000)

Use this session to view the documents linked to a sales contract. You can view these documents only when a sales order line or a sales schedule line is linked to a sales contract line.

Note: 

  • You can view this session only if the Contracts check box is selected in the Sales Parameters (tdsls0100s000) session.
  • You can use the Linked Document option from the References menu to view the details of a specific linked document.


Field Information

Contract: The code of the sales contract.

Description: The description of the sales contract

Line: The sequence number of the sales contract line.

Sales Office: The code of the sales office.

Description: The description of the Sales Office

Linked Document: The document type that is linked to the sales contract line.

Note: This field can be set to Sales Order Line or Sales Schedule Line only.

Linked Document Company: The company in which the document is linked to the sales contract line.

Linked Document: The code of the document that is linked to the sales contract line.

Note: 

  • The code of the sales order is defaulted from the Order Line field in Sales Order Lines (tdsls4101m000) session.
  • The code of the sales schedule is defaulted from the Schedule field in the Sales Schedule Lines (tdsls3107m000) session.

Linked Document Reference: The reference number of the linked document.

Note: 

  • The line number of the sales order line is defaulted from the Line field in the Sales Order Lines (tdsls4101m000) session.
  • The line number of the sales schedule line is defaulted from the Line field in the Sales Schedule Lines (tdsls3107m000) session.

Link Sequence: The sequence number of the linked document.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Clear Rounding Differences for Documents with Period Change (tccri7214m000)
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Audit Fields by Table (ttaud3125m000)
Print
1371 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories