Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

What do you get with IDF?

Infor Development Framework

George Moroses 0 36713 Article rating: 5.0

What do you get with IDF?

With Infor Development Framework (IDF), you can configure your view of the application data without modifying the core application and its supportability. Included with IDF are several interfaces including:

• PowerLink – A Windows-based client for end users

• Link Manager – A Windows-based environment administration client for importing environments, starting and stopping environment, and installing Fix Patches.

• Net-Link – A browser-based client (used by LX when running with SiW)

• System-Link – A XML-based interface for processing transactions from external sources.

The IDF ISO includes several components:

• All of the above interfaces

• Enterprise Integrator – for customizing IDF components and creating new business objects

• EGLi – Enterprise General Ledger 

• CRMi – Customer Relationship Management 

If you already have IDF installed for Infor LX 8.3.x, then it must be upgraded to a level that is compatible with LX 8.4. IDF PTFs and Fix Patches are required. See the Infor LX IDF 06.03.05 Installation and Upgrade Guide for details.

OTTO Q&A from the Director of Planning & Technology at Champion Industries

George Moroses 0 34369 Article rating: 5.0

1.  How difficult is it to initially install OTTO?

Dead easy is the straight answer. We relied on you to install, and you installed in the predicted 1 hour.  

2.  Would you install it on a test system or on the production system?

Production system is another easy answer. I use OTTO as the ideal prototype when talking to business contacts about “add-on” products. It is non-invasive; it only reads data from our ERP files. I know the implementation is 100% safe because no ERP files are ever updated (read corrupted) by OTTO.

3.  How difficult was it to implement OTTO? Was there a negative impact on daily operations?

There is a learning curve involved in using any new tool that has value to add. OTTO implementation is very low on the impact scale, but I would strongly recommend that a prospective client plan on investing in education and practice. OTTO implementation is low impact. No valuable tool is “no impact”.

Click here to learn more about OTTO

Is the Crossroads Analytics Dashboard Product Better than Spreadsheets?

Crossroads RMC 0 37355 Article rating: 5.0

You bet it is!

The Analytics Dashboard allows you to take your data and configure it any way you’d like, all without touching your ERP system! 

Any number of reports can be generated with just a few mouse clicks. In addition, full color graphs are automatically generated to illustrate the data being presented. Paper reports and Excel spreadsheets are dated. With Analytics Dashboard, data is refreshed at the touch of a button. 

Analytics Dashboard for Infor LN & Baan >
Analytics Dashboard for Infor LN, BPCS, & M3 >

MES News: Current trends indicate plants and factories are seeking to improve...

George Moroses 0 39166 Article rating: 5.0

Current trends indicate plants and factories are seeking to improve internal flexibility, implement a common information platform, and deliver real-time information. MES supports a variety of lean concepts on the plant floor, including kanban, waste reduction, load balancing, etc.  It maximizes your existing investment in your ERP system while embracing lean initiatives.  Visit our Crossroads MES page to learn more.

Infor LX & BPCS Tip of the Week: Purge optional during Month/Period End - LX 8.4

George Moroses 0 68999 Article rating: 5.0

For various month/period end programs, the purge function is now optional.

Scope:

INV903, Inventory Month End Close, optionally purges both inventory records as well as customer invoices. Some applications already have a flag or option for purging (for example, ACP900) and other applications are stand-alone. If you do not want to purge, do not run these programs: Order Purge and Close, ORD900, Close Quotes, ORD930, and Delete RMAs, ORD935. Now there are options on whether to purge records during the month end or period end programs.

The Benefits include:

• Flag or option added to allow the user to decide whether to perform month-end function with or without purge.

• Allows for month-end processing without purge.

• Improves efficiency of month-end processing.

Impact:

This enhancement includes these programs or areas:

• INV903, Inventory Month End Close

• ACR900, A/R Period Close

• CST900, PRF900, SFC900 Shop Order Close

• PUR900, Purchasing Month End Close

Johnson Crushers Selects Crossroads RMC for LN 10.6 Data Collection

Kathy Barthelt 0 40102 Article rating: 5.0

Johnson Crushers International (JCI), a global leader in engineering and manufacturing full lines of cone crushers, horizontal and incline vibrating screens and track-mounted, portable and stationary crushing and screening plants, has selected Crossroads RMC’s Data Collection solution for their Infor LN 10.6 implementation. 

JCI’s main objectives with this project are to support their continued growth and enable a continuous improvement effort to drive additional value to the business. In phase 1 of this project, JCI will implement Crossroad RMC’s Labor Reporting and Maintain Receipts data collection applications. Go live is expected to occur in early Q1 of 2020.

Factors to considered when undertaking an ERP implementation or upgrade

Kathy Barthelt 0 40693 Article rating: 5.0

Things to consider when choosing your ERP Implementation Partner:

ERP Partner Value Add:

  • Proven track record
  • References
  • Focused on-time / on budget
  • Strategic partnership with Infor
  • Knowledge of extension products that are available for your ERP
  • Post-implementation – What does the partner bring to the table once the project is complete?

Project Management

  • Does your assigned project manager fit your needs?
  • Past project management experience with the same ERP
  • Project Management methodology
  • Project Plan development and style
  • Does the PM develop a realistic plan with clear objectives, timeline, and responsibilities?

 
Consulting Team Selection​

Need help figuring out if your organization is properly positioned for an implementation or upgrade? Contact Kathy Barthelt today. We can help to ensure that your organization is positioned for success.

  • Does my ERP Implementation partner have the team to support my project?
  • Resume review
  • Interview all candidates
  • Working knowledge of ERP system/version
  • Communication skills
  • Geographic location
    • Relative industry experience
    • Technical Viewpoint
    • Understanding of any enhancements made to your system and what the best approach to streamlining for future releases. Knowing the tools available to accomplish this task.
First7172737476787980Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

[EasyDNNnews:IfExists:Event]
[EasyDNNnews:IfExists:EventRegistration][EasyDNNnews:EventRegistration:RegisterButton][EasyDNNnews:EndIf:EventRegistration] [EasyDNNnews:IfExists:Payment][EasyDNNnews:Price][EasyDNNnews:EndIf:Payment] [EasyDNNnewsLocalizedText:Eventdate]: [EasyDNNnews:EventDate] [EasyDNNnewsLocalizedText:ExportEvent] [EasyDNNnews:IfExists:EventLocation]

[EasyDNNnewsLocalizedText:EventLocation]: [EasyDNNnews:EventLocation]

[EasyDNNnews:EndIf:EventLocation] [EasyDNNnews:IfExists:EventRegistration]
  • [EasyDNNnewsLocalizedText:NumberOfAttendants]: [EasyDNNnews:EventRegistration:NumberOfAttendants]
  • [EasyDNNnewsLocalizedText:MaxNumberOfTickets]: [EasyDNNnews:EventRegistration:MaxNumberOfTickets]
  • [EasyDNNnewsLocalizedText:NotUsedTickets]: [EasyDNNnews:EventRegistration:NotUsedTickets]
  • [EasyDNNnews:IfExists:Payment]
  • [EasyDNNnewsLocalizedText:Price]: [EasyDNNnews:Price]
  • [EasyDNNnews:EndIf:Payment]
[EasyDNNnews:EventRegistration:InfoMessage] [EasyDNNnews:EndIf:EventRegistration] [EasyDNNnews:IfExists:EventSignUp]

[EasyDNNnewsLocalizedText:AreYouGoing]

[EasyDNNnews:SignUpActionBar]
[EasyDNNnews:EndIf:EventSignUp]
[EasyDNNnews:EndIf:Event]
Kathy Barthelt
/ [EasyDNNnewsLocalizedText:Categories]: [EasyDNNnews:Categories]

Infor LN & Baan Materials Tips: Serialized and Lot Controlled Items

Serial and Lot are additional characteristics/properties of Items that can be used to uniquely or collectively identify and track the item along with its Item code. Any Item can be made as Serialized and/or Lot controlled by choosing options "Serialized" and "Lot Controlled" in Items-General session under traceability section on the Details tab.

Further in Items-Warehousing data under the Identification tab, you can enable "Lot Tracking", "Lot in Inventory", "Serial Tracking" and "Serial in Inventory" which enables tracking of the Items. You can also define if the Item is "Serial/Lot not in inventory" then where you want to record the serial and lot details in the transactions like "Direct Delivery", "Receipt", "Transfer", "Register during As-Built, Service and Maintenance".

Below are some topics related to Serialized and Lot Controlled Items that will be useful:

Convert non-Serialized Item to Serialized and non-Lot Controlled item to Lot Controlled and Vice Versa

If Item is created as non-Serialized and/or non-Lot controlled... To change them to Serialized or Lot Controlled, here are some standard Sessions that can be used:

1.Convert (to) Serialized Item (whltc5201m000) can also be accessed from Item-Serials and Warehouses session's Specific Menu.

Note: Once Item is marked or converted as Serialized, it is not possible to revert the item to non-Serialized Items using this session. If any Item has to be converted to non-Serialized, then some Knowledge articles are available to show workaround steps.

2. Convert (to) Lot Item (whltc1202m000) can also be accessed from Item-Lot session's Specific Menu.


Related KB Articles:

2121795 - Item non-Serialized (Not Serial In Inventory) to Serialized (Serial In Inventory) Conversion.
692338 - Is it possible to convert a Serialized Controlled Item into a Not Serialized Controlled Item?
2057953 - Unable to convert a Lot Item to Serialized Item.
723772 - Blocking Message when Trying to Change a Non-Serialized Item to a Serialized Item.
1960873 - Register Serial Issue During As-Built Automatically Set after Converting to Serialized Item.
1134182 - Convert Item to Lot Controlled.
2084394 - Not able to convert Not Lot Controlled Item to Lot in Inventory.
1634725 - Procedure to covert (to) Lot Item (WHLTC1202M000) without using mask.
1009296 - Convert to LOT Item triggered multiple lot numbers. What is the logic behind?
1968968 - Lot Price Not Set after Conversion from Not Lot Controlled to Lot Controlled.
1852794 - Change Lot Type of an Existing Lot.
1634723 - How to enable "Lot" field in the session "Convert (to) Lot Item (whltc1202m000)".

Previous Article Infor LN & Baan Tip: Can You Backflush An Item If Estimated Quantity is Zero?
Next Article Infor LN & Baan Tip: Latest Porting Set – All Versions of Infor LN & Baan
Print
80449 Rate this article:
4.3
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories