Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LN & Baan Tip of the Week: Job Shop Bill of Material – 10.7

Kathy Barthelt 0 79571 Article rating: 5.0

The job shop bill of material is defined by site. It is used as the source for the estimated materials in the job shop production order.

The new job shop bill of material differs from the old bill of material. These changes are applicable for the new job shop bill of material:

  • It has a header and a status.
  • It is always revision controlled.
  • It can be designated for planning and for costing.
  • The effective dates have been moved from the material lines to the header.
  • The BOM quantity has been moved from item production data to the header.
  • The use up has been moved from alternatives to the material line.
  • The warehouse is defined on the material line (mandatory).
  • The routing operation is defined on the material line (optional).

The job shop bill of material can be generated through the production bill of material.

IDF News: default order class for the warehouse customer

George Moroses 0 30622 Article rating: 5.0

In IDF Customers, the default order class for the warehouse customer should be a user-defined order class (base order class = 004). Do not use base order class 002 or 005, to allow for automatic invoicing of warehouse orders (if a separate manual Ship Confirm event is required per the order class, auto invoicing cannot occur from Pick Confirm).

Can you afford not to invest in MES?

Anthony Etzel 0 33856 Article rating: 5.0

Given the environment today with growing global competition in terms of innovation, cost and time to market (given by short product cycles) as well as with increasing regulatory demands, the answer to the question “Can you afford not to invest in MES?” is turning into a clear “NO”. 

Click here to read the full Critical Manufacturing article.

Crossroads MES is Infor’s global solution for manufacturing execution and is perfectly suited to fill the gap between your manufacturing initiatives and your ERP system.

Crossroads RMC proudly announces the LX 8.3.5 go live for Trinity Industries.

Anthony Etzel 0 40673 Article rating: 5.0

Trinity Industries is live on LX 8.3.5! This project was truly a team effort working in partnership with HCL America. Crossroads RMC's involvement included John Kasper (Finance), David Campbell and Nick Olson (Operations), Jacob Hale (Supply Chain Management), and Tony Curtis (LX Administration). 

Trinity began providing industrial products and services to customers more than 85 years ago. They started as a small butane-tank manufacturer and evolved over time into a premier diversified industrial company with market-leading businesses serving the energy, chemical, agriculture, transportation, and construction sectors.

Infor LX & BPCS Tip of the Week: Pre-Assigned Lot Numbers – LX

Anthony Etzel 0 59677 Article rating: 5.0

In addition to assigning lot numbers in Shop Order Entry/Maintenance (SFC500) after the shop orders have been released, users can now pre-assign lot numbers during the Multi-level Shop Order Release process (SFC530) and the Multi-Level Backflush process (LMP600) for sub-assemblies that are lot controlled items. The user has the choice of using the parent lot ID, the next sequential generated lot ID, or not pre-assigning lot IDs. Multiple items per lot must be installed to use the parent lot number option.

Infor's Support Schedule for Infor LN & Baan

How Crossroads RMC can help

Kathy Barthelt 0 78521 Article rating: 5.0

Infor recently announced their support schedule for all versions of Infor LN & Baan.

Not sure what your company’s strategy should be moving forward?

Let us help you figure out the best path forward for YOUR company. Our goal is to put you on a path that ensures that you are supported and that your needs are met today and in the future without breaking the bank. Visit our Services page to learn more>

First6970717274767778Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for OPERATIONS: What is Statistical Inventory Control (SIC) and How Does It Work?

Statistical Inventory Control (SIC) is an inventory-controlled order system designed to maintain stock levels based on predefined thresholds, rather than being demand-driven like EP (Enterprise Planning). Since SIC relies on inventory levels, it may lead to higher stock levels. To minimize financial risks, SIC is best suited for:

  • Low-cost items.
  • Items with predictable demand or short lead times.


Applications of SIC

  • Low-Cost Items: Particularly effective for inexpensive goods.
  • Predictable Demand or Short Lead Time: Suitable when demand patterns are stable or lead times are minimal.
  • Warehouse-Specific Planning: Useful for planning by warehouse rather than across the supply chain.
  • Trading Industries: Commonly employed in sectors like supermarkets.
  • Immediate Demands: Effective for items required immediately by customers.
  • Ease of Use: Simple to implement and manage.


Limitations of SIC

  • Does not account for dependent demand from planned orders (e.g., MPS/MRP/INV).
  • Does not generate distribution orders.
  • Ignores time-phased planned orders.
  • Lacks forecast consumption techniques.
  • Uses both nettable and non-nettable warehouses.

How SIC Works

SIC operates based on the Reorder Point, Stock Levels, and Order Method.

Triggering SIC

When Economic Stocks (calculated as On-Hand Inventory + On-Order – Allocated Stocks) on the Horizon Date fall below the Reorder Point, SIC triggers the creation of:

  • Planned Purchase Advice.
  • Planned Production Advice.


Order Methods in SIC

The quantity for these advices is determined by the Order Method, which can be one of the following:

  • Replenish to Maximum Stock
  • Fixed Order Quantity
  • Economic Order Quantity (EOQ)
  • Lot-for-Lot

Example: SIC in a Supermarket

Scenario: Managing stock for Ice Cream (1 Kg Pack)

  • Current Stock: 10 PCs
  • Reorder Point: 5 PCs
  • Safety Stock: 2 PCs
  • Lead Time: 1 Day
  • Order Method: Replenish to Maximum (Maximum Stock: 20 PCs)
  • Maximum Anticipated Consumption: 3 PCs/Day

Process:

  1. Customer purchases reduce the stock.
  2. When stock reaches 5 PCs, SIC is triggered.
  3. A Purchase Advice is generated for 15 PCs to replenish stock to the maximum level (20 PCs).
  4. During the lead time (1 day), the remaining 3 PCs (excluding Safety Stock) meet customer demands.
  5. In emergencies, Safety Stock can also be utilized.

Statistical Inventory Control offers a practical approach for managing inventory levels, particularly in industries with predictable demand or fast-moving items. However, its limitations make it less ideal for complex or time-phased planning scenarios.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Use of Electronic Bank Statements
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Archiving Data from tipcs300 and ticst300 Tables
Print
58678 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories