Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor will no longer support LX or BPCS on IBM i 7.2 after April 30, 2021

George Moroses 0 50846 Article rating: 5.0

On September 10, 2019, IBM® announced the end of support of IBM i 7.2 effective April 30, 2021. In line with IBM’s support policy, Infor will no longer support LX, BPCS, SSAEAM, PRMS, BOSS and related products on IBM i 7.2 after April 30, 2021.

All releases, patches, and solutions are expected to be delivered and compiled for IBM i 7.3 effective May 1, 2021. These deliverables should install and function on version 7 release 3 (IBM i 7.3) and above. This will require that your operating system be at a minimum release level of IBM i 7.3.

This policy extends to other Infor LX related technologies including WebTop, System i Workspace (SIW), and Infor Development Framework (IDF).

If you have not done so already, we recommend you start planning and completing your upgrade to IBM i 7.3 or above prior to April 30, 2021. After this date, if you register a support call with Infor Support, and your application still runs on IBM i 7.2, you may be requested to upgrade to a supported version of the IBM i operating system.

In addition, we invite you to log on to Infor Concierge to view and download important information regarding Infor LX, BPCS, and Infor SSAEAM. General KB Articles have been created to proactively provide you with information regarding this Announcement (1397381) and the Infor BPCS/LX Product Lifecycle Policy (1947086).

Infor LX & BPCS Tip of the Week: Journal Upload – EGLi

George Moroses 0 53414 Article rating: 5.0

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

Infor LN & Baan Tip: Open Transactions Check – LN 10.7

Kathy Barthelt 0 96142 Article rating: 5.0

When closing a project, users were informed about open transactions blocking the closure process. To proactively check on open transactions, the Show Open Transactions option has been introduced in the Project Status (tppdm6107s000) session. With this option, issues can be resolved before changing the status.

Infor LX & BPCS Tip of the Week: LX 8.4 Enhancement – Company Security for ACR510

George Moroses 0 18322 Article rating: 5.0

This enhancement provides LX Company Security to Invoice Maintenance, ACR510. Only users authorized to the invoice company can view or maintain invoices.

User must be authorized to ACR as a product or ACR510 as an individual program in Security Master Maintenance, SYS600. Additionally, ACR510-01, displays all records, but if the user tries to revise or display a transaction record for a company the user is not authorized to, this error message is displayed: “User is not authorized to the transaction company.”

Infor LX & BPCS Tip of the Week: Item Deletion Option in IDF Enterprise Items

George Moroses 0 22490 Article rating: 5.0

Previously, users were unable to delete items in IDF Enterprise Items when they have inventory balances or the item is connected to ancillary records, such as sales history records. This feature added in LX 8.4 provides the ability to delete an item when sales history records are found but all sales history activity is zero.

When the user attempts to delete an item in IDF Enterprise Items that is tied to a sales history record, the panel displays a message that the item cannot be deleted. The user can then run the Delete Validation Report to determine which records are tied to this item that prevents the validation. If the item no longer has manufacturing activity but had old sales history, the item can be deleted.

First5657585961636465Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for OPERATIONS: Copy Customized Product Structure to Standard Structure (tipcs2232m000)

This functionality allows you to copy the product structure of a customized item to a standard item.

Note: When a customized structure is copied to a standard structure, the Customized check box in the Items session (tcibd0501m000) is cleared.

Item Types:

  • Standard Items: Identified by a regular item code.

  • Segmented Items: Consist of a project code segment and an item base segment (i.e., the customized item’s item code). Segments are defined in the Item Code Segmentation session (tcibd0500m000).

Only components valid for the specified Effectivity Unit will be copied.

Copy Options:

  • Target Routing Code
    Enter the code of the standard routing to which the customized structure should be copied.

  • Copy Product Structure
    Choose whether to:

    • Copy the entire structure

    • Copy only the first level

    • Perform the copy interactively

  • Reference Date
    Only parts of the product structure valid on this date will be copied.

  • Copy E-Item Relationships
    If selected, related E-item records will be copied.

  • Copy All Components and Effectivity Statements
    If selected, unit effectivity is copied to the standard structure. You can specify the unit.
    Exceptions related to routings and operations (that meet date effectivity) are also copied.

  • Alternative Material
    If selected, alternative BOM components are included in the copy.

  • Use-Up Material
    If selected, use-up materials from BOM components are included.

  • New Item Codes for Existing Standard Components
    If selected, LN generates new item codes for existing standard components in the structure.

  • Approve Conversion Factors

    • Selected: LN copies and approves conversion factors for the target item.

    • Cleared: LN copies the factors, but approval must be done manually in the Conversion Factors session (tcibd0103m000).

  • Copy to Standard Item Configuration
    If selected, the customized or generic item product structure is copied to the specified standard item configuration.

​Important Note: This option is only enabled if the Use Standard Item for Configuration check box is selected in the Product Configuration Parameters session (tipcf0100m000).Copying is only possible if the product variant is not active in Order Management. Active supply orders linked to the product structure will lose association with sales orders/quotations when the structure is regenerated.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Rebuild History for Account Matching (tfgld1218m000)
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Authorization and Security - LN REST APIs
Print
5847 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories