Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

Kathy Barthelt 0 100884 Article rating: 5.0

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)

George Moroses 0 49798 Article rating: 5.0

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT

Welcome to Our New Website - Please Take a Look Around!

Crossroads RMC 0 43043 Article rating: 5.0

We proudly announce the launch of Crossroads RMC’s brand new website!

We have been fortunate to serve customers for over 30 years and over that time, we have developed software solutions and consulting expertise to become your Go-To Experts for Infor LN / Baan, and Infor LX / BPCS and M3. 

Our website design focuses on our products and services simply and succinctly, while accentuating the reasons why working with Crossroads RMC has been the right choice for so many manufacturers and distributors worldwide. 

So come on in and take a look around! We hope you enjoy the new site and explore all of the information it has to offer.

If you think our new website is COOL, please leave a comment!If you think our new website is COOL, please leave a comment! 

Keep up-to-date with our latest announcements, industry news, and Infor ERP tips here on Crossroads Connections, Subscribe to our bi-monthly Newsletter and follow us on Facebook, LinkedInTwitter and YouTube.

Infor will no longer support LX or BPCS on IBM i 7.2 after April 30, 2021

George Moroses 0 50133 Article rating: 5.0

On September 10, 2019, IBM® announced the end of support of IBM i 7.2 effective April 30, 2021. In line with IBM’s support policy, Infor will no longer support LX, BPCS, SSAEAM, PRMS, BOSS and related products on IBM i 7.2 after April 30, 2021.

All releases, patches, and solutions are expected to be delivered and compiled for IBM i 7.3 effective May 1, 2021. These deliverables should install and function on version 7 release 3 (IBM i 7.3) and above. This will require that your operating system be at a minimum release level of IBM i 7.3.

This policy extends to other Infor LX related technologies including WebTop, System i Workspace (SIW), and Infor Development Framework (IDF).

If you have not done so already, we recommend you start planning and completing your upgrade to IBM i 7.3 or above prior to April 30, 2021. After this date, if you register a support call with Infor Support, and your application still runs on IBM i 7.2, you may be requested to upgrade to a supported version of the IBM i operating system.

In addition, we invite you to log on to Infor Concierge to view and download important information regarding Infor LX, BPCS, and Infor SSAEAM. General KB Articles have been created to proactively provide you with information regarding this Announcement (1397381) and the Infor BPCS/LX Product Lifecycle Policy (1947086).

Infor LX & BPCS Tip of the Week: Journal Upload – EGLi

George Moroses 0 52461 Article rating: 5.0

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

Infor LN & Baan Tip: Open Transactions Check – LN 10.7

Kathy Barthelt 0 56995 Article rating: 5.0

When closing a project, users were informed about open transactions blocking the closure process. To proactively check on open transactions, the Show Open Transactions option has been introduced in the Project Status (tppdm6107s000) session. With this option, issues can be resolved before changing the status.

First5051525355575859Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE: Use of Electronic Bank Statements

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

  1. Convert Electronic Bank Statements (tfcmg5202m000)
    Convert the received bank file to a format that LN can process. LN stores the converted bank statement files in the directory specified in the Path For EBS Archive field of the Bank Relations (tfcmg0510m000) session. In the Pathname EBS File field, you must add the file name. To add the current date to the file name, append a tilde (~) to the file name.

  2. Validate Bank Statements (tfcmg5202m000 / tfcmg5510m000 / tfcmg5511m000)
    Validate the converted electronic bank statement.

  3. Match Bank Statements (tfcmg5210m000)
    Automatically match as many of the imported statements (status Validated) as possible with open items. LN can match the statements with sales invoices, purchase invoices, and anticipated payment documents.

    Matching Options:

    • Match - Surplus on Aging / Unallocated (Default value)
    • Match - Surplus on Unallocated
    • Match - Surplus to be allocated Manually
    • Allow Underpayments
    • Use Payment Difference Tolerance
       
  4. Matching Results (tfcmg2500m100)
    Review the results of the matching process.

    To handle an unmatched amount, you can:

    • Manually add an unallocated payment or receipt line.
    • Reconcile the surplus with remaining open entries of the business partner.
       
  5. Post Bank Statements (tfcmg5210m100)
    Post the bank transactions to the General Ledger.

    Update the business partner’s bank account number and other details in the Bank Account by Pay-by Business Partner (tccom4115s000) session, based on the details read from the bank statement file.

OPERATIONS: What is Statistical Inventory Control (SIC) and How Does It Work?

Statistical Inventory Control (SIC) is an inventory-controlled order system designed to maintain stock levels based on predefined thresholds, rather than being demand-driven like EP (Enterprise Planning). Since SIC relies on inventory levels, it may lead to higher stock levels. To minimize financial risks, SIC is best suited for:

  • Low-cost items.
  • Items with predictable demand or short lead times.


Applications of SIC

  • Low-Cost Items: Particularly effective for inexpensive goods.
  • Predictable Demand or Short Lead Time: Suitable when demand patterns are stable or lead times are minimal.
  • Warehouse-Specific Planning: Useful for planning by warehouse rather than across the supply chain.
  • Trading Industries: Commonly employed in sectors like supermarkets.
  • Immediate Demands: Effective for items required immediately by customers.
  • Ease of Use: Simple to implement and manage.


Limitations of SIC

  • Does not account for dependent demand from planned orders (e.g., MPS/MRP/INV).
  • Does not generate distribution orders.
  • Ignores time-phased planned orders.
  • Lacks forecast consumption techniques.
  • Uses both nettable and non-nettable warehouses.

How SIC Works

SIC operates based on the Reorder PointStock Levels, and Order Method.

Triggering SIC

When Economic Stocks (calculated as On-Hand Inventory + On-Order – Allocated Stocks) on the Horizon Date fall below the Reorder Point, SIC triggers the creation of:

  • Planned Purchase Advice.
  • Planned Production Advice.


Order Methods in SIC

The quantity for these advices is determined by the Order Method, which can be one of the following:

  • Replenish to Maximum Stock
  • Fixed Order Quantity
  • Economic Order Quantity (EOQ)
  • Lot-for-Lot

Example: SIC in a Supermarket

Scenario: Managing stock for Ice Cream (1 Kg Pack)

  • Current Stock: 10 PCs
  • Reorder Point: 5 PCs
  • Safety Stock: 2 PCs
  • Lead Time: 1 Day
  • Order Method: Replenish to Maximum (Maximum Stock: 20 PCs)
  • Maximum Anticipated Consumption: 3 PCs/Day

Process:

  1. Customer purchases reduce the stock.
  2. When stock reaches 5 PCs, SIC is triggered.
  3. A Purchase Advice is generated for 15 PCs to replenish stock to the maximum level (20 PCs).
  4. During the lead time (1 day), the remaining 3 PCs (excluding Safety Stock) meet customer demands.
  5. In emergencies, Safety Stock can also be utilized.

Statistical Inventory Control offers a practical approach for managing inventory levels, particularly in industries with predictable demand or fast-moving items. However, its limitations make it less ideal for complex or time-phased planning scenarios.

TECHNOLOGY: Archiving Data from tipcs300 and ticst300 Tables

1. Archiving tipcs300

  • Using Session tipcs2260m000:
    • When archiving PCS projects, selecting the "Archive Financial data" option ensures that:
      • Records in tipcs300 are archived to the archiving company.
      • Records are deleted from the original company.
    • If records remain in tipcs300:
      • They may belong to projects that have not been archived.
      • The project may have been archived without selecting "Archive Financial data."
    • Verify there are no errors during the archiving process.
  • Using Session tipcs3500m001:
    • The session "Delete Financial Transactions by Project" can delete records from tipcs300.
    • Note: This session is not for archiving; it removes records without copying them to the archiving company.

2. Archiving ticst300

  • Using Session ticst0250m000:
    • The session "Archive Production Orders" allows:
      • Archiving and deleting records from the original company.
      • Only deleting records from the original company.
    • When executed:
      • Records in ticst300 associated with archived orders are removed.
      • Remaining records belong to unarchived orders.

Previous Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Archiving Data from tipcs300 and ticst300 Tables
Next Article Infor LN & Baan Tips & Tricks: Action Required - Infor LN Cloud Edition - Fonts Update!
Print
58667 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories