BPCS/LX Tip of the Day: Cycle Counting Part 2

Anthony Etzel 0 78101 Article rating: No rating

Understanding: The Cycle Count Alternative

The best way to cycle count is to count the same number of items each day and at the same time each day. The goal is to count your “A” items 4 times a year. The “A” items should be those item that are about 80% of the total inventory value and 20% of the total items. Consider creating your own cycle count schedule then instead of using the cycle count transaction, use the inventory adjustment transaction. The item balance is changed at the time the transaction is keyed. The transaction list can be used for the reconciliation process.

Baan/LN Tip of the Day: Company Calendar

Kathy Barthelt 0 109968 Article rating: 5.0

Baan uses the company calendar in the following modules to determine the start and end dates for planned orders:

  • Master Production Scheduling
  • Material Requirements Planning
  • Capacity Requirements Planning
    (All three combined in a single planning module for Baan V and LN)
  • Shop Floor Control

The calendar provides the valid working days, number of shifts per day and the number of hours in a day.

Baan allows for a single calendar for the whole company or for a calendar for each work center.

BPCS/LX Tip of the Week: Cycle Counting Part 1

Anthony Etzel 0 84914 Article rating: No rating

Understanding: The Cycle Count Transaction

If you rely on BPCS to provide you with a cycle count list, the number of items could vary from day to day from a few items to count, to several. So the person doing the cycle counting may spend a few minutes to a few hours counting items. After the cycle count is complete, the balances are not changed until the reconciliation is complete. This process could take some time before the balances are changed.

The cycle count transaction process is similar to the physical inventory transaction process.

Baan/LN Tip of the Week: GRINYA

Kathy Barthelt 0 149588 Article rating: 3.0
GRINYA is one of the more complex issues in ERP Finance. GRINYA is the tracking via ledger account of the value of items received on a purchase order that have not been matched to a supplier invoice.

Baan solutions for Baan IV and V were incomplete. To take full advantage of the current GRINYA reconciliation process, check Infor solution #107147, which contains the GRINYA user manual and a link to download the software for your version of Baan. For ERP LN, look at Document Code U8942C US.

It is called User Guide for Reconciliation and Analysis. If you are not running the latest GRINYA solutions, patching will require a good amount of time in filling the Interim tables this solution runs from. Infor has posted several procedural write ups, so check the Support Site and read up before tackling this for the first time.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 84492 Article rating: No rating
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

BPCS/LX Tip of the Week: The Item Master Requirements Code

Anthony Etzel 0 80304 Article rating: No rating

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

First126127128129131133134135Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for OPERATIONS: Copy Customized Product Structure to Standard Structure (tipcs2232m000)

This functionality allows you to copy the product structure of a customized item to a standard item.

Note: When a customized structure is copied to a standard structure, the Customized check box in the Items session (tcibd0501m000) is cleared.

Item Types:

  • Standard Items: Identified by a regular item code.

  • Segmented Items: Consist of a project code segment and an item base segment (i.e., the customized item’s item code). Segments are defined in the Item Code Segmentation session (tcibd0500m000).

Only components valid for the specified Effectivity Unit will be copied.

Copy Options:

  • Target Routing Code
    Enter the code of the standard routing to which the customized structure should be copied.

  • Copy Product Structure
    Choose whether to:

    • Copy the entire structure

    • Copy only the first level

    • Perform the copy interactively

  • Reference Date
    Only parts of the product structure valid on this date will be copied.

  • Copy E-Item Relationships
    If selected, related E-item records will be copied.

  • Copy All Components and Effectivity Statements
    If selected, unit effectivity is copied to the standard structure. You can specify the unit.
    Exceptions related to routings and operations (that meet date effectivity) are also copied.

  • Alternative Material
    If selected, alternative BOM components are included in the copy.

  • Use-Up Material
    If selected, use-up materials from BOM components are included.

  • New Item Codes for Existing Standard Components
    If selected, LN generates new item codes for existing standard components in the structure.

  • Approve Conversion Factors

    • Selected: LN copies and approves conversion factors for the target item.

    • Cleared: LN copies the factors, but approval must be done manually in the Conversion Factors session (tcibd0103m000).

  • Copy to Standard Item Configuration
    If selected, the customized or generic item product structure is copied to the specified standard item configuration.

​Important Note: This option is only enabled if the Use Standard Item for Configuration check box is selected in the Product Configuration Parameters session (tipcf0100m000).Copying is only possible if the product variant is not active in Order Management. Active supply orders linked to the product structure will lose association with sales orders/quotations when the structure is regenerated.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Rebuild History for Account Matching (tfgld1218m000)
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Authorization and Security - LN REST APIs
Print
5715 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories