BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 73249 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 80245 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 32041 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 67938 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 102054 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 96880 Article rating: No rating

In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

 

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

BPCS/LX Tip of the Week: Product Routing

Anthony Etzel 0 70719 Article rating: No rating

Defining the Product Routing first requires the items to be setup in the Item Master file. Other master files also need to be defined prior to creating the routing.
These include:

  • The Facility defined with a SYS program
  • The Warehouses defined with an INV program
  • Locations defined with an INV program
  • The Machines (required if using capacity planning or an MES interface) defined with an MDM program

After the above data is set up, the Department file and Work Center files can be setup in MDM. Now you are ready to define a product route.

First120121122123125127128129Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Infor LX & BPCS: Why You Need MES

You know your plant better than anyone, and most likely you'd admit that there is room for improvement. Perhaps too many defects are causing costly issues down the road, or maybe your production is behind and orders are shipping late? Do you know what needs to be improved? Do you know about the root causes of the problems that you’re experiencing? Is it fair to say, you don’t know what you don’t know … yet?

MES helps you dig into the problem and better yet, SOLVES the problem!

What Is MES and How Does It Work?

Many companies still enter data manually or share work instructions on paper. Most of them, however, know there’s a better way to organize the mass of activity happening on the plant floor. MES provides visibility to that activity as well as the underlying data and uses that data to improve how that activity is done and makes it repeatable. MES connects multiple sites, integrates with equipment, and raises the effectiveness of business applications all to better optimize operations.

The 3 Pillars of MES:

  1. Establishing a plan and staying on schedule. The system takes your input — production shifts/times, production goals, etc. — and calculates the rate at which you need to complete production in order to meet customer demand. Operators see real-time progress on dashboard graphics, knowing the progress at every moment.
  2. Enforcing a repeatable process. Knowing your process is being followed exactly as defined provides the ultimate peace of mind. Every target, from fastening to product routing, is achieved just as you defined it time after time.
  3. Creating a rich data set. Capturing data is one thing; being able to act on that data is really the key to driving improvement initiatives. Use your analytics, explore your data set, and identify and solve your hidden inefficiencies.

All three of these MES pillars are used to help you reach productivity and quality goals by:

  • Solving production scheduling challenges
  • Discovering and sharing your best operators’ insights
  • Uncovering inefficiencies in your process and fixing them
  • Reducing the exhausting task of putting out fires
  • Establishing a continuous improvement philosophy
  • Increasing operator engagement and dedication

And if you need another reason... according to Forbes.com, MES ranks in the Top 5 Key Areas to Affect How Goods Are Made in 2023 - Five Predictions For Manufacturing And Logistics In 2023.
https://www.forbes.com/sites/forbestechcouncil/2023/02/13/five-predictions-for-manufacturing-and-logistics-in-2023/?sh=1155863f1f76

So, what's next? Work with Crossroads RMC, an experienced MES partner who has seen situations just like yours and who has guided companies in your position. And best of all, Crossroads RMC doesn’t just know MES, we have a team of experts who are knowledgeable about manufacturing best practices, your Infor ERP, and MES and can bring all of that knowledge together to help you formulate the right plan for your company’s success.

Contact Anthony Etzel at Crossroads RMC today. He can provide you with a free MES ROI calculator to give you some concrete numbers to help you see what MES can do for your business. 800.762.2077

Print
28290 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

x