BPCS/LX Tip of the Week: Understanding What Goes On – Out on the Factory Floor

Anthony Etzel 0 346 Article rating: No rating

Ok… so you want to know the status of a specific shop order that was released two days ago.

What do you do?

It’s a sure bet that you have a manager, supervisor, or planner who can walk the floor and find the order at whatever work center it happens to be at. He/she can then answer “what operations have been completed and how many were completed?” All this requires leg work, and of course, a fair amount of time.

Now, if you have setup your BPCS master files properly, and you report transaction activity, you should be able to get those shop order statuses much faster using the SFC300 Shop Order Inquiry Screen.

At your fingertips you can see:

  • Release date & due date
  • How many hours remain in total and at each operation
  • The quantity required, what was finished and the remaining quantity
  • What components (materials) have been issued

Pretty basic information, right? Are you getting what you need to know? If not, then you may want to reexamine how your BPCS files are setup and what transactions along with their frequency are captured.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 178 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

BPCS/LX Tip of the Week: Indirect Time

Anthony Etzel 0 1002 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.
 

  1. If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  2. If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

 

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

 

10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 37444 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 72079 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 78787 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 31211 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

First115116117118120122123124Last

Tips:  LX | BPCS | M3

New IDF Inquiries 

Infor LX has a long history of providing IDF inquiries over most critical business areas, but there are still some areas that lack this capability.
The following IDF inquiries are now available in 8.4.2:

  • Customer Quote
  • Customer Quote Line
  • RMA (Return Material Authorization)
  • RMA Line

Benefits

  • Ability to sort, subset, filter, and view information in a modern and intuitive way
  • Point and click navigation to related information – 360 views
    • Exceptional personalization and extensibility capabilities

New IDF Inquiries 

Infor LX has a long history of providing IDF inquiries over most critical business areas, but there are still some areas that lack this capability.
The following IDF inquiries are now available in 8.4.2:

  • Customer Quote
  • Customer Quote Line
  • RMA (Return Material Authorization)
  • RMA Line

Benefits

  • Ability to sort, subset, filter, and view information in a modern and intuitive way
  • Point and click navigation to related information – 360 views
    • Exceptional personalization and extensibility capabilities
Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Materials Tips: Serialized and Lot Controlled Items

Serial and Lot are additional characteristics/properties of Items that can be used to uniquely or collectively identify and track the item along with its Item code. Any Item can be made as Serialized and/or Lot controlled by choosing options "Serialized" and "Lot Controlled" in Items-General session under traceability section on the Details tab.

Further in Items-Warehousing data under the Identification tab, you can enable "Lot Tracking", "Lot in Inventory", "Serial Tracking" and "Serial in Inventory" which enables tracking of the Items. You can also define if the Item is "Serial/Lot not in inventory" then where you want to record the serial and lot details in the transactions like "Direct Delivery", "Receipt", "Transfer", "Register during As-Built, Service and Maintenance".

Below are some topics related to Serialized and Lot Controlled Items that will be useful:

Convert non-Serialized Item to Serialized and non-Lot Controlled item to Lot Controlled and Vice Versa

If Item is created as non-Serialized and/or non-Lot controlled... To change them to Serialized or Lot Controlled, here are some standard Sessions that can be used:

1.Convert (to) Serialized Item (whltc5201m000) can also be accessed from Item-Serials and Warehouses session's Specific Menu.

Note: Once Item is marked or converted as Serialized, it is not possible to revert the item to non-Serialized Items using this session. If any Item has to be converted to non-Serialized, then some Knowledge articles are available to show workaround steps.

2. Convert (to) Lot Item (whltc1202m000) can also be accessed from Item-Lot session's Specific Menu.


Related KB Articles:

2121795 - Item non-Serialized (Not Serial In Inventory) to Serialized (Serial In Inventory) Conversion.
692338 - Is it possible to convert a Serialized Controlled Item into a Not Serialized Controlled Item?
2057953 - Unable to convert a Lot Item to Serialized Item.
723772 - Blocking Message when Trying to Change a Non-Serialized Item to a Serialized Item.
1960873 - Register Serial Issue During As-Built Automatically Set after Converting to Serialized Item.
1134182 - Convert Item to Lot Controlled.
2084394 - Not able to convert Not Lot Controlled Item to Lot in Inventory.
1634725 - Procedure to covert (to) Lot Item (WHLTC1202M000) without using mask.
1009296 - Convert to LOT Item triggered multiple lot numbers. What is the logic behind?
1968968 - Lot Price Not Set after Conversion from Not Lot Controlled to Lot Controlled.
1852794 - Change Lot Type of an Existing Lot.
1634723 - How to enable "Lot" field in the session "Convert (to) Lot Item (whltc1202m000)".

Previous Article Infor LN & Baan Tip: Can You Backflush An Item If Estimated Quantity is Zero?
Next Article Infor LN & Baan Tip: Latest Porting Set – All Versions of Infor LN & Baan
Print
70326 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories