Filtec Selects Crossroads RMC for Baan Data Collection

Kathy Barthelt 0 29176 Article rating: No rating

Filtec, a leading provider of in-line inspection solutions for the food, beverage, and pharmaceutical industries, has selected the Web Collect, formerly RMC3 data collection solution from Crossroads RMC for their Baan IV system. Filtec plans to implement Labor Reporting and Report Operations Complete as part of this project with the goal of eliminating manual data entry and gaining better visibility to gap time. The project is scheduled to go live in early November 2015.

BPCS/LX TIP OF THE DAY: MATERIAL REQUIREMENT DATES AND LEAD TIME OFFSETS IN MRP

Anthony Etzel 0 64212 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

Baan/LN Tip of the Week: Data Sizing Moving to LN

Kathy Barthelt 0 58156 Article rating: No rating

The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume.  Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 61573 Article rating: 3.0

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items

Kathy Barthelt 0 68169 Article rating: 3.0

If you have a parts warehouse and prefer to use SIC for planning (re-order point) but need to use MRP/MPS planning for production, create a non-nettable warehouse for the parts warehouse and run the SIC plan against that warehouse.

When running the SIC plan, be sure to set the Order System to “MPS to MRP” for Baan IV and to “Planned to Planned” for Baan V and LN.

Using this method you keep the parts inventory out of the production planning and in the hands of the parts warehouse planner.

BPCS/LX Tip of the Week: Indirect Time Reporting

Anthony Etzel 0 60251 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.

  • If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  • If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

Baan/LN Tip of the Week: Differences Between Constraint Planning in Baan IV and Enterprise Planning in LN

Kathy Barthelt 0 56909 Article rating: No rating

In Baan IV, a distinction is made between the actual ERP system and a separate planning tool which contains the Constraint Planning package. This tool was intended to work with any ERP system, not just with Baan IV. The Enterprise Planning package is now considered to be a package like any other package in Infor LN.

Users of Baan IV could choose whether they wanted to plan their supply in one of the following ways:

  • By using the MPS and MRP modules in the Manufacturing package.
  • By using the RPD and RMP modules in the Constraint Planning package.

Users of Infor LN can only use the Enterprise Planning package. The distinction between the MPS items and MRP items has been abandoned. In Infor LN, all items can be planned by using a combination of master-based planning methods and order-based planning methods.

Baan/LN Tip of the Week: Setting Up New Employees in LN

Kathy Barthelt 0 56722 Article rating: No rating

In LN, the People package is used to register the employee’s hours and expenses. To support the People package, the Employees - General (tccom0101m000) session only contains the general employee data.

The title of the Employees - General (tccom0101m000) session was changed to Employees – General (tccom0101m000).

From the Employees - General (tccom0101m000) session, users can start the following sessions to define the more specific employee data:

  • Employees - People (bpmdm0101m000).
  • Employees - Project (tppdm8101m000).
  • Employees - Service (tsmdm1140m000).
  • Skills by Employee (tcppl0120m000).
  • Employees by Team (tcppl0150m000).
  • Roles by Employee (tcppl0170m000).

After users define the employees, users can also start the listed sessions from the Employees Dashboard (bpmdm0101m100) session in People.

First113114115116118120121122Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Materials Tips: Serialized and Lot Controlled Items

Serial and Lot are additional characteristics/properties of Items that can be used to uniquely or collectively identify and track the item along with its Item code. Any Item can be made as Serialized and/or Lot controlled by choosing options "Serialized" and "Lot Controlled" in Items-General session under traceability section on the Details tab.

Further in Items-Warehousing data under the Identification tab, you can enable "Lot Tracking", "Lot in Inventory", "Serial Tracking" and "Serial in Inventory" which enables tracking of the Items. You can also define if the Item is "Serial/Lot not in inventory" then where you want to record the serial and lot details in the transactions like "Direct Delivery", "Receipt", "Transfer", "Register during As-Built, Service and Maintenance".

Below are some topics related to Serialized and Lot Controlled Items that will be useful:

Convert non-Serialized Item to Serialized and non-Lot Controlled item to Lot Controlled and Vice Versa

If Item is created as non-Serialized and/or non-Lot controlled... To change them to Serialized or Lot Controlled, here are some standard Sessions that can be used:

1.Convert (to) Serialized Item (whltc5201m000) can also be accessed from Item-Serials and Warehouses session's Specific Menu.

Note: Once Item is marked or converted as Serialized, it is not possible to revert the item to non-Serialized Items using this session. If any Item has to be converted to non-Serialized, then some Knowledge articles are available to show workaround steps.

2. Convert (to) Lot Item (whltc1202m000) can also be accessed from Item-Lot session's Specific Menu.


Related KB Articles:

2121795 - Item non-Serialized (Not Serial In Inventory) to Serialized (Serial In Inventory) Conversion.
692338 - Is it possible to convert a Serialized Controlled Item into a Not Serialized Controlled Item?
2057953 - Unable to convert a Lot Item to Serialized Item.
723772 - Blocking Message when Trying to Change a Non-Serialized Item to a Serialized Item.
1960873 - Register Serial Issue During As-Built Automatically Set after Converting to Serialized Item.
1134182 - Convert Item to Lot Controlled.
2084394 - Not able to convert Not Lot Controlled Item to Lot in Inventory.
1634725 - Procedure to covert (to) Lot Item (WHLTC1202M000) without using mask.
1009296 - Convert to LOT Item triggered multiple lot numbers. What is the logic behind?
1968968 - Lot Price Not Set after Conversion from Not Lot Controlled to Lot Controlled.
1852794 - Change Lot Type of an Existing Lot.
1634723 - How to enable "Lot" field in the session "Convert (to) Lot Item (whltc1202m000)".

Previous Article Infor LN & Baan Tip: Can You Backflush An Item If Estimated Quantity is Zero?
Next Article Infor LN & Baan Tip: Latest Porting Set – All Versions of Infor LN & Baan
Print
71242 Rate this article:
4.3
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories