Baan/LN Tip of the Week: Old Porting Set

Kathy Barthelt 0 51877 Article rating: No rating

Here are some issues that you might run into if you stay on an old porting set too long:

  • Incompatibility because of operating system patches
  • Printing issues because of out-of-date libraries
  • Potential performance issues if binaries are not updated
  • Updating third-party products may not be possible because of dependencies
  • Limited support from Infor
  • Issues with updating database software/patches because of dependencies (if the database is also running on the same server as the application)

Need help getting on a newer porting set? Let us know! We’d be happy to help.

Crossroads MES Released for Windows 10

Anthony Etzel 0 27397 Article rating: No rating

Crossroads RMC is pleased to announce the availability of Crossroads MES, V11 for Windows 10. Any customers wishing to upgrade from a previous version to V11 can do so by contacting  support@crossroadsrmc.com. As previously announced, Crossroads MES  is also compatible with tablet PCs running Windows 8.1. Tablet PCs are becoming the clipboard replacement for supervisors and managers to monitor what’s happening on the shop floor.

BPCS/LX Tip of the Week: Shop Order Release Date

Anthony Etzel 0 63109 Article rating: No rating

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 59355 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

BPCS/LX Tip of the Week: Receiving to Inspection

Anthony Etzel 0 67067 Article rating: No rating

If the item being received needs to be inspected prior to being available for use, there are two schools of thought.

The first is to receive the item to a QC hold location. The downside is the item will show up in on hand inventory.

A better method would be to do a PO receipt to inspection. Both Inv500 and Pur550 support this method. Now you have received the item without showing it in inventory. Only the PO quantity in inspection is updated. This method also allows you to create an Inspection Dispatch Report. After the QC process for the item is complete, then the transaction Receipt from Inspection to Stock is processed. That transaction then updates the PO quantity received field and the Item on hand field in inventory.

Baan/LN Tip of the Week: Purchase Inquiry

Kathy Barthelt 0 85427 Article rating: No rating

In Baan IV Purchase Control, the purchase inquiry procedure enables the user to:

  • Request a specific supplier to submit a quotation on the purchase inquiry for the delivery of an item.
  • Compare the prices and discounts of the quotations that are submitted by different suppliers.
  • Copy the inquiry data to a purchase order.


In LN, you can:

  • Request multiple business partners to submit a quotation on a specific request-for-quotation for the delivery of an item.
  • Compare the received quotations based on the following criteria:
  1. Price
  2. Quantity
  3. Vendor rating
  4. Delivery dates
  5. RFQ subjective criteria
  • Copy the quotation data to a purchase order, a purchase contract, or a price book.

BPCS/LX Tip of the Week: Shop Order Release Date

Anthony Etzel 0 59147 Article rating: No rating

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 60925 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

First112113114115117119120121Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Infor LN & Baan Tip of the Week: Reports to Analyze Company Performance

You know what data you need to analyze your company’s financial and production health, but sometimes it's a struggle to get that data in a format that is meaningful. Here are some reports in Baan IV, Baan V, and Infor LN which you may find useful.

As is the case with most ERP reports, with each version progression from Baan IV, to Baan V, to LN, there are improvements in selection criteria and report content. Some may require some setup and others may require some formatting if you would like to export them to Excel.  Contact me if you have questions or need assistance.

BAAN & LN FINANCE:

Baan IV –

Customer Statistics Module

  • Print Customer Statistics by Customer/Credit Analyst (tfcmg3400m000)
    • Prints Average Days Payment, Amount Paid, Average Days Outstanding, Amount Open, Discounts Allowed and Discounts Taken.  
       
  • Print Average Days Outstanding (tfcmg3401m000)
    • Prints Open Amount and Average Days Outstanding.
  • Print Average Receipt Days (tfcmg3402m000)
    • Prints Amount Paid and Average Number of Days for a Payment.


Cash Forecasting Module

  • Print Cash Forecast Summary by Period/Currency (tfcmg3410m000)
    • Prints Total Cash coming in from Sales Invoices, Sales Orders, Sales Quotes, Project Orders, and Budgets. Prints Total Cash going out from Purchase Invoices, Purchase Orders, Standing Orders, and Budgets.
       
  • Print Cash Forecast Summary by Date/Currency (tfcmg3411m000)
    • Prints the same as above but by a specific date.
       
  • Print Cash Forecast Details by Period/Currency (tfcmg3412m000)
    • Prints the same as above but by each period across in columns.
       
  • Prints Detailed Cash Forecast in Home Currency (tfcmg3413m000)
    • Prints each item, purchase order, sales order, etc, with forecast in home currency.


Baan V –

  • Print Finalized Transactions Ledger Account – tfgld1406m000
    • Output can be run to show transactions (debit/credit) by ledger account, transaction type, and time periods. This can be run by range of ledger account and/or range of periods.
  • Print Integration Transactions -tfgld4410m000
    • This has 3 options: a short version of the report, a standard version, and a version by company/ledger account.

Infor LN -

  • Print Finalized Transactions Ledger Account – tfgld1406m000
    • Output can be run to show transactions (debit/credit) by ledger account, transaction type, and time periods. This can be run by range of ledger account and/or range of periods.
  • Print Integration Transactions by Business Flow – tfgld4482m100
    • Output can be run to show all transactions (debit/credit) by business object (production/purchasing/sales)


BAAN & LN MANUFACTURING:

Baan IV

  • Print Actual Cost by Production Order ticst0401m000
    • This report can be run at any time in the production order’s life to show how hours-spent and material-used compare between estimated and actual usage.
       
  • Print Work Center Utilization By Week tiscf1402m000
    • This report shows capacity issues at work centers/machines which help identify production bottlenecks.


Baan V

  • Print Estimated vs Actual Material Costs ticst0401m000
    • This report can be run at any time in the production order’s life to show how actual material-used compares to estimated usage.
       
  • Print Estimated vs Actual Hour Costs ticst0402m000
    • This report can be run at any time in the production order’s life to show how actual hours-spent compares estimated hours.
       
  • Print Work Center Utilization By Week tiscf1402m000
    • This report shows capacity issues at work centers/machines which help identify production bottlenecks.


Infor LN

  • Print Estimated vs Actual Material Costs ticst0401m000
    • This report can be run at any time in the production order’s life to show how actual material-used compares to estimated usage.
       
  • Print Estimated vs Actual Hour Costs ticst0402m000
    • This report can be run at any time in the production order’s life to show how actual hours-spent compares estimated hours.
       
  • Utilization report from– Print Resource Order Plan cprrp0430m000
    • This report from Enterprise Planning will show all orders from planning and production. By incorporating both order types, capacity issues can be seen short range where planning has determined that new orders are needed, as well as long range where planners may find opportunities to shift work or even to plan machine maintenance.

Previous Article The Best Baan | Infor LN Manufacturing Reports to Analyze Company Performance
Next Article Infor LN & Baan Tip of the Week: Year End
Print
68167 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories