BPCS/LX Tip of the Week: Receiving to Inspection

Anthony Etzel 0 66567 Article rating: No rating

If the item being received needs to be inspected prior to being available for use, there are two schools of thought.

The first is to receive the item to a QC hold location. The downside is the item will show up in on hand inventory.

A better method would be to do a PO receipt to inspection. Both Inv500 and Pur550 support this method. Now you have received the item without showing it in inventory. Only the PO quantity in inspection is updated. This method also allows you to create an Inspection Dispatch Report. After the QC process for the item is complete, then the transaction Receipt from Inspection to Stock is processed. That transaction then updates the PO quantity received field and the Item on hand field in inventory.

Baan/LN Tip of the Week: Purchase Inquiry

Kathy Barthelt 0 85039 Article rating: No rating

In Baan IV Purchase Control, the purchase inquiry procedure enables the user to:

  • Request a specific supplier to submit a quotation on the purchase inquiry for the delivery of an item.
  • Compare the prices and discounts of the quotations that are submitted by different suppliers.
  • Copy the inquiry data to a purchase order.


In LN, you can:

  • Request multiple business partners to submit a quotation on a specific request-for-quotation for the delivery of an item.
  • Compare the received quotations based on the following criteria:
  1. Price
  2. Quantity
  3. Vendor rating
  4. Delivery dates
  5. RFQ subjective criteria
  • Copy the quotation data to a purchase order, a purchase contract, or a price book.

BPCS/LX Tip of the Week: Shop Order Release Date

Anthony Etzel 0 58754 Article rating: No rating

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 60561 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

Filtec Selects Crossroads RMC for Baan Data Collection

Kathy Barthelt 0 28994 Article rating: No rating

Filtec, a leading provider of in-line inspection solutions for the food, beverage, and pharmaceutical industries, has selected the Web Collect, formerly RMC3 data collection solution from Crossroads RMC for their Baan IV system. Filtec plans to implement Labor Reporting and Report Operations Complete as part of this project with the goal of eliminating manual data entry and gaining better visibility to gap time. The project is scheduled to go live in early November 2015.

BPCS/LX TIP OF THE DAY: MATERIAL REQUIREMENT DATES AND LEAD TIME OFFSETS IN MRP

Anthony Etzel 0 63816 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

Baan/LN Tip of the Week: Data Sizing Moving to LN

Kathy Barthelt 0 57891 Article rating: No rating

The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume.  Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 61342 Article rating: 3.0

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

First111112113114116118119120Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

[EasyDNNnews:IfExists:Event]
[EasyDNNnews:IfExists:EventRegistration][EasyDNNnews:EventRegistration:RegisterButton][EasyDNNnews:EndIf:EventRegistration] [EasyDNNnews:IfExists:Payment][EasyDNNnews:Price][EasyDNNnews:EndIf:Payment] [EasyDNNnewsLocalizedText:Eventdate]: [EasyDNNnews:EventDate] [EasyDNNnewsLocalizedText:ExportEvent] [EasyDNNnews:IfExists:EventLocation]

[EasyDNNnewsLocalizedText:EventLocation]: [EasyDNNnews:EventLocation]

[EasyDNNnews:EndIf:EventLocation] [EasyDNNnews:IfExists:EventRegistration]
  • [EasyDNNnewsLocalizedText:NumberOfAttendants]: [EasyDNNnews:EventRegistration:NumberOfAttendants]
  • [EasyDNNnewsLocalizedText:MaxNumberOfTickets]: [EasyDNNnews:EventRegistration:MaxNumberOfTickets]
  • [EasyDNNnewsLocalizedText:NotUsedTickets]: [EasyDNNnews:EventRegistration:NotUsedTickets]
  • [EasyDNNnews:IfExists:Payment]
  • [EasyDNNnewsLocalizedText:Price]: [EasyDNNnews:Price]
  • [EasyDNNnews:EndIf:Payment]
[EasyDNNnews:EventRegistration:InfoMessage] [EasyDNNnews:EndIf:EventRegistration] [EasyDNNnews:IfExists:EventSignUp]

[EasyDNNnewsLocalizedText:AreYouGoing]

[EasyDNNnews:SignUpActionBar]
[EasyDNNnews:EndIf:EventSignUp]
[EasyDNNnews:EndIf:Event]
Kathy Barthelt
/ [EasyDNNnewsLocalizedText:Categories]: [EasyDNNnews:Categories]

Infor LN & Baan Tips & Tricks for EXECUTIVES

TECHNOLOGY: LN Report Archive

The LN Report Archive solution enables you to archive reports, so you can reprint them, even several years after they are initially printed.

Archiving is particularly useful for external documents, which are reports that are sent, for example, to customers and suppliers, such as invoices and orders.

In some countries having this type of reports that can be reprinted for at least 10 years after the reports are initially printed is a legal requirement.

In the LN Report Archive solution, you have these options:

  • Specify which reports must be archived. When printed, these reports are automatically stored in an archive folder.
  • Reprint the archived reports.
  • Maintain the archived reports, for example, move archived reports to another folder or to a CD-R(W)/DVD.

Note: Reports that are printed to Business Objects Reports are archived in the same way as other reports. However, you cannot reprint archived reports on a Business Objects device.

OPERATIONS: Revisions and approval

Note that the Bill of Material and Routing are revision controlled. When a structure is generated for the first time, a first revision is made with status New.

If the Approve Structures Automatically check box is selected in the Job Shop Master Data Parameter (tirou0500m000) session, the revision is created with status Approved.

If the structure is regenerated, the current revision status determines the result:

  • If the status is New, this revision is overwritten
  • If the status is Approved, a new revision is created

FINANCE: Moving calendar periods

You can move monthly periods to a different parent period. For example, if you have a monthly calendar, you can create quarter periods and move months to the quarters.

  1. Select Financials > Global Ledger > Setup > Finance Enterprise Group > Maintenance.
  2. Open the finance enterprise group.
  3. Click the Calendar tab.
  4. Open the calendar for which you want to move periods.
  5. Click the Hierarchy tab.
  6. Select the periods to move.
  7. Select Actions > Move.
  8. Select the new parent period under which you want to move the periods.
  9. Click OK.
Previous Article Infor LN & Baan Tips & Tricks for EXECUTIVES
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: LN Report Archive
Print
638 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories