BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 60896 Article rating: 3.0

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items

Kathy Barthelt 0 67219 Article rating: 3.0

If you have a parts warehouse and prefer to use SIC for planning (re-order point) but need to use MRP/MPS planning for production, create a non-nettable warehouse for the parts warehouse and run the SIC plan against that warehouse.

When running the SIC plan, be sure to set the Order System to “MPS to MRP” for Baan IV and to “Planned to Planned” for Baan V and LN.

Using this method you keep the parts inventory out of the production planning and in the hands of the parts warehouse planner.

BPCS/LX Tip of the Week: Indirect Time Reporting

Anthony Etzel 0 59610 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.

  • If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  • If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

Baan/LN Tip of the Week: Differences Between Constraint Planning in Baan IV and Enterprise Planning in LN

Kathy Barthelt 0 56078 Article rating: No rating

In Baan IV, a distinction is made between the actual ERP system and a separate planning tool which contains the Constraint Planning package. This tool was intended to work with any ERP system, not just with Baan IV. The Enterprise Planning package is now considered to be a package like any other package in Infor LN.

Users of Baan IV could choose whether they wanted to plan their supply in one of the following ways:

  • By using the MPS and MRP modules in the Manufacturing package.
  • By using the RPD and RMP modules in the Constraint Planning package.

Users of Infor LN can only use the Enterprise Planning package. The distinction between the MPS items and MRP items has been abandoned. In Infor LN, all items can be planned by using a combination of master-based planning methods and order-based planning methods.

Baan/LN Tip of the Week: Setting Up New Employees in LN

Kathy Barthelt 0 55798 Article rating: No rating

In LN, the People package is used to register the employee’s hours and expenses. To support the People package, the Employees - General (tccom0101m000) session only contains the general employee data.

The title of the Employees - General (tccom0101m000) session was changed to Employees – General (tccom0101m000).

From the Employees - General (tccom0101m000) session, users can start the following sessions to define the more specific employee data:

  • Employees - People (bpmdm0101m000).
  • Employees - Project (tppdm8101m000).
  • Employees - Service (tsmdm1140m000).
  • Skills by Employee (tcppl0120m000).
  • Employees by Team (tcppl0150m000).
  • Roles by Employee (tcppl0170m000).

After users define the employees, users can also start the listed sessions from the Employees Dashboard (bpmdm0101m100) session in People.

BPCS/LX Tip of the Week: Understanding What Goes On – Out on the Factory Floor

Anthony Etzel 0 59484 Article rating: No rating

Ok… so you want to know the status of a specific shop order that was released two days ago.

What do you do?

It’s a sure bet that you have a manager, supervisor, or planner who can walk the floor and find the order at whatever work center it happens to be at. He/she can then answer “what operations have been completed and how many were completed?” All this requires leg work, and of course, a fair amount of time.

Now, if you have setup your BPCS master files properly, and you report transaction activity, you should be able to get those shop order statuses much faster using the SFC300 Shop Order Inquiry Screen.

At your fingertips you can see:

  • Release date & due date
  • How many hours remain in total and at each operation
  • The quantity required, what was finished and the remaining quantity
  • What components (materials) have been issued

Pretty basic information, right? Are you getting what you need to know? If not, then you may want to reexamine how your BPCS files are setup and what transactions along with their frequency are captured.

BPCS/LX Tip of the Week: Changing the Master Schedule

Anthony Etzel 0 760 Article rating: No rating

You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule.

You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file.

First109110111112114116117118Last

Tips:  LX | BPCS | M3

New IDF Inquiries 

Infor LX has a long history of providing IDF inquiries over most critical business areas, but there are still some areas that lack this capability.
The following IDF inquiries are now available in 8.4.2:

  • Customer Quote
  • Customer Quote Line
  • RMA (Return Material Authorization)
  • RMA Line

Benefits

  • Ability to sort, subset, filter, and view information in a modern and intuitive way
  • Point and click navigation to related information – 360 views
    • Exceptional personalization and extensibility capabilities

New IDF Inquiries 

Infor LX has a long history of providing IDF inquiries over most critical business areas, but there are still some areas that lack this capability.
The following IDF inquiries are now available in 8.4.2:

  • Customer Quote
  • Customer Quote Line
  • RMA (Return Material Authorization)
  • RMA Line

Benefits

  • Ability to sort, subset, filter, and view information in a modern and intuitive way
  • Point and click navigation to related information – 360 views
    • Exceptional personalization and extensibility capabilities
Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Materials Tips: Serialized and Lot Controlled Items

Serial and Lot are additional characteristics/properties of Items that can be used to uniquely or collectively identify and track the item along with its Item code. Any Item can be made as Serialized and/or Lot controlled by choosing options "Serialized" and "Lot Controlled" in Items-General session under traceability section on the Details tab.

Further in Items-Warehousing data under the Identification tab, you can enable "Lot Tracking", "Lot in Inventory", "Serial Tracking" and "Serial in Inventory" which enables tracking of the Items. You can also define if the Item is "Serial/Lot not in inventory" then where you want to record the serial and lot details in the transactions like "Direct Delivery", "Receipt", "Transfer", "Register during As-Built, Service and Maintenance".

Below are some topics related to Serialized and Lot Controlled Items that will be useful:

Convert non-Serialized Item to Serialized and non-Lot Controlled item to Lot Controlled and Vice Versa

If Item is created as non-Serialized and/or non-Lot controlled... To change them to Serialized or Lot Controlled, here are some standard Sessions that can be used:

1.Convert (to) Serialized Item (whltc5201m000) can also be accessed from Item-Serials and Warehouses session's Specific Menu.

Note: Once Item is marked or converted as Serialized, it is not possible to revert the item to non-Serialized Items using this session. If any Item has to be converted to non-Serialized, then some Knowledge articles are available to show workaround steps.

2. Convert (to) Lot Item (whltc1202m000) can also be accessed from Item-Lot session's Specific Menu.


Related KB Articles:

2121795 - Item non-Serialized (Not Serial In Inventory) to Serialized (Serial In Inventory) Conversion.
692338 - Is it possible to convert a Serialized Controlled Item into a Not Serialized Controlled Item?
2057953 - Unable to convert a Lot Item to Serialized Item.
723772 - Blocking Message when Trying to Change a Non-Serialized Item to a Serialized Item.
1960873 - Register Serial Issue During As-Built Automatically Set after Converting to Serialized Item.
1134182 - Convert Item to Lot Controlled.
2084394 - Not able to convert Not Lot Controlled Item to Lot in Inventory.
1634725 - Procedure to covert (to) Lot Item (WHLTC1202M000) without using mask.
1009296 - Convert to LOT Item triggered multiple lot numbers. What is the logic behind?
1968968 - Lot Price Not Set after Conversion from Not Lot Controlled to Lot Controlled.
1852794 - Change Lot Type of an Existing Lot.
1634723 - How to enable "Lot" field in the session "Convert (to) Lot Item (whltc1202m000)".

Previous Article Infor LN & Baan Tip: Can You Backflush An Item If Estimated Quantity is Zero?
Next Article Infor LN & Baan Tip: Latest Porting Set – All Versions of Infor LN & Baan
Print
70332 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories