Anthony Etzel 0 62523 Article rating: No rating

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 58264 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

BPCS/LX Tip of the Week: Receiving to Inspection

Anthony Etzel 0 66265 Article rating: No rating

If the item being received needs to be inspected prior to being available for use, there are two schools of thought.

The first is to receive the item to a QC hold location. The downside is the item will show up in on hand inventory.

A better method would be to do a PO receipt to inspection. Both Inv500 and Pur550 support this method. Now you have received the item without showing it in inventory. Only the PO quantity in inspection is updated. This method also allows you to create an Inspection Dispatch Report. After the QC process for the item is complete, then the transaction Receipt from Inspection to Stock is processed. That transaction then updates the PO quantity received field and the Item on hand field in inventory.

Baan/LN Tip of the Week: Purchase Inquiry

Kathy Barthelt 0 84296 Article rating: No rating

In Baan IV Purchase Control, the purchase inquiry procedure enables the user to:

  • Request a specific supplier to submit a quotation on the purchase inquiry for the delivery of an item.
  • Compare the prices and discounts of the quotations that are submitted by different suppliers.
  • Copy the inquiry data to a purchase order.


In LN, you can:

  • Request multiple business partners to submit a quotation on a specific request-for-quotation for the delivery of an item.
  • Compare the received quotations based on the following criteria:
  1. Price
  2. Quantity
  3. Vendor rating
  4. Delivery dates
  5. RFQ subjective criteria
  • Copy the quotation data to a purchase order, a purchase contract, or a price book.

BPCS/LX Tip of the Week: Shop Order Release Date

Anthony Etzel 0 58458 Article rating: No rating

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 59743 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

Filtec Selects Crossroads RMC for Baan Data Collection

Kathy Barthelt 0 28854 Article rating: No rating

Filtec, a leading provider of in-line inspection solutions for the food, beverage, and pharmaceutical industries, has selected the Web Collect, formerly RMC3 data collection solution from Crossroads RMC for their Baan IV system. Filtec plans to implement Labor Reporting and Report Operations Complete as part of this project with the goal of eliminating manual data entry and gaining better visibility to gap time. The project is scheduled to go live in early November 2015.

BPCS/LX TIP OF THE DAY: MATERIAL REQUIREMENT DATES AND LEAD TIME OFFSETS IN MRP

Anthony Etzel 0 63521 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

First108109110111113115116117Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for OPERATIONS: Copy Customized Product Structure to Standard Structure (tipcs2232m000)

This functionality allows you to copy the product structure of a customized item to a standard item.

Note: When a customized structure is copied to a standard structure, the Customized check box in the Items session (tcibd0501m000) is cleared.

Item Types:

  • Standard Items: Identified by a regular item code.

  • Segmented Items: Consist of a project code segment and an item base segment (i.e., the customized item’s item code). Segments are defined in the Item Code Segmentation session (tcibd0500m000).

Only components valid for the specified Effectivity Unit will be copied.

Copy Options:

  • Target Routing Code
    Enter the code of the standard routing to which the customized structure should be copied.

  • Copy Product Structure
    Choose whether to:

    • Copy the entire structure

    • Copy only the first level

    • Perform the copy interactively

  • Reference Date
    Only parts of the product structure valid on this date will be copied.

  • Copy E-Item Relationships
    If selected, related E-item records will be copied.

  • Copy All Components and Effectivity Statements
    If selected, unit effectivity is copied to the standard structure. You can specify the unit.
    Exceptions related to routings and operations (that meet date effectivity) are also copied.

  • Alternative Material
    If selected, alternative BOM components are included in the copy.

  • Use-Up Material
    If selected, use-up materials from BOM components are included.

  • New Item Codes for Existing Standard Components
    If selected, LN generates new item codes for existing standard components in the structure.

  • Approve Conversion Factors

    • Selected: LN copies and approves conversion factors for the target item.

    • Cleared: LN copies the factors, but approval must be done manually in the Conversion Factors session (tcibd0103m000).

  • Copy to Standard Item Configuration
    If selected, the customized or generic item product structure is copied to the specified standard item configuration.

​Important Note: This option is only enabled if the Use Standard Item for Configuration check box is selected in the Product Configuration Parameters session (tipcf0100m000).Copying is only possible if the product variant is not active in Order Management. Active supply orders linked to the product structure will lose association with sales orders/quotations when the structure is regenerated.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Rebuild History for Account Matching (tfgld1218m000)
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Authorization and Security - LN REST APIs
Print
1245 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories