BPCS/LX Tip of the Week: Changing the Master Schedule

Anthony Etzel 0 52151 Article rating: No rating

You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule.

You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file.

Baan/LN Tip of the Week: Switching to a Difference Series

Kathy Barthelt 0 71495 Article rating: No rating

In general, you can enter a different series in the order field if you have an available series. To add a new series, find the appropriate group in the First Free Number session, and add a new series and first free number (usually 1).

In Baan IV, go to the Maintain First Free Numbers Session (under Common, Tables, Maintain Logistics Tables, Maintenance 1). Groups are easily identified (e.g., Purchase Order, Sales Order, etc.).

In Baan V, go to the First Free Number Session (under Common Data, Tables, Logistics). There are number groups (e.g., 570 may be for Purchase Orders, 650 may be for Sales Orders, etc.).

In LN, go to the First Free Number Session (tcmcs0150m000 – it is in different places in the menu under different Feature Packs). There are number groups (e.g., 210 may be for Purchase Orders, 310 may be for Sales Orders, etc.).

Hoffmaster Clintonville Plant Goes Live with Crossroads MES & LX

Anthony Etzel 0 32863 Article rating: No rating

On March 1, 2016, Hoffmaster’s Clintonville plant went live with Crossroads MES and LX. The goal of the project was to convert from another ERP to LX and replace a green screen MES system that required the manual recording of production and labor activity keyed from shop floor terminals.

Hoffmaster achieved their goal by completing a successful data conversion and detailed prototyping of LX and Crossroads. The project team remarked that the Crossroads MES implementation was by far the easiest part of the project. One of the critical requirements of the chosen MES solution was to verify UPC and UCC label formats that called for in-line labeling of product packages and cases. Crossroads MES satisfied that requirement, and also provided an interface to finished goods inventory via the scanning of LPN numbers when reporting production.

The Clintonville plant is a leading manufacturer of disposable tabletop products.

BPCS/LX Tip of the Week: Actual Costs for Manufactured Items

Anthony Etzel 0 53407 Article rating: 5.0

In LX, the actual costs that can be set up fall into three categories: Material, Labor, and Overhead. If your LX database is set up properly with the LX cost accounting, you should be able to identify:

  • How much the item should cost
  • How to track the cost of work underway
  • How much the item actually did cost
  • Why the job cost varied from the expected cost
     

Capturing the data to track activity with associated costs can be time-consuming. With an MES solution, the information you need for costing is tracked instantly.

Baan/LN Tip of the Week:GRINYA Reconciliation – What Could Go Wrong?

Kathy Barthelt 0 78158 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan or LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

To ensure, it’s recommended that the Integrations Setup tables should be audited either through Baan/LN or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Morrison Brothers Goes Live With Crossroads MES in Record Time!

Crossroads RMC 0 32353 Article rating: No rating

On February 18, 2016, the Maquoketa plant of Morrison Brothers went live with the Crossroads MES solution. The goal was to remove all the shop floor paperwork and eliminate the manual recording of production and labor. The company achieved this goal in just 96 days from project kick-off to go live. Included in the go-live was the ability to deliver drawings electronically to the Crossroads MES workstations. This was a critical component of the implementation as it ensured that each workstation would always be operating off the latest revision of the engineering documents.

A rollout of the Crossroads MES solution is planned for Morrison’s Dubuque plants later this year. 

Morrison Brothers is a major producer of petroleum marketing equipment in the United States and abroad.

Baan/LN Tip of the Week: Old Porting Set

Kathy Barthelt 0 73810 Article rating: No rating

Here are some issues that you might run into if you stay on an old porting set too long:

  • Incompatibility because of operating system patches
  • Printing issues because of out-of-date libraries
  • Potential performance issues if binaries are not updated
  • Updating third-party products may not be possible because of dependencies
  • Limited support from Infor
  • Issues with updating database software/patches because of dependencies (if the database is also running on the same server as the application)

Need help getting on a newer porting set? Let us know! We’d be happy to help.

BPCS/LX Tip of the Week: Establish Costing For Purchased Items

Anthony Etzel 0 51775 Article rating: No rating

How Does Infor LX Establish Costing For Purchased Items?

In LX, you will establish a standard cost (you define the standard) that LX will use for the purchase items. You also need to establish in LX the Cost Type, the Cost Bucket, and the Cost Set needed for cost accounting.

First107108109110112114115116Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Materials Tip: Sales Quotations

Sales quotations are used to supply a sold-to business partner with the required details to make a purchasing decision.

You can create a sales quotation in response to a request for quotation (RFQ) from a business partner, or as a sales tool to initiate the sales process with potential business partners. A quotation includes the dates, terms, items, or item descriptions to be sold, and a success percentage, which reflects the level of certainty that the quotation will be accepted. Sales quotations are included in the planning modules based on their success percentages. Quotations with a high success percentage are considered as sold.

You can print and send quotations to business partners. You can specify the results of the returned quotations in Sales. If the quotation is not accepted, you can specify the reason for failure and the competitor who won the quote. If the business partner accepts the quotation, you can transfer the quotation to a sales order and specify the reason for success.

Sales quotation procedure - The normal sales quotation procedure includes the creation, printing, specification of results, and processing of sales quotations.

Additional processes - A number of processes do not always occur in the sales quotation procedure, but can be used optionally, such as ATP and CTP checks, creating alternative quotation lines, and copying bill of material components to a sales quotation.

Inserting items from a catalog - You can add items from a catalog to a sales quotation.

Product variants -  You can configure or link product variants for generic items on the sales quotation line.

Price stages - You can link a price stage to a sales quotation line. When processing the quotation to a sales order, the price stage is copied from the quotation line to the sales order line. Sales order lines can be blocked based on the price stage.

Material price information - You can link material price information to a sales quotation line. As a result, the (document line) price on the sales quotation line includes material prices.

After-sales services -  You can specify the after-sales services that will apply to a sold item after delivery. When processing a quotation to a sales order, the after-sales service data is copied from the sales quotation to the sales order.

Project pegging in sales - To identify costs, demand, and supply for a project, you can peg project costs for sales quotation.

Previous Article Infor LN & Baan Finance Tip: What Can You Do in the Financial Statements Module?
Next Article Infor LN & Baan Tip: Job Management
Print
68235 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories