Infor ERP Tips and Infor ERP News for Infor LX, BPCS, Infor ERP LX, Infor LN, Infor ERP LN, Baan, Infor M3, and Movex

Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX TIP OF THE WEEK: INVENTORY MANAGEMENT

Anthony Etzel 0 37669 Article rating: No rating

Establishing the Quantity On-Hand and the Quantity Available.

LX maintains buckets for information associated with the following inventory transactions for each item:

  • Opening Balance
  • Issues
  • Receipts
  • Adjustments
  • Allocations for the Customer
  • Allocations for Manufacturing

The on hand quantity does not include any allocations. To arrive at the on hand quantity, start with the opening balance, less any issues, plus any receipts, then add or subtract any adjustments. Available inventory is the on-hand less any allocations.

Baan/LN Tip of the Week: Old Porting Set

Kathy Barthelt 0 138824 Article rating: No rating

Here are some issues that you might run into if you stay on an old porting set too long:

  • Incompatibility because of operating system patches
  • Printing issues because of out-of-date libraries
  • Potential performance issues if binaries are not updated
  • Updating third party products may not be possible because of dependencies
  • Limited support from Infor
  • Issues with updating database software/patches because of dependencies (if database is also running on same server as application)

Need help getting on a newer porting set? Let us know! We’d be happy to help.

Crossroads RMC Moves Arrowhead from 4.0.05CD to Infor LX

Crossroads RMC 0 35360 Article rating: 5.0

Arrowhead Products, a world leader in the design, development and manufacture of ducting systems for aircraft and propulsion lines for rocks, has partnered with Crossroads RMC to move from BPCS 4.0.05CD to Infor LX. Crossroads RMC is providing financial business consulting as part of this project. Go live is expected in Q4 of 2017.

Baan/LN Tip of the Week: What Could go Wrong With GRINYA?

Kathy Barthelt 0 232818 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan/LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

It is recommended that the Integrations Setup tables be audited either through Baan or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Still have GRINYA questions you need answered?
Contact us. We’d be happy to help.

Optimize Your Manufacturing Today!
 

BPCS/LX Tip of the Week: Efficiency– The What & How

Anthony Etzel 0 53467 Article rating: No rating

Efficiency is something we all strive for in our personal lives and at work. How can manufacturers increase their efficiency? Take a hard look at the 4 key areas:

  1. Planning
  2. Bill of Material and Job Accuracy
  3. Inventory Planning
  4. Real Time Reporting / Processing 

Need help figuring out how to become more efficient in each of these areas? Contact us, we’d be happy to help.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Actual Versus Standard

Anthony Etzel 0 53720 Article rating: No rating

Job costing based on standards is great, but what if reality doesn’t match up to that?

What if jobs are really taking twice as long, and you don’t know that? What if jobs are taking ½ as long as you think, but you’re scheduling based on how much time they “should” take? Either way, you’re losing money and productivity. Getting a handle on start/stop times for jobs, and therefore the total amount of time actually spent allows you to take proper action and be more productive.

 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Project Templates

Kathy Barthelt 0 197269 Article rating: No rating

Project templates are useful because you can specify all of the information that you would normally want to include when creating a new project such as project structure, budget and so on.

In Baan IV/V, project templates do not exist, but you can set up a project template by creating a regular project, and setting the status to simulated or free. This is done so that the project does not create plans. Under this scenario, you can easily copy one project to another.

In LN, when you create a new project, a template can be used as the starting point. This is similar to copying a normal project, but unlike normal projects, no costs or revenues can be posted on a template.

Optimize Your Manufacturing Today!

 

First96979899101103104105Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Product Configurator - Part 2

Baan Tips

Who gets involved?
  1. Most commonly Engineering is involved in writing the rules, creating the bills and routings.
  2. Sales or Customer Service determines the questions and the order they are asked in.
  3. Sales or Customer Service determines the rules for the pricing.
  4. Sales, or Customer Service, and Engineering work together in determining the part number, description and text.

What are the steps?

  1. You must start by defining the features and options (questions and answers) and the order in which these are asked. We work this out first using sticky notes and large easel paper. Normally during the process we find that we want to move these questions around. Setting them down on paper makes the process of getting the data into Baan much more efficient. We also then have a record of what decisions were made prior to entering the data. This is normally a joint effort of Engineering and Sales. This is required and must be the first step.
  2. Constraints for features and options. These are the rules for determining what questions are asked and which options are allowed. This is generally done by Engineering or whoever is responsible for the configurator. This is required.
  3. Generic Bill of Material. All possible bill options are entered here and constraints are written to determine which options are selected based on the answers to the questions. This is generally done by Engineering or whoever is responsible for the configurator. This is a required step.
  4. Generic Routing. Similar to the bill of material, but used for generation of the routing steps. This is generally done by Engineering or whoever is responsible for the configurator. This is optional.
  5. Generic Item Data. This consists of creating custom item numbers, descriptions, text, material, size or standard fields in the custom item master. This is generally done by Engineering or whoever is responsible for the configurator though Sales may have some involvement. This is optional.
  6. Generic Pricing. This is used to calculate the selling price based on the answers to the questions. This is normally a responsibility of Sales or whoever determines the pricing. This group is also trained on writing the constraints for this section only. This is optional.

What other modules will be affected?
  1. Quotes, sales orders and projects.
  2. PRP planning for the configured items.
  3. Managing changes to the configuration. Who, what and when?
  4. Variant statistics.
  5. MPS and generic items.
Previous Article Baan/LN Tip of the Week: Product Configurator - Part 1
Next Article Baan/LN Tip of the Week: Printing Pick Lists
Print
125238 Rate this article:
3.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories