BPCS/LX Tip of the Week: Actual Versus Standard

Anthony Etzel 0 53297 Article rating: No rating

Job costing based on standards is great, but what if reality doesn’t match up to that?

What if jobs are really taking twice as long, and you don’t know that? What if jobs are taking ½ as long as you think, but you’re scheduling based on how much time they “should” take? Either way, you’re losing money and productivity. Getting a handle on start/stop times for jobs, and therefore the total amount of time actually spent allows you to take proper action and be more productive.

 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Project Templates

Kathy Barthelt 0 196164 Article rating: No rating

Project templates are useful because you can specify all of the information that you would normally want to include when creating a new project such as project structure, budget and so on.

In Baan IV/V, project templates do not exist, but you can set up a project template by creating a regular project, and setting the status to simulated or free. This is done so that the project does not create plans. Under this scenario, you can easily copy one project to another.

In LN, when you create a new project, a template can be used as the starting point. This is similar to copying a normal project, but unlike normal projects, no costs or revenues can be posted on a template.

Optimize Your Manufacturing Today!

 

Infor LX and Crossroads MES Selected by Blonder Tongue

Crossroads RMC 0 34090 Article rating: No rating

Blonder Tongue, a global communication equipment supplier for TV broadcasters, cable system operator, lodging video, Internet system, and institutional systems, has selected Crossroads RMC to assist them with a BPCS 6.0.04 upgrade to Infor LX. Crossroads RMC will be providing all applications and technical consulting for this project. Also included as part of the project will be the implementation of the Crossroads MES solution. Go live for both solutions is expected in January of 2018.

BPCS/LX Tip of the Week: LX 8.3.5 Facility Period Close

Anthony Etzel 0 47721 Article rating: 5.0

The Facility Period Close process was introduced in Infor LX 8.3.4 and has been enhanced in 8.3.5. This feature allows continuous or 24-hour worldwide operations in multiple facilities to submit Period End Close jobs for each facility as daily operations cease, or shifts end.

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Order Series Full – Switching to a Different Series

Kathy Barthelt 0 215487 Article rating: 5.0

In general, you can enter a different series in the order field if you have an available series.

To add a new series, find the appropriate group in the First Free Number session, and add a new series and first free number (usually 1).

In Baan IV, go to the Maintain First Free Numbers Session (under Common, Tables, Maintain Logistics Tables, Maintenance 1).
Groups are easily identified (e.g., Purchase Order, Sales Order, etc.).

In Baan V, go to the First Free Number Session (under Common Data, Tables, Logistics). There are number groups (e.g., 570 may be for Purchase Orders, 650 may be for Sales Orders, etc.).

In LN, go to the First Free Number Session (tcmcs0150m000 – it is in different places in the menu under different Feature Packs). There are number groups (e.g., 210 may be for Purchase Orders, 310 may be for Sales Orders, etc.).

BPCS/LX Tip of the Week: Revisit The Last Brilliant Idea

Anthony Etzel 0 50011 Article rating: No rating

Sometimes the best ideas have to be tabled due to competing priorities. That doesn’t mean that the idea was bad. Revisit previously suggested cost savings ideas, or ideas to make a manual process more efficient. Now could be the right time to do something great!

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Difference Between a Serialized Item and Unit Effective Item

Kathy Barthelt 0 142652 Article rating: No rating

A serialized item is not the same as a unit effective item. A serialized item has a serial number that is used to identify and track individual items, whereas a unit effectivity item has an effectivity unit that provides some information about the item's configuration. However, an item can be both serialized and unit effective.

Optimize Your Manufacturing Today!
 

Baan/LN Tip of the Week: Alternative Materials in BOMs:

Kathy Barthelt 0 442690 Article rating: No rating

Often, multiple items are interchangeable even when these are purchased from various vendors. You can use any of these items as material in a bill of material (BOM). If a shortage of a standard material is expected to delay a production order, LN can automatically select one of the alternative materials. You can define up to nine alternative materials for any material in a BOM.

The use of alternative materials has the following advantages:

  • LN can handle material shortages for some items without user intervention.
  • The use of alternative items can reduce the average inventory level.
First95969798100102103104Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for OPERATIONS: Copy Customized Product Structure to Standard Structure (tipcs2232m000)

This functionality allows you to copy the product structure of a customized item to a standard item.

Note: When a customized structure is copied to a standard structure, the Customized check box in the Items session (tcibd0501m000) is cleared.

Item Types:

  • Standard Items: Identified by a regular item code.

  • Segmented Items: Consist of a project code segment and an item base segment (i.e., the customized item’s item code). Segments are defined in the Item Code Segmentation session (tcibd0500m000).

Only components valid for the specified Effectivity Unit will be copied.

Copy Options:

  • Target Routing Code
    Enter the code of the standard routing to which the customized structure should be copied.

  • Copy Product Structure
    Choose whether to:

    • Copy the entire structure

    • Copy only the first level

    • Perform the copy interactively

  • Reference Date
    Only parts of the product structure valid on this date will be copied.

  • Copy E-Item Relationships
    If selected, related E-item records will be copied.

  • Copy All Components and Effectivity Statements
    If selected, unit effectivity is copied to the standard structure. You can specify the unit.
    Exceptions related to routings and operations (that meet date effectivity) are also copied.

  • Alternative Material
    If selected, alternative BOM components are included in the copy.

  • Use-Up Material
    If selected, use-up materials from BOM components are included.

  • New Item Codes for Existing Standard Components
    If selected, LN generates new item codes for existing standard components in the structure.

  • Approve Conversion Factors

    • Selected: LN copies and approves conversion factors for the target item.

    • Cleared: LN copies the factors, but approval must be done manually in the Conversion Factors session (tcibd0103m000).

  • Copy to Standard Item Configuration
    If selected, the customized or generic item product structure is copied to the specified standard item configuration.

​Important Note: This option is only enabled if the Use Standard Item for Configuration check box is selected in the Product Configuration Parameters session (tipcf0100m000).Copying is only possible if the product variant is not active in Order Management. Active supply orders linked to the product structure will lose association with sales orders/quotations when the structure is regenerated.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Rebuild History for Account Matching (tfgld1218m000)
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Authorization and Security - LN REST APIs
Print
5775 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories