Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Baan/LN Tip of the Week: Transaction Accounts – Commissions

Kathy Barthelt 0 77182 Article rating: No rating

In Baan IV, if a link with Financials exists for commissions and rebates, invoices are created directly in the Commission Control System (CMS) module and posted to Financials. As a result, users must specify the ledger accounts that are used for posting commissions and rebates in the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session.

In LN, the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session is removed from the Commission Control System (CMS) module, because invoices are no longer created directly in the Commission Control System module.

BPCS/LX Tip of the Week: Vendor Maintenance Security Option for Company or Program

Anthony Etzel 0 39573 Article rating: No rating

The Vendor Maintenance Security option is in the Purchasing System Parameters program(PUR820D). The purpose of this program is to provide an additional security option for VendorMaster Maintenance. To access this program, the user selects the Parameters Generation option from the System Functions menu, SYS500. The user can modify the Vendor Maintenance Security parameter from PUR820D-04 in the Purchasing System Parameters program.This feature provides an additional security parameter for Vendor Master Maintenance.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: 6 Powerful Steps to Win With Automation

Anthony Etzel 0 35864 Article rating: No rating

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.  

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: GRINYA Reconciliation – What Could Go Wrong?

Kathy Barthelt 0 78854 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan or LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

To ensure, it’s recommended that the Integrations Setup tables should be audited either through Baan/LN or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Purchase Order Receive All Processing

Anthony Etzel 0 29570 Article rating: No rating

With this enhancement, the Purchase Receipts screens are optionally shown with the quantity and weight fields populated with the open value on the purchase order.

Previously the user had tomanually enter the quantity received or, for a dynamic weight and measure items, the weightreceived for each line on the purchase order.

Now the screens are populated with the open valueand if the open value is the same as the value received, the user can simply accept the line.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: 4 Reasons You Need Timely & Accurate Data

Kathy Barthelt 0 75640 Article rating: No rating

Seems obvious – you want real time data and you want it to be accurate. Do you have the systems in place to allow for this?

Here are 4 reasons you need a data collection system:

  1. See the differences between actuals and standards
  2. Determine the source of project overruns
  3. Prevent mis-shipments to customers
  4. Avoid unnecessary reordering of parts

An automated data collection system will analyze your current data, allowing you to efficiently optimize your manufacturing and the benefits will be huge and far reaching.

Optimize Your Manufacturing Today!

Blonder Tongue Looks for Success on LX With Crossroads MES

Anthony Etzel 0 30824 Article rating: No rating

Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.

Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.  

Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.  
Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.  
Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements com

BPCS/LX Tip of the Week: Estimates Versus Actuals

Anthony Etzel 0 33177 Article rating: No rating

So, how many of you have updated the estimated cost of material and labor in your ERP system recently? ……Hmmmm. That’s what I thought.

Do you have any idea how accurate those numbers are? Are you making business decisions based on estimates that are completely inaccurate?

Consider switching from estimates to actuals. Furthermore, consider implementing an automated data collection system to make this easy. By collecting production and labor data real time, you can gain real insight into your business and you gain the ability to look at the profitability of individual jobs, projects and employees.

Optimize Your Manufacturing Today!

First8586878890929394Last

Tips:  LX | BPCS | M3

Anthony Etzel
/ Categories: Infor LX & BPCS Tips

BPCS/LX Tip of the Week: Understanding What Goes On – Out on the Factory Floor

Ok… so you want to know the status of a specific shop order that was released two days ago.

What do you do?

It’s a sure bet that you have a manager, supervisor, or planner who can walk the floor and find the order at whatever work center it happens to be at. He/she can then answer “what operations have been completed and how many were completed?” All this requires leg work, and of course, a fair amount of time.

Now, if you have setup your BPCS master files properly, and you report transaction activity, you should be able to get those shop order statuses much faster using the SFC300 Shop Order Inquiry Screen.

At your fingertips you can see:

  • Release date & due date
  • How many hours remain in total and at each operation
  • The quantity required, what was finished and the remaining quantity
  • What components (materials) have been issued

Pretty basic information, right? Are you getting what you need to know? If not, then you may want to reexamine how your BPCS files are setup and what transactions along with their frequency are captured.

Optimize Your Manufacturing Today!

Previous Article BPCS/LX Tip of the Week: Role-Based Security
Next Article BPCS/LX Tip of the Week: Inventory Transaction Post to G/L by Cost Type
Print
29351 Rate this article:
No rating

Contact

Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Contact author

x

Tips: LN | Baan

Categories