Baan/LN Tip of the Week: 6 Powerful Steps to Win With Automation:

Kathy Barthelt 0 73569 Article rating: No rating
  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.  
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice real-time data reporting to monitor efficiencies and identify problems as they occur.

Duncan – Out With the Old In With the New… MES

Anthony Etzel 0 19043 Article rating: No rating
Duncan Enterprises, Inc., a leading designer, manufacturer, and distributor of ceramics, arts and crafts, fabric dying and painting products, fashion arts, and home decor DIY products, has selected Crossroads MES to implement throughout all of their shop floor departments and work centers. Through this implementation, Duncan intends to replace their existing Code Soft label software and Shop 2000 Reports. In addition, they expect to eliminate manual tracking of performance measurements and labor. With Crossroads MES, all shop floor paperwork will be distributed in a paperless fashion and all shop floor activities and production receipts will be captured. In addition, real time shop floor status information will be available for reporting across the enterprise.

Baan/LN Tip of the Week: Transaction Accounts – Commissions

Kathy Barthelt 0 76794 Article rating: No rating

In Baan IV, if a link with Financials exists for commissions and rebates, invoices are created directly in the Commission Control System (CMS) module and posted to Financials. As a result, users must specify the ledger accounts that are used for posting commissions and rebates in the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session.

In LN, the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session is removed from the Commission Control System (CMS) module, because invoices are no longer created directly in the Commission Control System module.

BPCS/LX Tip of the Week: Vendor Maintenance Security Option for Company or Program

Anthony Etzel 0 39195 Article rating: No rating

The Vendor Maintenance Security option is in the Purchasing System Parameters program(PUR820D). The purpose of this program is to provide an additional security option for VendorMaster Maintenance. To access this program, the user selects the Parameters Generation option from the System Functions menu, SYS500. The user can modify the Vendor Maintenance Security parameter from PUR820D-04 in the Purchasing System Parameters program.This feature provides an additional security parameter for Vendor Master Maintenance.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: 6 Powerful Steps to Win With Automation

Anthony Etzel 0 35451 Article rating: No rating

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.  

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: GRINYA Reconciliation – What Could Go Wrong?

Kathy Barthelt 0 78537 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan or LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

To ensure, it’s recommended that the Integrations Setup tables should be audited either through Baan/LN or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Purchase Order Receive All Processing

Anthony Etzel 0 29173 Article rating: No rating

With this enhancement, the Purchase Receipts screens are optionally shown with the quantity and weight fields populated with the open value on the purchase order.

Previously the user had tomanually enter the quantity received or, for a dynamic weight and measure items, the weightreceived for each line on the purchase order.

Now the screens are populated with the open valueand if the open value is the same as the value received, the user can simply accept the line.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: 4 Reasons You Need Timely & Accurate Data

Kathy Barthelt 0 75254 Article rating: No rating

Seems obvious – you want real time data and you want it to be accurate. Do you have the systems in place to allow for this?

Here are 4 reasons you need a data collection system:

  1. See the differences between actuals and standards
  2. Determine the source of project overruns
  3. Prevent mis-shipments to customers
  4. Avoid unnecessary reordering of parts

An automated data collection system will analyze your current data, allowing you to efficiently optimize your manufacturing and the benefits will be huge and far reaching.

Optimize Your Manufacturing Today!

First8485868789919293Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Infor LN & Baan Finance Tip: MPS Planned vs. MRP Planned

What items should be MPS planned, and what items should be MRP planned…

Master Scheduled Items are those items that are finished goods, or service items, that receive their requirements either specifically from Independent demand, or both Dependent and Independent demand.

  • Independent Demand is demand that cannot be calculated from higher-level demand in the product structure, and therefore must be either a forecast or an actual customer order (Finished Goods or Service parts sold to customers).
  • Dependent demand is derived from higher-level demand in the product structure. Dependent demand includes components, raw materials, and sub-assemblies. (these are not normally Master Scheduled Items).
  • Service Parts may have both independent demand from forecast and/or customer orders, as well as dependent demand from higher-level demand if that item is also used in other sub-assemblies or products.
  • Cumulative Lead Time is a concept used in Master Production Scheduling (MPS) that combines the “fixed” lead time, and the “variable” lead time needed to produce the product. It is the longest path through a given Bill-of-material. Based on the MPS setup options, your ERP will calculate the cumulative lead time (also called “the Critical Path”) for you.


Infor LN does not differentiate between the two. It is simply Enterprise Planning EP with one set of planned orders. It's possible to set up items and generate orders at plan levels, but not necessary. In theory, you could make plan level 1 similar to MPS items.

Another way of defining independent demand in LN terms is that it is demand not related to other planned items. Dependent demand comes from related planned items above in the BOM structure.

COLT still exists in the purchase and manufactured planned items. It has non-critical and critical lead time based on components set as critical. Once calculated it can be used to update the order and planning horizons of a plan item.

Relevant Sessions:

In Baan IV
Maintain Item Data tiitem0101m000
Generate MPS timps3201m000
Maintain Master Production Schedule timps3101m000
Display Planned Inventory Movements by Item timrp1510m000
Display Planned MRP Purchase Orders timrp1521m000

In Baan V

Plan Item Data cprpd1500m000
Item Master Plan cprmp2101m000
Time-Phased Overview cprrp0520m000

In Infor LN

Item – Planning cprpd1100m000
Item Master Plan cprmp2101m000 (same as Master MPS above if used)

Contact us today to learn more:  800.762.2077 | solutions@crossroadsrmc.com

Previous Article Infor ERP Tip: 57% of Companies Have Experienced Some Type of Cyber Attack
Next Article Infor LN & Baan Tip: Company versus Site
Print
59925 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories