Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Baan/LN Tip: Credit Control Parameters (ACR Parameters)

Kathy Barthelt 0 82507 Article rating: 5.0

In the Credit Control Parameters, you can indicate if the same letter will be sent for reminding and action taken if amounts are zero or negative. The reminder letters work in conjunction with overdue sales invoices and the “Reminder Diary Margin.” When an invoice has passed its due date plus a certain margin of days, LN generates a reminder advice for the invoice. 

Crossroads Welcomes Ridewell Corporation – MES for Infor LX

Anthony Etzel 0 27817 Article rating: 5.0

Crossroads RMC welcomes Ridewell Corporation as our newest client having selected Crossroads MES (Manufacturing Execution System) for their shop floor automation with integration to Infor LX. 

Ridewell engineers and manufactures air-ride, rubber-ride, steel spring and mechanical suspension systems for the truck, trailer, RV and bus industries. The company has served the transportation industry since 1967 and holds many active patents for exclusive features that provide for low maintenance and superior ride quality.

Ridewell’s objective was to eliminate shop floor paperwork and manual processes, obtain real time performance metrics, and achieve greater visibility over manufacturing operations. After carefully conducting their due diligence they selected Crossroads MES to address these challenges.

Crossroads Manufacturing Execution System connects your manufacturing plant to the rest of your enterprise by using touch screen PCs on the shop floor. Powered by IBM I Power Systems, Crossroads MES fills the gap that exists between your ERP system and your lean manufacturing initiatives by modernizing and transforming the ERP experience. It delivers paperless shop packets to your entire workforce, captures live manufacturing data, and then delivers real-time status to your Tablet or PC.

Key Features include:

  • Paperless Shop Floor                               
  • Labor and Machine Time
  • Production Reporting
  • Material Issue
  • Scrap Reporting
  • Scheduling
  • Capacity Load Balancing
  • Label Integration
  • Dashboard Analytics                    

Crossroads MES provides information that helps manufacturing decision makers understand how current conditions on the plant floor can be optimized to improve production output.

Crossroads RMC is proud to have Ridewell Corporation as a client and we look forward to working together to support their company growth and success.

BPCS/LX Tip of the Week: Shelf Life Days and Retest Days

Anthony Etzel 0 57556 Article rating: 5.0

This feature provides the ability to enter information in the shelf life days and retest days fields for non-QMS lot controlled items, even when the QMS product is installed. The purpose of this enhancement is to allow the user to enter information for non-QMS lot controlled items even when QMS is activated in Parameters Generation, SYS800D. In previous versions, when QMS was activated, the Shelf Life Days and Retest Days fields in Facility Planning Maintenance (MRP140) and Item Master Maintenance (INV100) were not maintainable for non-QMS lot controlled items. The user is now able to change non-QMS lot controlled items even when a QMS product is installed.

Baan & LN Integration News: Playing Telephone Can Get You In Trouble

Kathy Barthelt 0 35287 Article rating: 5.0

Somehow information must be relayed from one person to another, and the “connection” (as it turns out) is pretty manual, and error prone.

How about moving into the 21st century and eliminate the manual effort. How about automating your integrations? Learn About Crossroads RMC Consulting

We have tied Baan and Infor LN to:

  • Warranty systems
  • CRM systems
  • Web portals
  • Automated batch picking systems, and so much more!

Contact me to find out how we can automate the communication between your systems, so you don’t have to worry about what got lost in translation.

Baan/LN Tip: New Mapping Scheme

Kathy Barthelt 0 83947 Article rating: 5.0
After a new mapping scheme is copied from an existing one, it is possible to check transactions in a simulation mode, before activating the new scheme. However, before the simulation can take place, the new mapping scheme needs to have completed the “Check Mapping Scheme” step. When the check is completed, a transaction can be simulated by highlighting it and from the Specific menu, selecting “Map with Specific Mapping Scheme.” Any errors can be corrected without having to activate the new mapping scheme.

Anthony Etzel- Featured Speaker at inPower 2019

Anthony Etzel 0 29484 Article rating: 4.5

Infor IDF is replacing green screens for inquiries and release LX 8.4 for file maintenance. This session will show you how to use IDF over your non-LX file. 
 

Many Companies have IDF and are not effectively using it. This session will cover:

  • Building a business object (Intergrator) 
    • How to create a logical expression
    • How to make a field a maintainable field with IDF
  • Views 
    • How to create custom views
    • How to navigate in IDF and create search subsets

Pushing Forward In the Face of Adversity. Soundview recently suffered a major loss when fire struck on January 30, 2019.

Crossroads RMC 0 23191 Article rating: 5.0

Soundview Paper lost their main building when disaster struck. This building housed offices, their computer center and part of their manufacturing facility. The loss including hardware, networks, system data backups, etc. Crossroads RMC was contacted immediately to assist in the recovery of their BPCS V6 system. With limited backups and a full team effort, Crossroads RMC assisted in the acquisition of new hardware and are currently in the midst of helping to bring their system back to life. Soundview has secured support from various partners to make all this happen, and we are privileged to be part of the team. A lot of work has been done so far, but we have a long road ahead. Users will soon regain access by the end of this week,  and as required, Crossroads RMC will provide the necessary consulting support from our LX team to get Soundview back up and running. We are communicating with them daily, as we work thru this process.

BPCS/LX Tip of the Week: Facility Period Close

Anthony Etzel 0 59156 Article rating: No rating

The Facility Period Close process, as introduced in Infor LX 8.3.4, was designed to function interactively. 

The expectation was that clients with a continuous or 24-hour worldwide operation in multiple facilities would submit the Period End Close jobs for each facility as daily operations ceased or shifts ended for each facility. This process was designed to function interactively so that validations of users performing transactions that conflicted with period end processing, and resulting messages, were immediately sent to the period end user. 

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process. For example, a user has a 24-hour operation in facilities around the world, but a centralized IT operation. With this enhancement the user can submit the individual facilities to be closed to a batch process that can be managed by a scheduler, automatically releasing each facility to be closed at a predetermined time.

First7980818284868788Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Performance improvement by setting the First Free Number Cache (tcmcs0651m000)

Many transactions in all kinds of modules use order numbers or serial numbers. These order numbers are most often automatically generated. In the Number Groups (tcmcs0151m000) session you can define groups of order numbers used for dedicated areas. A Number Group is a group of the first free number series that you can assign to a specific use. All the numbers that Infor LN generates in the number groups that are dedicated to the same purpose are unique.

All the first free numbers are stored in the table tcmcs050.

As many different processes can request a free number from the number groups, we often see delays in the performance, due to locking on the first free number records. This locking issue can have a severe impact on the performance of huge batch-type transactions, but also on the performance perceived by individual users in many areas in LN.

For example:

  • Processing warehouse transactions. Single or in-batch
  • Completing / closing orders
  • Backflushing of production orders
  • Generate Order Planning
  • Cost calculation and warehouse revaluation


How this performance can be improved?

Resolution

In the Number Groups (tcmcs0151m000) session you can open the details of a specific Number Group (tcmcs0651m000) or start the session stand-alone.

In the Number Group, you define the Series with the related First Free Numbers. Per Serie in the First Free Number, you have the option to define the Cache Size.

This Cache size is defaulted on a value of 0 (zero). A cache size of zero means No Cache. How does the First Free Number caching works:

  • When the Cache Size is zero: With this setting a process requests a Free Number from the Serie and the first free number is issued to the process. But the first free number record is not updated yet. At the moment the requesting process is finished, without errors, it reports back that the number is used and the first free number record is updated. All the time that the process is working on the transactions the first free number record is locked. If another process is requesting a free number from the same series, it must wait (retries) until the record is updated and released by the previous process. This is the locking which is causing delays in the other processes.  
  • Setting the Cache Size to a higher value then zero activates the caching. When the Cache Size is set to 1 or higher, the requested free number is sent to the requesting process, the first free number is updated, with the number as defined in the Cache size, and the record is saved. It does not wait until the requesting process has reported back that is finished, with or without errors. In this way the record is immediately released and no locking will occur. If another process is requesting a free number, it does not need to wait until the free number record is released by the earlier process. If the process is ended with errors and therefor the number is not used, this number from the series is lost. This can result in gaps in the numbering. When the cache size is greater than 1, for example it is set to 5, the requesting process receives 5 free numbers. Even if it only needs less than 5. In this way the process only has to request for a new free number after it has used the first 5 numbers from the cache. This will also speedup the process in case of large batch transactions. For ‘warehouse integration users’, like for example Factory Track or WMS users we advise to set the cache size to 5.  

Note that financial documents are not based on number group series / first free numbers. Instead they are based on transaction type series, for which the caching functionality does not exist. Financial documents, like sales invoices, bank transactions, are thus not cached.

The caching is especially important to improve the performance of all logistical processes.

It is strongly recommended (mandatory) to set the Cache Size for all Number Groups to a minimum of 1.

Previous Article Infor LX / BPCS & Infor LN / Baan Tip: A New Wave of Cyber Attacks: Five Actions to Take Now
Next Article ​Infor LN & Baan Tip: Determining What Data to Archive or Delete
Print
30110 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories