Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LX & BPCS Tip of the Week: Pre-Assigned Lot Numbers – LX

Anthony Etzel 0 65707 Article rating: 5.0

In addition to assigning lot numbers in Shop Order Entry/Maintenance (SFC500) after the shop orders have been released, users can now pre-assign lot numbers during the Multi-level Shop Order Release process (SFC530) and the Multi-Level Backflush process (LMP600) for sub-assemblies that are lot controlled items. The user has the choice of using the parent lot ID, the next sequential generated lot ID, or not pre-assigning lot IDs. Multiple items per lot must be installed to use the parent lot number option.

Infor's Support Schedule for Infor LN & Baan

How Crossroads RMC can help

Kathy Barthelt 0 125174 Article rating: 5.0

Infor recently announced their support schedule for all versions of Infor LN & Baan.

Not sure what your company’s strategy should be moving forward?

Let us help you figure out the best path forward for YOUR company. Our goal is to put you on a path that ensures that you are supported and that your needs are met today and in the future without breaking the bank. Visit our Services page to learn more>

Infor LN & Baan Tip of the Week: Quantity change during shipment planning – 10.7

Kathy Barthelt 0 91198 Article rating: 5.0

Customers who use the Projected Shipments concept, and with that the Shipment Planning Workbench, require more flexibility in modifying outbound order lines before projected shipments are generated. The most important requirement is the option to change item quantities, which is a typical instrument to react on specific circumstances such as truck size and inventory situation. A Shipment Planning tab has been added to the Outbound Order Lines to enable users to perform shipment planning activities in terms of quantities and dates.

Cremer S.A. partners with Infor Consulting Services

Customer Innovation Study

Frank Petrasio 0 48146 Article rating: 5.0

Cremer S.A. partners with Infor Consulting Services to replace incumbent ERPs in acquired businesses with Infor LX.

"Infor LX provides meticulous detail into the real costs of our business and can be implemented rapidly with no investment in customizations. In short, Infor LX fits our business and provides us with the highest return on investment.” Marcelo Jorge Fernandez Operations Director & CIO, Cremer S.A.

Want to learn more about this LX success story? Click Here to Read Full Customer Innovation Study 

Contact Frank Petrasio at Crossroads RMC to find out how your company could be the next LX success story!

Learn More about Crossroads RMC's Services>

Infor LX & BPCS Tip of the Week: 6 Powerful Steps to Win with Automation

George Moroses 0 68529 Article rating: 5.0
  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Amerequip Goes Live With OTTO On-Time Orders

Anthony Etzel 0 34107 Article rating: 5.0

Crossroads RMC welcomes Amerequip as our newest client after successfully going live with OTTO, On-Time Orders.

Amerequip, with corporate headquarters in Kiel, Wisconsin, is a leading designer and manufacturer of accessories and attachments for the construction, utility, and industrial equipment, lawn and turf-care equipment, and related products sold in global markets served by their OEM partner customers.

Amerequip’s objective was to improve on time customer order shipments, reduce expediting, and cut down on the time their knowledge workers were spending digging for information. After carefully conducting their due diligence they chose OTTO to address these challenges.

OTTO helps manufacturing plants consistently meet customer commitments by performing predictive analysis to help prevent surprises and allow for early detection and resolution of potential issues. OTTO improves effectiveness of knowledge workers by reducing “data mining” required to answer customer order status questions, and improves the flow of material through the plant, as a result, reduce shortages and improve on-time customer order shipments. OTTO previously won the prestigious APICS Innovation Award of Excellence”.

We are proud to have Amerequip as our client and look forward to being a strategic partner and support their company growth and success.

First7475767779818283Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip of the Week: The Production Bill of Material – 10.7

The production bill of material is globally specified at the company level. It can be used as a source for the definition of the local material lists, such as:

  • The production model in the repetitive module.
  • The production model in the job shop module.
  • The subcontracting model in the subcontracting module.

The production bill of material can be generated through the engineering bill of material. The new production bill of material differs from the old bill of material:

  • It has a header and a status.
  • It is always revision controlled.
  • The effective dates have been moved from the material lines to the header.
  • The BOM quantity has been moved from item production data to the header.
  • The use up has been moved from alternatives to the material line.
  • The material line excludes logistic data (no warehouse nor routing operation).

The production bill of material is not mandatory.

Production bill of material revisions:
The production bill of material is revision controlled. The objective of the revision is to control the changes to the bill of material over time.

The P-bom includes this revision-related data:

  • Revision number
  • Effective date and Expiry date
  • Status (New, Approved, Expired)
  • Creation date and Created by: user
  • Approval date and Approved by: user
  • Expiry date and Expired by: user
  • Source information
Previous Article Infor LN & Baan Tip of the Week: Job Shop by Site Changes in LN 10.7
Next Article Infor LN & Baan Tip of the Week: Standalone Sessions in LN 10.7
Print
187924 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories