Baan/LN Tip of the Week: Letter of Credit

Kathy Barthelt 0 65578 Article rating: No rating

In LN 10.6 you can now link Sales Order (lines), Purchase Order (lines) and Contract (lines) to a Letter of Credit and process the same in accordance with the conditions stated in the linked Letter of Credit.

In addition, LN can be setup in a way that enables employees, with sufficient authorization, to approve the different types of Letters of Credit and change its status.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: IDF - Enterprise Items Application

Anthony Etzel 0 39888 Article rating: No rating

The Enterprise Item application in the Infor Development Framework for Infor LX supports display of all information relevant to an item. This includes numerous aspects of Inventory, including facility, warehouse, location, lot, and container data.

With the Enterprise Items application, you can customize the data displayed to include more or less data than is currently displayed using the standard Infor LX programs. You can access this information through a single point of entry, so there is no need to switch from one program to another to see all the data you require. This ability to customize will help streamline your decisions by allowing you to display information that is specific to your needs.

The various Enterprise Item application cards provide listings, maintenance type information, and current information that you could previously only access by running multiple standard Infor LX programs, such as Material Status Inquiry (INV300), Bill of Material Inquiry (BOM300), and Routing Inquiry (SFC100).

Optimize Your Manufacturing Today!

May 23, 2018 - Lunch & Learn Webinar for BPCS & LX! - It’s Time to Understand Time

Anthony Etzel 0 18847 Article rating: No rating

 


Lunch & Learn Webinar for BPCS & LX! 
-  It’s Time to Understand Time -

Machine Time  |  Down Time  |  Crew Time  |  Direct Time  |  Indirect Time

So many ways to break down time!
Have you taken the time to understand what these
breakdowns mean and how they impact your business?

Watch the recorded webinar and learn about a fast and efficient
way to capture time from the factory floor.
 

             Click Here to Watch Video (34:41) 

 

 

 

 

Baan/LN Tip of the Week: Get Real!

Kathy Barthelt 0 65609 Article rating: No rating

You’ve got an ERP system, so everything should be real time and everyone should have access to information in real time, right? RIGHT?

Why not? Why are there spreadsheets, and separate Access databases off to the side?

Data loses value over time, so why not give everyone up to date, accurate information all the time? Take a look at those silos of information and see how you can eliminate them. Your business will benefit greatly as a result.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Purchase Order Receive All Processing LX/8.3.5

Anthony Etzel 0 38363 Article rating: No rating

This enhancement to the Purchase Receipts screens; optionally shown with the quantity and weight fields populated with the open value on the purchase order. Previously the user had to manually enter the quantity received or, for a dynamic weight and measure items, the weight received for each line on the purchase order. Now the screens are populated with the open value and if the open value is the same as the value received, the user can simply accept the line.

The Receive All field on the PUR550D1-01 screen determines whether the receipt lines are populated with the open value. A system parameter controls the Receive All default value but the default value can be overridden. If the user specifies 1=Yes in the Receive All field then the PUR550D2-02 screen displays the open quantity or weight for each line. The user can accept the open value for each line. 

Optimize Your Manufacturing Today!

Anthony Etzel – Featured Speaker at The New England Midrange Users Group Meeting (NEMUG) on May 16, 2018

Anthony Etzel 0 29922 Article rating: No rating

Anthony Etzel, a Solution Executive with Crossroads RMC, will speak at the NEMUG meeting in North Attleboro, MA on May 16th 2018. He will present the History of Shop Floor Control and also talk about current shop floor management technology including Crossroads MES and Analytics Dashboards.


https://www.nemug.com/

BPCS/LX Tip of the Week: Gain Efficiency & Save Money – Evaluate Your Production Lines

Anthony Etzel 0 35959 Article rating: No rating

When is the last time you took a hard look at your production lines?

  • How are we moving product through our facility?
  • Do we have work instructions/drawings available where needed?
  • Do we have frequently used inventory available at the line?
  • Where are the bottlenecks?
  • Are processes automated, where possible?

Taking a hard look at your processes and procedures may reveal some interesting results. 

Don’t assume that everyone is doing things the same way. Some may be superstars, and others may need some mentoring. Some processes may be outdated and costing you time and money, while others are extremely efficient. One area of the business may benefit from how others operate. Take the time to review and analyze your findings. Your company may benefit greatly as a result.

Optimize Your Manufacturing Today!

First7374757678808182Last

Tips:  LX | BPCS | M3

Item Facility Master has a new attribute to define the override inspection days lead time CICP.ICINSD.

  • When an item facility has a defined override inspection days lead time, that value will be used instead of the system parameter inspection days lead time.

MRP exception report, MRP200B
Purchase planning report, PUR285B
Purchase order / Requisition maintenance, PUR500D3
Purchase order consolidation / release, PUR640B1
Vendor splits, PUR653B

This enhancement improved the subfile utilized in MRP320D Master Schedule Detail Inquiry -SCR001 by expanding the subfile with data rather than clearing the subfile as user pages. This change provides full support for the WebTop 4.8 Grid decorator.

This enhancement updated the approach used to populate the subfile to allow a deployed Webtop Grid to function correctly. There is no visible or user-impacted change to the way the program functions.

This enhancement provides improved functionality and full support of a Webtop grid applied to the subfile.

Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE
Ledger Account Blocked Error
When attempting to post to a ledger account, users may occasionally encounter an error indicating that the ledger account is blocked. To resolve this issue, navigate to the Chart of Accounts session (tfgld0508m000) and select the Miscellaneous tab. Once there, review the Blocking field. The available settings are:

  1. Free
  2. Blocked for manual input (integration transactions and other automatic transactions can be posted with this setting)
  3. Blocked for all purposes.

OPERATIONS
Absorbing Cost Items into Projects
To absorb the cost of cost items into specific projects, you'll need to handle them as customized items. However, cost items cannot directly be defined as customized items. Customized items must be physical, either manufactured or purchased.

That said, it's still possible to absorb cost items into a project, although indirectly. Here's how:

  1. Set Up Ledger Account: First, create a new ledger account in session tfgld0508m000 and set the type to "PCS" (project) in the operations management integrations. This account will be used for matching and approving purchase orders for cost items.

  2. Create and Activate Projects: Ensure that the necessary projects are created and set to active status.

  3. Purchasing Cost Items:

    • If needed, create the cost items.
    • Create a purchase order for the cost items without referencing a project number.
  4. Matching PO to Costs:

    • When matching the purchase orders in session tfacp2107m000, select "Add Costs" from the specific menu on the toolbar (you'll need to be in the matching details to access this).
    • This will open session tfacp1133s000, where you will enter the previously specified ledger account number.
    • Once done, the "PCS Transactions" option on the toolbar becomes available. Selecting this brings up session tipcs3140m000 (General Actual Project Costs).
       
  5. Disbursing Costs to Projects: In session tipcs3140m000, the PO costs for the cost items can be disbursed to any open and active project.

Since these are cost items, they won't go into stock. The key is ensuring that the cost disbursement ("Add Costs") is correctly linked to the appropriate project, giving users visibility of the cost items as general project costs.


TECHNOLOGY
Adding a Timestamp to LN Standard Tables
Table Timestamp Definitions (ttadv4136m000)

Use this session to define timestamps for Infor LN tables. A timestamp is an additional column that stores the date and time of the last change for each record.

Timestamps are utilized by features like the extraction logic of CPM Enterprise Analytics. They enable CPM to perform incremental data extractions. For example, CPM can use the timestamps to extract records that were changed during the last week in a weekly extraction process.

To Create Timestamps:

  1. Enter the Tables: In this session, specify the tables for which you want to define timestamps.

  2. Convert and Reconfigure: Run the Convert to Runtime Data Dictionary (ttadv5215m000) session to convert the table definitions to the runtime data dictionary and reconfigure the tables.

  3. Restart Session: Log off and log back on to apply the changes.

IMPORTANT!
To avoid issues with locked tables, ensure that all users have logged off before starting the reconfiguration.

For more information, refer to the online help of the Convert to Runtime Data Dictionary (ttadv5215m000) session.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Ledger Account Blocked Error
Next Article Infor LN & Baan Tips & Tricks for OPERATIONS: Absorbing Cost Items into Projects
Print
16915 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories