Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Nazdaq has released Version 3.0 of B2Win Suite

Partner News

Kathy Barthelt 0 37718 Article rating: No rating

New Release of B2Win Suite: Format customer reports, email documents to your suppliers and customers, and more! 

New features – B2Win Suite - You are no longer limited to the data that comes from your canned reports! You can now add new columns to your already existing reports in Excel, based on SQL commands that bring additional data from any database (ERP or other), based on values from the report.

Existing Nazdaq customers should contact us to learn how we can convert your software to the latest and greatest Nazdaq product suite!

For more information: watch our webinar:

Webinar Recording: 48:18

Crossroads is proud to work with Johnson Crushers International on their LN re-implementation to 10.6

Kathy Barthelt 0 19166 Article rating: 5.0

Johnson Crushers International (JCI), a global leader in engineering and manufacturing full lines of cone crushers, horizontal and incline vibrating screens and track-mounted, portable and stationary crushing and screening plants, has selected Crossroads RMC to help them re-implement Infor LN on 10.6.  JCI’s main objectives with this project are to support their continued growth, align and standardize their business processes, and enable a continuous improvement effort to drive additional value to the business. Go live is expected to occur in early Q1 of 2020.

Baan/LN Tip of the Week: Warehouse Material Movement / Problems With the Inventory Structure Table (whinr150)

Kathy Barthelt 0 77427 Article rating: 5.0

This has come up as an issue during various stages of warehouse material movements – transfers, outbounds, shipments. We have seen it right up to 10.4. The inventory structure table (whinr150) becomes a problem. The error points to that table, but users are lost as to how to fix it.

In the session Units by Unit Set many companies let the field Storage default to Yes. If the UOM is not intended to be used in inventory then that setting should be No. 

If an item is purchased in UOM different from the inventory unit and the setting is Yes then LN adds a record in that UOM to the inventory structure table. It is that record that causes problem later.

The session has an option to change the value of the storage field. Specific > Convert Use for Storage. This option works both ways and will correct all inventory in the UOM range. 

Should a user receive an error that references inventory structure table then the solution is to check that session to see if an odd UOM exists in it. If so use the Convert Use for Storage to correct the problem.

Baan/LN Tip: Disabling Unused Functionality in LN

Kathy Barthelt 0 77981 Article rating: No rating

If functionality such as Commissions, Rebates, or Contracts are enabled in the parameters, LN checks this functionality during transactions, even if you did not specify anything for these concepts. Therefore, if you do not use certain functionality within LN, to improve performance, disable the corresponding parameter.

Optimize Your Manufacturing Today!

Crossroads RMC named as Avalara's Certified Integration Partner for Infor LX

Anthony Etzel 0 28570 Article rating: 5.0

Avalara Announces 41 Newly-Certified Integrations Into Business Application


December 20, 2018 05:00 AM Eastern Standard Time

SEATTLE--()--Avalara, Inc. (NYSE:AVLR), a leading provider of cloud-based tax compliance automation for businesses of all sizes, today announced the release of 41 newly-certified integrations with accounting, ERP, ecommerce, point-of-sale, mobile commerce, and CRM software applications.

Avalara has been a partner-centric company since its founding in 2004, with a keen focus on integrating with technology solutions already in use by existing and future customers. Avalara Certified integration partners have met criteria developed by Avalara to guarantee each integration’s performance and reliability. Certified integrations are built to ensure customers enjoy a fast, reliable, and easy process for embedding Avalara’s automated tax management into existing systems.

Additionally, these integrations enable customers of Avalara partner solutions to benefit from Avalara’s real-time calculation of applicable taxes, fees, and surcharges for billing line items. Avalara software reduces the tedium and complexity of determining taxes for millions of products and services across the U.S., Canada, Europe, and other international jurisdictions, giving customers more time to focus on driving their own business success.

The latest group of Avalara Certified integrations includes:

  • Infor LX (by Crossroads RMC) is an ERP solution used primarily by manufacturers.

Baan & LN Tip of the Week: Get Real!

Kathy Barthelt 0 79501 Article rating: No rating

You’ve got an ERP system, so everything should be real-time and everyone should have access to information in real-time, right? RIGHT?!

Why not? Why are there spreadsheets, and separate Access databases off to the side?

Data loses value over time, so why not give everyone up to date, accurate information all the time? Take a look at those silos of information and see how you can eliminate them. Your business will benefit greatly as a result.

Optimize Your Manufacturing Today!

BPCS & LX Tip of the Week: Get Real!

Anthony Etzel 0 54884 Article rating: No rating

You’ve got an ERP system, so everything should be real-time and everyone should have access to information in real-time, right? RIGHT?!

Why not? Why are there spreadsheets, and separate Access databases off to the side?

Data loses value over time, so why not give everyone up to date, accurate information all the time? Take a look at those silos of information and see how you can eliminate them. Your business will benefit greatly as a result.

Optimize Your Manufacturing Today!

Baan & LN Tip of the Week: Simplify & Save Money – Evaluate Your Production Lines

Kathy Barthelt 0 74614 Article rating: No rating

When is the last time you took a hard look at your production lines?

  • How are you moving product through the facility?
  • Do you have work instructions / drawings available where needed?
  • Do you have frequently used inventory available at the line?
  • Where are the bottlenecks?
  • Are your processes simplified?

Taking a hard look at your processes and procedures may reveal some interesting results. Don’t assume that everyone is doing things the same way. Some may be superstars, and others may need some mentoring. Some processes may be outdated and costing you time and money, while others are extremely efficient. One area of the business may benefit from how others operate. Take the time to review and analyze your findings. Your company may benefit greatly as a result.

Optimize Your Manufacturing Today!

First7273747577798081Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE
Ledger Account Blocked Error
When attempting to post to a ledger account, users may occasionally encounter an error indicating that the ledger account is blocked. To resolve this issue, navigate to the Chart of Accounts session (tfgld0508m000) and select the Miscellaneous tab. Once there, review the Blocking field. The available settings are:

  1. Free
  2. Blocked for manual input (integration transactions and other automatic transactions can be posted with this setting)
  3. Blocked for all purposes.

OPERATIONS
Absorbing Cost Items into Projects
To absorb the cost of cost items into specific projects, you'll need to handle them as customized items. However, cost items cannot directly be defined as customized items. Customized items must be physical, either manufactured or purchased.

That said, it's still possible to absorb cost items into a project, although indirectly. Here's how:

  1. Set Up Ledger Account: First, create a new ledger account in session tfgld0508m000 and set the type to "PCS" (project) in the operations management integrations. This account will be used for matching and approving purchase orders for cost items.

  2. Create and Activate Projects: Ensure that the necessary projects are created and set to active status.

  3. Purchasing Cost Items:

    • If needed, create the cost items.
    • Create a purchase order for the cost items without referencing a project number.
  4. Matching PO to Costs:

    • When matching the purchase orders in session tfacp2107m000, select "Add Costs" from the specific menu on the toolbar (you'll need to be in the matching details to access this).
    • This will open session tfacp1133s000, where you will enter the previously specified ledger account number.
    • Once done, the "PCS Transactions" option on the toolbar becomes available. Selecting this brings up session tipcs3140m000 (General Actual Project Costs).
       
  5. Disbursing Costs to Projects: In session tipcs3140m000, the PO costs for the cost items can be disbursed to any open and active project.

Since these are cost items, they won't go into stock. The key is ensuring that the cost disbursement ("Add Costs") is correctly linked to the appropriate project, giving users visibility of the cost items as general project costs.


TECHNOLOGY
Adding a Timestamp to LN Standard Tables
Table Timestamp Definitions (ttadv4136m000)

Use this session to define timestamps for Infor LN tables. A timestamp is an additional column that stores the date and time of the last change for each record.

Timestamps are utilized by features like the extraction logic of CPM Enterprise Analytics. They enable CPM to perform incremental data extractions. For example, CPM can use the timestamps to extract records that were changed during the last week in a weekly extraction process.

To Create Timestamps:

  1. Enter the Tables: In this session, specify the tables for which you want to define timestamps.

  2. Convert and Reconfigure: Run the Convert to Runtime Data Dictionary (ttadv5215m000) session to convert the table definitions to the runtime data dictionary and reconfigure the tables.

  3. Restart Session: Log off and log back on to apply the changes.

IMPORTANT!
To avoid issues with locked tables, ensure that all users have logged off before starting the reconfiguration.

For more information, refer to the online help of the Convert to Runtime Data Dictionary (ttadv5215m000) session.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Ledger Account Blocked Error
Next Article Infor LN & Baan Tips & Tricks for OPERATIONS: Absorbing Cost Items into Projects
Print
20675 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories