Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Does your existing data collection equipment and barcode label printers need some love and attention?

Kathy Barthelt 0 33160 Article rating: 5.0

Crossroads RMC knows that new equipment is not something that everyone can or wants to include in their budget. Sometimes you need to make due with what you have. We are proud to partner with a local company that repairs existing data collection equipment, and sells refurbished devices as well.

Want to bring a little life back into your equipment and extend their use? Contact us today to see if your data collection equipment can be given new life! 

Kathy Barthelt – VP Sales
Crossroads RMC
Phone: 1.630.955.1310, x113 | Cell: 1.630.408.7759
kbarthelt@crossroadsrmc.com

Do you have spreadsheets and separate databases that may or may not be tied to Baan/LN?

Kathy Barthelt 0 36575 Article rating: 5.0

Do you have spreadsheets and separate databases that you’re keeping on the side that may or may not be tied to Baan/LN?

-Do you wish they were integrated so that you didn’t have to manually go into each system to report on the data or look up information? 
-Are you running into problems because you don’t have exposure to all of the data that is critical to running your business?

Crossroads RMC has a team of integration experts who can create the integration you’ve been dreaming about… AND we have developed RMCconnector to allow for quick and easy translation data from your front end system into a format accepted by your back end ERP. 

Learn More

Baan/LN Tip: Saving Space in Your General Ledger

Kathy Barthelt 0 77505 Article rating: 5.0

Compressing Integration Transactions

One way to save space in your general ledger is to compress integration transactions. The transactions are combined into one ledger account number. However, the detail is still available in the integration transactions sessions.

The compression is seen after the transactions are finalized. 

Compression is established in the mapping scheme by checking the box under the columns “Compression of Debit/Credit Transactions". This can only be done in a mapping scheme that is not activated. 

BPCS/LX Tip: Backup and Save options

Anthony Etzel 0 55415 Article rating: No rating

Users are no longer limited to backing up or saving files to a tape or diskette.They can now use a Save File (SAVF) to save data and objects. LX programs that perform saves and/or backups were modernized to add a new SAVF option.  

There were numerous places in LX where users are prompted to save a file or library. These screens have options for tape or diskette. Diskette refers to the old 8” diskettes used on System/38. These devices are outdated and virtually obsolete. The current means of saving objects on the IBM i, is through the use of a Save File (SAVF). This compresses the data into a single object that can be saved and is easily transferred between systems.

These objects were modified and/or created for this enhancement:

  • Backup Simulation (FOR630C, FOR630D, FOR630FM, FOR640HT, and FOR630HT)
  • Month End Close (INV903D, INV903FM, INV901C, and INV903HT)
  • Purge YTH/Restore Archived Lots (INV912C, INV912D, INV912DHT, and INV912FM)
  • Purge and Save ITH records (INV932C, INV932D, INV932FM, and INV932HT)
  • Labor Ticket Save (SFC905D, SFC905FM, SFC901C, and SFC905HT)
  • Backup Infor LX Files (SYS700C, SYS700D, SYS700FM, and SYS700HT)
  • Backup Infor LX Programs (SYS710C, SYS710D, SYS710FM, and SYS710HT)
  • Backup Infor LX Source (SYS740C, SYS740D, SYS740FM, and SYS740HT)
  • Save File Name Selection (SYS912D, SYS912FM, and SYS912HT)


Benefit

Use the Backup Simulation to copy a simulation file to a SAVF or tape. Users may want to do this to transfer simulation data from one system to another, from site to site, or to save the data before permanently deleting it from the system.

Navistar goes global with Crossroads RMC!

Kathy Barthelt 0 26628 Article rating: 4.7

Navistar, a leading manufacturer of commercial trucks, buses, defense vehicles, and engines, has selected Crossroads RMC’s data collection middleware to use for their global data collection solution. Implementation began in late 2018 with Navistar’s Illinois facility and will be completed in all other divisions by the end of 2019.

Don’t Let Malware Destroy Your ERP System!

Crossroads RMC 0 23544 Article rating: 5.0

We just got a report that another one of our customers has been affected by malware. In this case it wiped out their ERP server. We are working with them to restore it an get everything up and running again. It is highly likely that this got into their network by an email attachment. This seemed like a good opportunity to remind everyone to be extremely careful with email attachments. Even if it appears to be from someone that you know, email “From” addresses can be forged.

Best practice is to save the attachment to a folder, and run a virus scan before opening or viewing the file.

Baan/LN Tip: Credit Control Parameters (ACR Parameters)

Kathy Barthelt 0 80022 Article rating: 5.0

In the Credit Control Parameters, you can indicate if the same letter will be sent for reminding and action taken if amounts are zero or negative. The reminder letters work in conjunction with overdue sales invoices and the “Reminder Diary Margin.” When an invoice has passed its due date plus a certain margin of days, LN generates a reminder advice for the invoice. 

Crossroads Welcomes Ridewell Corporation – MES for Infor LX

Anthony Etzel 0 27026 Article rating: 5.0

Crossroads RMC welcomes Ridewell Corporation as our newest client having selected Crossroads MES (Manufacturing Execution System) for their shop floor automation with integration to Infor LX. 

Ridewell engineers and manufactures air-ride, rubber-ride, steel spring and mechanical suspension systems for the truck, trailer, RV and bus industries. The company has served the transportation industry since 1967 and holds many active patents for exclusive features that provide for low maintenance and superior ride quality.

Ridewell’s objective was to eliminate shop floor paperwork and manual processes, obtain real time performance metrics, and achieve greater visibility over manufacturing operations. After carefully conducting their due diligence they selected Crossroads MES to address these challenges.

Crossroads Manufacturing Execution System connects your manufacturing plant to the rest of your enterprise by using touch screen PCs on the shop floor. Powered by IBM I Power Systems, Crossroads MES fills the gap that exists between your ERP system and your lean manufacturing initiatives by modernizing and transforming the ERP experience. It delivers paperless shop packets to your entire workforce, captures live manufacturing data, and then delivers real-time status to your Tablet or PC.

Key Features include:

  • Paperless Shop Floor                               
  • Labor and Machine Time
  • Production Reporting
  • Material Issue
  • Scrap Reporting
  • Scheduling
  • Capacity Load Balancing
  • Label Integration
  • Dashboard Analytics                    

Crossroads MES provides information that helps manufacturing decision makers understand how current conditions on the plant floor can be optimized to improve production output.

Crossroads RMC is proud to have Ridewell Corporation as a client and we look forward to working together to support their company growth and success.

First7071727375777879Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Defining “Unavailability” in Infor LN

This topic describes the definition of temporary unavailability for resources in a calendar.

Use one of the following sessions:

  • Recurring unavailability
    For recurring unavailability, such as national holidays, define the recurrence in the Recurrences (tcccp0143m000) session. Add that recurrence to the applicable calendar and availability type in the Calendar Recurrences (tcccp0144m000) session, and clear the Available check box for the unavailable days.
    With calendar recurrences you define recurring exceptions in a calendar, and set a time schedule for daily, weekly, monthly, or yearly unavailable time in one action.
  • Unavailable days for all availability types
    To define occasional unavailability, such as a department trip, use the Calendar Non-Available Days (tcccp0119m000) session. What you define here applies to all availability types.
     
  • Unavailable days for a specific availability type
    To define unavailability for a single day, complete the following steps:
  1. Start the Calendar Working Hours (tcccp0120m000) session.
  2. Find the applicable calendar and availability type, and clear the Available check box for a working hours type on the relevant date.
  • Unavailable during a part of a day
    To indicate that part of a day is unavailable, use the Calendar Recurrences (tcccp0144m000) or the Calendar Working Hours (tcccp0120m000) session to specify the time intervals that are available. All other times are considered unavailable. You cannot directly specify an unavailable time interval.

If you defined unavailable dates in the Calendar Non-Available Days (tcccp0119m000) or the Calendar Recurrences (tcccp0144m000) session, in the Calendar Working Hours (tcccp0120m000) session, click Update Calendar.

Note:

  • Unavailability always applies to entire days. If the Calendar Working Hours (tcccp0120m000) session contains multiple time intervals for a single date, and the Available check box is cleared for some intervals and selected for other intervals on the same day, the entire day is unavailable.
  • A calendar recurrence that makes a day unavailable has no effect on the availability of that day in the parent calendar.


It is not useful to define a special availability type for unavailability, because Infor LN does not maintain and update the working hours and the capacity data of a calendar in the Calendar Working Hours (tcccp0120m000) session based on non-available availability types.

Previous Article Infor LN & Baan Tip: Porting Set Issues
Next Article Infor ERP Tip of the Week: 5 Steps to Managing Sales Tax
Print
28405 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories