Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Hunter Douglas Architectural Products Selects Crossroads RMC for LN 10.6 Upgrade Project

LN Upgrade 10.6

Kathy Barthelt 0 34102 Article rating: 5.0

Hunter Douglas, the world leader in window coverings and a major manufacturer of architectural products, has selected Crossroads RMC for their LN 10.2.1 to 10.6 upgrade project. Hunter Douglas has been an LN user for years, but due to a requirement from their parent organization to modernize their hardware/infrastructure, it was decided to update their ERP version as well. Phase 1 of the project will consist of a base technology upgrade with a Phase 2 planned for 2020. Phase 1 Go-Live is slated for January 1, 2020.

To learn more about our Infor LN & Baan Consulting, contact us at: 800.762.2077, email Kathy Barthelt, or visit our Services webpage.

Infor LN & Baan Tip of the Week: The Production Bill of Material – 10.7

Kathy Barthelt 0 172324 Article rating: 5.0

The production bill of material is globally specified at the company level. It can be used as a source for the definition of the local material lists, such as:

  • The production model in the repetitive module.
  • The production model in the job shop module.
  • The subcontracting model in the subcontracting module.

The production bill of material can be generated through the engineering bill of material. The new production bill of material differs from the old bill of material:

  • It has a header and a status.
  • It is always revision controlled.
  • The effective dates have been moved from the material lines to the header.
  • The BOM quantity has been moved from item production data to the header.
  • The use up has been moved from alternatives to the material line.
  • The material line excludes logistic data (no warehouse nor routing operation).

The production bill of material is not mandatory.

Production bill of material revisions:
The production bill of material is revision controlled. The objective of the revision is to control the changes to the bill of material over time.

The P-bom includes this revision-related data:

  • Revision number
  • Effective date and Expiry date
  • Status (New, Approved, Expired)
  • Creation date and Created by: user
  • Approval date and Approved by: user
  • Expiry date and Expired by: user
  • Source information

On Time Orders: OTTO - The Right Tools!

George Moroses 0 35121 Article rating: 5.0

Your business doesn’t run without the right people and processes in place, but in order for people to manage the right things at the right time, they need tools... the RIGHT tools

OTTO helps manufacturing plants consistently meet customer commitments, allowing supervisors and managers to spend more time analyzing, making decisions, communicating, and coordinating. We can prove that OTTO is the right tool for the job.

Give it a test drive for 30 days at no charge and see immediate results.

Contact George Moroses today to learn more.

Infor LX & BPCS Tip of the Week: Control Number, POCNO, added to CEA502B1

George Moroses 0 59158 Article rating: 5.0

This enhancement makes the control number field in the purchase order file available for macros. Previously, the POCNO field (control number) in the purchase order was not available for macros. This enhancement allows the user to create macros that use this field. This enhancement provides the user with the ability to keep track of control numbers in their journal entries.

The programs impacted include:

  • CEA502B1, ACP Engine Resolution Program
  • CGL091B, ERPLX ACP File I/O Program
First5556575860626364Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Performance improvement by setting the First Free Number Cache (tcmcs0651m000)

Many transactions in all kinds of modules use order numbers or serial numbers. These order numbers are most often automatically generated. In the Number Groups (tcmcs0151m000) session you can define groups of order numbers used for dedicated areas. A Number Group is a group of the first free number series that you can assign to a specific use. All the numbers that Infor LN generates in the number groups that are dedicated to the same purpose are unique.

All the first free numbers are stored in the table tcmcs050.

As many different processes can request a free number from the number groups, we often see delays in the performance, due to locking on the first free number records. This locking issue can have a severe impact on the performance of huge batch-type transactions, but also on the performance perceived by individual users in many areas in LN.

For example:

  • Processing warehouse transactions. Single or in-batch
  • Completing / closing orders
  • Backflushing of production orders
  • Generate Order Planning
  • Cost calculation and warehouse revaluation


How this performance can be improved?

Resolution

In the Number Groups (tcmcs0151m000) session you can open the details of a specific Number Group (tcmcs0651m000) or start the session stand-alone.

In the Number Group, you define the Series with the related First Free Numbers. Per Serie in the First Free Number, you have the option to define the Cache Size.

This Cache size is defaulted on a value of 0 (zero). A cache size of zero means No Cache. How does the First Free Number caching works:

  • When the Cache Size is zero: With this setting a process requests a Free Number from the Serie and the first free number is issued to the process. But the first free number record is not updated yet. At the moment the requesting process is finished, without errors, it reports back that the number is used and the first free number record is updated. All the time that the process is working on the transactions the first free number record is locked. If another process is requesting a free number from the same series, it must wait (retries) until the record is updated and released by the previous process. This is the locking which is causing delays in the other processes.  
  • Setting the Cache Size to a higher value then zero activates the caching. When the Cache Size is set to 1 or higher, the requested free number is sent to the requesting process, the first free number is updated, with the number as defined in the Cache size, and the record is saved. It does not wait until the requesting process has reported back that is finished, with or without errors. In this way the record is immediately released and no locking will occur. If another process is requesting a free number, it does not need to wait until the free number record is released by the earlier process. If the process is ended with errors and therefor the number is not used, this number from the series is lost. This can result in gaps in the numbering. When the cache size is greater than 1, for example it is set to 5, the requesting process receives 5 free numbers. Even if it only needs less than 5. In this way the process only has to request for a new free number after it has used the first 5 numbers from the cache. This will also speedup the process in case of large batch transactions. For ‘warehouse integration users’, like for example Factory Track or WMS users we advise to set the cache size to 5.  

Note that financial documents are not based on number group series / first free numbers. Instead they are based on transaction type series, for which the caching functionality does not exist. Financial documents, like sales invoices, bank transactions, are thus not cached.

The caching is especially important to improve the performance of all logistical processes.

It is strongly recommended (mandatory) to set the Cache Size for all Number Groups to a minimum of 1.

Previous Article Infor LX / BPCS & Infor LN / Baan Tip: A New Wave of Cyber Attacks: Five Actions to Take Now
Next Article ​Infor LN & Baan Tip: Determining What Data to Archive or Delete
Print
26362 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories