EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

Infor LN & Baan Tip: Open Transactions Check – LN 10.7

Kathy Barthelt 0 56570 Article rating: 5.0

When closing a project, users were informed about open transactions blocking the closure process. To proactively check on open transactions, the Show Open Transactions option has been introduced in the Project Status (tppdm6107s000) session. With this option, issues can be resolved before changing the status.

Infor LX & BPCS Tip of the Week: LX 8.4 Enhancement – Company Security for ACR510

George Moroses 0 17385 Article rating: 5.0

This enhancement provides LX Company Security to Invoice Maintenance, ACR510. Only users authorized to the invoice company can view or maintain invoices.

User must be authorized to ACR as a product or ACR510 as an individual program in Security Master Maintenance, SYS600. Additionally, ACR510-01, displays all records, but if the user tries to revise or display a transaction record for a company the user is not authorized to, this error message is displayed: “User is not authorized to the transaction company.”

Infor LX & BPCS Tip of the Week: Item Deletion Option in IDF Enterprise Items

George Moroses 0 20541 Article rating: 5.0

Previously, users were unable to delete items in IDF Enterprise Items when they have inventory balances or the item is connected to ancillary records, such as sales history records. This feature added in LX 8.4 provides the ability to delete an item when sales history records are found but all sales history activity is zero.

When the user attempts to delete an item in IDF Enterprise Items that is tied to a sales history record, the panel displays a message that the item cannot be deleted. The user can then run the Delete Validation Report to determine which records are tied to this item that prevents the validation. If the item no longer has manufacturing activity but had old sales history, the item can be deleted.

Infor LN & Baan Tip of the Week: In Transit Inventory Report – LN 10.7

Kathy Barthelt 0 61834 Article rating: 5.0

A new In-Transit Inventory report can be printed in the Print In-Transit Inventory (whinr1410m300) session. The report provides an overview of company inventory that is on the move and not stored in a warehouse. This concerns only inventory that is transferred from one warehouse to another. Items that are shipped to, for example, customers or projects, or items that are issued to production lines or service departments are excluded.

The report shows item inventory....

First4950515254565758Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Accurate Job Costing

Standard costing is really a ‘best guess’ at labor costing -- these numbers are often inaccurate, incomplete or out of date.

Accurate job costing requires the capture of all tasks associated with a specific product or job, including direct and indirect labor in setup, production and customer service.

Inaccuracies in the collection of time allocated to machinery and the use of materials can result in the inability to properly pass those charges through to the customer, reducing company profitability.

Basically, you can’t manage what you can’t measure -- and you can’t measure what you can’t track. So the inability to track time-to task ultimately inhibits maximum utilization of the workforce. Unproductive activities remain hidden from sight -- managers don’t have the information needed to understand where wasted time exists, and therefore cannot create an action plan to remove it.

Optimize Your Manufacturing Today!

Previous Article Tip of the Week: Ways to Manage the Pain of Losing a Key Employee Before it Ever Happens
Next Article Baan/LN Tip of the Week: Month End Miscellaneous To-Do’s
Print
84626 Rate this article:
No rating
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories