Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant

Crossroads RMC 0 71075 Article rating: 5.0

No matter how large or small your manufacturing plant is, efficiency and productivity relative to your capital investment are the keys to maintaining your competitive edge. Wasting time and money is not something anyone wants to do, but manufacturers need to be especially mindful of both and actively work to address any issues that lead to productivity or financial loss.

Source: https://www.onupkeep.com/blog/improve-production-efficiency/

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

Kathy Barthelt 0 100047 Article rating: 5.0

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)

George Moroses 0 49440 Article rating: 5.0

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT

Welcome to Our New Website - Please Take a Look Around!

Crossroads RMC 0 42648 Article rating: 5.0

We proudly announce the launch of Crossroads RMC’s brand new website!

We have been fortunate to serve customers for over 30 years and over that time, we have developed software solutions and consulting expertise to become your Go-To Experts for Infor LN / Baan, and Infor LX / BPCS and M3. 

Our website design focuses on our products and services simply and succinctly, while accentuating the reasons why working with Crossroads RMC has been the right choice for so many manufacturers and distributors worldwide. 

So come on in and take a look around! We hope you enjoy the new site and explore all of the information it has to offer.

If you think our new website is COOL, please leave a comment!If you think our new website is COOL, please leave a comment! 

Keep up-to-date with our latest announcements, industry news, and Infor ERP tips here on Crossroads Connections, Subscribe to our bi-monthly Newsletter and follow us on Facebook, LinkedInTwitter and YouTube.

Infor will no longer support LX or BPCS on IBM i 7.2 after April 30, 2021

George Moroses 0 49740 Article rating: 5.0

On September 10, 2019, IBM® announced the end of support of IBM i 7.2 effective April 30, 2021. In line with IBM’s support policy, Infor will no longer support LX, BPCS, SSAEAM, PRMS, BOSS and related products on IBM i 7.2 after April 30, 2021.

All releases, patches, and solutions are expected to be delivered and compiled for IBM i 7.3 effective May 1, 2021. These deliverables should install and function on version 7 release 3 (IBM i 7.3) and above. This will require that your operating system be at a minimum release level of IBM i 7.3.

This policy extends to other Infor LX related technologies including WebTop, System i Workspace (SIW), and Infor Development Framework (IDF).

If you have not done so already, we recommend you start planning and completing your upgrade to IBM i 7.3 or above prior to April 30, 2021. After this date, if you register a support call with Infor Support, and your application still runs on IBM i 7.2, you may be requested to upgrade to a supported version of the IBM i operating system.

In addition, we invite you to log on to Infor Concierge to view and download important information regarding Infor LX, BPCS, and Infor SSAEAM. General KB Articles have been created to proactively provide you with information regarding this Announcement (1397381) and the Infor BPCS/LX Product Lifecycle Policy (1947086).

Infor LX & BPCS Tip of the Week: Journal Upload – EGLi

George Moroses 0 52110 Article rating: 5.0

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

Infor LN & Baan Tip: Open Transactions Check – LN 10.7

Kathy Barthelt 0 56423 Article rating: 5.0

When closing a project, users were informed about open transactions blocking the closure process. To proactively check on open transactions, the Show Open Transactions option has been introduced in the Project Status (tppdm6107s000) session. With this option, issues can be resolved before changing the status.

First4748495052545556Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE TIP:

Cash Forecast Reports and Inquiries

To produce the cash flow forecast, the combined information from the following is used:

  • Customer and supplier accounts
  • Open sales and purchase orders
  • Purchase quotations
  • Purchase requisitions
  • Standing orders
  • Projects
  • Financial budgets

You can use the bank balances of the bank relations that are maintained in the Bank Relations (tfcmg0510m000) session, to generate the reports with details of cash inflows and outflows of the company for a specified period of time.

You can also manually specify the Opening Balance for the cash forecast. Use the sessions below to print and generate the reports:

  • Cash Forecast Summary by Date Range/Currency (tfcmg3518s000)
  • Print Cash Forecast Details by Date Range/Currency (tfcmg3412m000)
  • Print Cash Forecast Summary by Period/Currency (tfcmg3410m000)
  • Cash Forecast Summary by Date/Currency (tfcmg3519s000)
  • Print Detailed Cash Forecast in Cash Forecast Currency (tfcmg3413m000)
  • Cash Forecast Components by Date/Currency (tfcmg3520m000)
  • Print Forecast Components by Date/Currency (tfcmg3420m000)

OPERATIONS TIP:

Deleting Purchase Orders:

  • If Finances is implemented, we recommend that you do not delete order data in a fiscal year that has not yet been fully closed. This is because the GRINYA process uses information that would be deleted by this action. For best results, check whether the logistical balance for non-invoiced receipts matches the balance of the GRINYA accounts for the periods up to which you want to delete purchase order data.
  • When a purchase order is canceled, you can only delete the purchase order and the related tables. If only a purchase order line is canceled, the line can be deleted and archived.

You cannot delete a purchase order (line) if:

  • The linked warehouse order is closed but cannot be removed.
  • The purchase order is linked to a PCS project that is not yet archived. When the PCS project is archived, the purchase data is also archived and you can delete the purchase order.
  • A consignment replenishment order is not yet consumed completely.
  • The invoice is yet to be completely matched and approved.
  • The invoice amount is not yet inserted as turnover history.
  • The sales order or service order that is linked to the purchase order line, and for which an internal invoice must be sent from the purchase office to the sales office or service office, is not yet invoiced. In this case, you cannot delete the purchase order line before the sales order or service order is invoiced.

TECHNOLOGY TIP:

Application Personalization

Users can personalize sessions and apply special formatting to the data displayed in sessions. The personalizations and formatting settings that are specified by the users are stored on the LN server. Administrators can maintain these settings.

  • Session personalizations

    Users can personalize sessions in various ways. users can, for example, hide fields, change labels, customize the toolbar, and move fields to another tab. Administrators can maintain the personalizations defined by the users. For example, an administrator can export personalizations to an XML file, import personalizations from an XML file, and copy personalizations to another user, to a DEM role, or to a company number.

  • Report personalizations

    You can use the Report Designer (ttstppersrep) to personalize the layouts and style of reports, without modifying the standard reports or using an external reporting solution. The changes are stored as personalizations.

    You can also generate new reports that are based on a selection of fields from the application data model. These reports are generated in the extensibility package. You can personalize these reports in the Report Designer (ttstppersrep), or modify them in Infor LN Studio.

    For details, see the Infor LN Report Designer Development Guide
     
  • Conditional formatting

    users can define conditions to apply special formatting to the data displayed in LN sessions. The users can define multiple conditions per session and different types of formatting, such as a specific color for particular fields or rows, and a warning symbol for particular rows. Administrators can maintain the formatting settings specified by the users and can define system-wide formatting settings.

Previous Article Infor LN & Baan Tips & Tricks for OPERATIONS: Creating a Purchase Order with Subcontracting
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Cash Forecast Reports and Inquiries
Print
17917 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories