Infor LX & BPCS Tips & Tricks for OPERATIONS: WebTop Grid Support Enhancement for MRP320D

George Moroses 0 1217 Article rating: 5.0

This enhancement improved the subfile utilized in MRP320D Master Schedule Detail Inquiry -SCR001 by expanding the subfile with data rather than clearing the subfile as user pages. This change provides full support for the WebTop 4.8 Grid decorator.  To implement this enhancement, request and apply MR 81428

This enhancement updated the approach used to populate the subfile to allow a deployed Webtop Grid to function correctly. There is no visible or user-impacted change to the way the program functions.

This enhancement provides improved functionality and full support of a Webtop grid applied to the subfile.

Infor LX/BPCS Tips & Tricks for FINANCE & TECHNOLOGY: Add Number of Assigned Users to SYS600

George Moroses 0 1182 Article rating: 5.0

LX has added the number of users assigned to a Role or Unit to the first screen of SYS600. When displaying the list of profiles on the first screen of SYS600, the list previously included the counts per profile of assigned Roles and Units when the profile was a user. A new column called Users have been added to show the number of assigned users for Roles or Units.

This enhancement provides a quick way to see the number of users assigned to a Role or Unit.

Crossroads RMC launches NextTrack Insights at inPOWER 2025!

Beta testing underway—general availability by year-end.

Nick Olson 0 1105 Article rating: 5.0

Big News from inPOWER 2025!

At this year’s event in Wisconsin, Crossroads RMC unveiled NextTrack Insights, our most advanced analytics solution yet. This release marks a major step forward for manufacturers looking to unlock deeper insights from their ERP systems.

The highlight? AI-powered natural language querying. Instead of digging through static reports or dashboards, you can now ask plain-English questions like “Which machines are down?” or “Are we on track to meet production targets for this shift?” and get immediate, actionable answers.

👉 Beta testing is underway, with general availability by year-end.

Learn more...

Infor LN & Baan Tips & Tricks for OPERATIONS: Pegging Material Supply Lines for Operation and Product Subcontracting

Kathy Barthelt 0 1477 Article rating: 5.0

For project pegged production orders, operations can be subcontracted. The material delivered to the subcontractor can be project pegged or anonymous. The subassemblies sent and retrieved are always project pegged. Costing breaks can be applied to direct the costs of the subcontracted operation to a specific project cost account. If (production material) costing breaks are used, a purchase order line's peg can differ from the peg on the material supply line.

For product subcontracting, the subcontracted purchase orders can include materials that inherit the project pegs or can include anonymous materials. The pegged materials are stored in inventory and are shipped to the subcontractor with project pegged orders.

In case of a project pegged order, a peg distribution is linked to the Purchase Order Material Supply Line in the...

Infor LN & Baan Tips & Tricks for FINANCE: Currency Differences

Kathy Barthelt 0 1330 Article rating: 5.0

When currency differences are posted, several parameters affect the way the entries in the General Ledger are created. This section explains the possible parameter settings:

  1. Ledger accounts by currency

  2. Writing off currency profits

  3. Fixed exchange rate

  4. Writing off currency differences for anticipated payments


1. Ledger accounts by currency
This parameter is recorded in the Finance Company Parameters (tfgld0503m000) session...

245678910Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for OPERATIONS: What is Statistical Inventory Control (SIC) and How Does It Work?

Statistical Inventory Control (SIC) is an inventory-controlled order system designed to maintain stock levels based on predefined thresholds, rather than being demand-driven like EP (Enterprise Planning). Since SIC relies on inventory levels, it may lead to higher stock levels. To minimize financial risks, SIC is best suited for:

  • Low-cost items.
  • Items with predictable demand or short lead times.


Applications of SIC

  • Low-Cost Items: Particularly effective for inexpensive goods.
  • Predictable Demand or Short Lead Time: Suitable when demand patterns are stable or lead times are minimal.
  • Warehouse-Specific Planning: Useful for planning by warehouse rather than across the supply chain.
  • Trading Industries: Commonly employed in sectors like supermarkets.
  • Immediate Demands: Effective for items required immediately by customers.
  • Ease of Use: Simple to implement and manage.


Limitations of SIC

  • Does not account for dependent demand from planned orders (e.g., MPS/MRP/INV).
  • Does not generate distribution orders.
  • Ignores time-phased planned orders.
  • Lacks forecast consumption techniques.
  • Uses both nettable and non-nettable warehouses.

How SIC Works

SIC operates based on the Reorder Point, Stock Levels, and Order Method.

Triggering SIC

When Economic Stocks (calculated as On-Hand Inventory + On-Order – Allocated Stocks) on the Horizon Date fall below the Reorder Point, SIC triggers the creation of:

  • Planned Purchase Advice.
  • Planned Production Advice.


Order Methods in SIC

The quantity for these advices is determined by the Order Method, which can be one of the following:

  • Replenish to Maximum Stock
  • Fixed Order Quantity
  • Economic Order Quantity (EOQ)
  • Lot-for-Lot

Example: SIC in a Supermarket

Scenario: Managing stock for Ice Cream (1 Kg Pack)

  • Current Stock: 10 PCs
  • Reorder Point: 5 PCs
  • Safety Stock: 2 PCs
  • Lead Time: 1 Day
  • Order Method: Replenish to Maximum (Maximum Stock: 20 PCs)
  • Maximum Anticipated Consumption: 3 PCs/Day

Process:

  1. Customer purchases reduce the stock.
  2. When stock reaches 5 PCs, SIC is triggered.
  3. A Purchase Advice is generated for 15 PCs to replenish stock to the maximum level (20 PCs).
  4. During the lead time (1 day), the remaining 3 PCs (excluding Safety Stock) meet customer demands.
  5. In emergencies, Safety Stock can also be utilized.

Statistical Inventory Control offers a practical approach for managing inventory levels, particularly in industries with predictable demand or fast-moving items. However, its limitations make it less ideal for complex or time-phased planning scenarios.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Use of Electronic Bank Statements
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Archiving Data from tipcs300 and ticst300 Tables
Print
57101 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories