10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 42723 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 81119 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 88965 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 35747 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 75126 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 110966 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

First127128129130132134135136Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Cost Component Setup

To break down an item’s standard cost, sales price, or valuation price, use cost components. With cost components, you can compare estimated and actual costs, calculate production variances, and analyze costs in Standard Cost Calculation.

If cost components are set up in a detailed way, detailed records exist in the Item - Calculated Valuation Prices (ticpr2540m000) session and the Item - Standard Valuation Prices (ticpr3540m000) session. Additional financial integration transactions are created because integration transactions are logged by cost component. A detailed cost component setup also causes additional cost details in domains such as Sales and Warehousing. This increases database growth and makes performance worse, especially during production completion and the item receipt process.

Reduce the number of cost components in the effective cost component structure, which is displayed in the Effective Cost Component Structure (ticpr0112m000) session, as much as possible. The minimum number is three aggregated cost components: one for material, one for operation, and one for surcharges. From a performance point of view, the following is advised:

Reduce the number of cost components

  • One operation cost component for all operation rates.
  • One cost component for all subcontracting rates.
  • One cost component for item and warehouse surcharges.
  • One cost component for actual labor rates (in People). Ensure you only use cost components that are required.

Use aggregated cost components
The standard cost is calculated by (detailed) cost component for a multilevel BOM. A similar calculation of valuation prices (actual prices) would result in a price structure with many cost components, especially for manufactured items. In case of a warehouse transfer, issue to WIP, and so on, postings are made for every cost component. However, this detailed cost information does not add functional value in Warehousing. If you aggregate cost components, the number of cost components in financial transactions is reduced. Therefore, aggregate operation cost, material cost, and surcharges to the three cost components that are defined in the Item - Costing (ticpr0107m000) session

If you do not enter a Standard Cost Component Scheme in the Item - Costing (ticpr0107m000) session, production order costs, production order variances, and surcharges are posted by aggregated cost component. This improves performance and decreases database growth.

Previous Article Infor LN & Baan Tip: Project Status Options
Next Article Infor ERP Tip: Top 5 Ways Modern Analytics Reduces Spreadsheet Risk & Inefficiency
Print
67107 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories