Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 88525 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 35444 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 73587 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 109841 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 103990 Article rating: No rating

In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

 

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

BPCS/LX Tip of the Week: Product Routing

Anthony Etzel 0 74921 Article rating: No rating

Defining the Product Routing first requires the items to be setup in the Item Master file. Other master files also need to be defined prior to creating the routing.
These include:

  • The Facility defined with a SYS program
  • The Warehouses defined with an INV program
  • Locations defined with an INV program
  • The Machines (required if using capacity planning or an MES interface) defined with an MDM program

After the above data is set up, the Department file and Work Center files can be setup in MDM. Now you are ready to define a product route.

Baan/LN Tip of the Week: Month End – Miscellaneous To-Do’s

Kathy Barthelt 0 106138 Article rating: No rating
  • Print Sales Order History Information
    • all invoices processed through sales
  • Check Inventory Valuation
    • this should tie out to your inventory accounts
  • Print Integration Information
    • see all postings from WIP to finished goods
  • Print G/L Transaction Information
    • print specific transaction types for any GL account
  • Print Lot Control Information
    • will show where serial numbers were used
First127128129130132134135136Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for OPERATIONS: Blocking or Unblocking Warehouses

You can block a warehouse for inbound procedures, outbound procedures, or both. For example, you can block inbound and outbound procedures for a warehouse if the warehouse must be closed temporarily for inspection.

You can impose these types of blockings:

  • Full block: Full block on warehousing procedures.

  • Interactive block: Override blocking allowed except blocks on confirm shipment or confirm receipt.

If you impose a full block on inbound procedures, the receipt and inbound inspection procedures are not allowed for the warehouse.

If you impose a full block on outbound procedures, the outbound, outbound inspection, and shipment procedures are not allowed for the warehouse.

An interactive block on inbound procedures blocks the confirm receipt step. For the other inbound steps (for goods already received), a warning is displayed and you are prompted to cancel the procedure or to continue.

These are the other inbound steps:

  • Generate and release inbound advice
  • Print and confirm storage lists
  • Put away stock

If you perform the outbound steps of a warehouse transfer and an interactive inbound block is imposed on the receiving warehouse, you are warned that the receiving warehouse is blocked.

An interactive block on outbound procedures blocks the confirm shipment step. For the remaining outbound and shipment steps, a warning is displayed and the user is prompted to cancel the procedure or to continue. Assembly, internal inventory movements and inventory adjustments are also allowed.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Interest Invoices
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Archiving Concept
Print
28094 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author