BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 78164 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 86221 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 34517 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 70056 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 106282 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 101067 Article rating: No rating

In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

 

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

BPCS/LX Tip of the Week: Product Routing

Anthony Etzel 0 73869 Article rating: No rating

Defining the Product Routing first requires the items to be setup in the Item Master file. Other master files also need to be defined prior to creating the routing.
These include:

  • The Facility defined with a SYS program
  • The Warehouses defined with an INV program
  • Locations defined with an INV program
  • The Machines (required if using capacity planning or an MES interface) defined with an MDM program

After the above data is set up, the Department file and Work Center files can be setup in MDM. Now you are ready to define a product route.

First126127128129131133134135Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Is your Baan or Infor LN system STILL not integrated with UPS and FedEx?

It's hard to find a manufacturing article, or talk to a manufacturer for that matter without hearing about the importance of efficiency. In fact, 92% of manufacturers reported that their most significant business imperative is improving efficiency, according to a major new report published by The Manufacturer and IBM. Improving efficiency cuts costs, improves throughput, and ultimately improves competitiveness.

One way to improve efficiency is to eliminate the redundant process of manually keying data from Baan and Infor LN to your third-party logistics systems such as UPS or FedEx. Third-party systems need to know what you want shipped, how it is being shipped, the weight, quantity, etc. Once the shipment is ready, the tracking number, freight cost, and other information need to be entered into Baan and Infor LN in order to process your sales orders and ultimately invoice your customer. This process is time-consuming, error-prone, and causes delays in shipping and invoicing.

Why waste time and energy when the entire process can be automated on-premise or cloud with RMCship?

RMCship provides a complete one-way or two-way communication channel between Baan IV, Baan V, and Infor LN to UPS Worldship & FedEx Ship Manager.

TO UPS & FedEx -
RMCship:

  • Provides options to create cartons, pallets within Baan IV, Baan V, and Infor LN (ERP LN)
  • Allows shipments to include a single order, partial orders, or multiple orders per carton/pallet
  • Automatically sends customer data, order data, and shipping information from Baan and LN to UPS and FedEx
  • Prints carton labels for shipping

FROM UPS / FedEx -
RMCship:

  • Pulls all tracking information, freight costs, freight types, quantities, etc back into Baan and Infor LN
  • Automatically adds freight lines to sales orders
  • Provides and prints shipping information on invoices
  • Confirms the shipment / processes maintain deliveries
  • Provides easy lookup access to shipping information for Customer Service personnel

INCREASE EFFICIENCY with RMCship

★★★ SAVE 1.5 – 2.5 Hours a day by eliminating redundant processes… That’s 30-50 hours a month!

★★★ No Shipping Delays, so invoicing gets done earlier, sent sooner, and paid faster!

★★★ Happier Customers because your Customer Service personnel can access all shipping information!

★★★ Increase Customer Satisfaction because they have immediate access to shipping information on their invoice!

Request a Demo Today!
800.762.2077
 

Print
29220 Rate this article:
2.5
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories