Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 114826 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

BPCS/LX Tip of the Week: What is Lean Make to Order?

Anthony Etzel 0 71549 Article rating: No rating

This is a simple way to go from the customer order to making the order and shipping the order. It involves a few simple steps:

  1. Receive and enter the customer order
  2. Automatic credit review
  3. Automatic release of the shop order tied to the customer order
  4. Issue material, report labor to the production order receipt
  5. Pick the order, ship the order, invoice the customer

With lean, you can skip processing the demand through MRP. You can go directly from the customer order to the shop order creation.

PDIC Goes Live with Crossroads MES

Anthony Etzel 0 52796 Article rating: 5.0

PDIC, a leading producer of wire products, went live with the Crossroads MES solution on June 30th,2014. PDIC needed a better way to deploy and report shop floor information to BPCS 6.02. Their goal was to eliminate all their manual reporting and position themselves to take advantage of the Crossroads Dashboards.

Baan/LN Tip of the Week: Negative Inventory

Kathy Barthelt 0 126061 Article rating: 5.0

If Location Control is turned on in Baan IV, then inventory should never be negative.

If Location Control is not turned on in Baan IV, and the parameter “Negative Inventory Allowed” in INV Parameters is set to “NO”, then inventory should never be negative.

In Baan V and LN, the parameters in Inventory Handling Parameters determine whether you can have negative inventory. If these parameters are set to “NO”, then inventory should never be negative.

BPCS/LX Tip of the Week: Establish Costing For Purchased Items

Anthony Etzel 0 86072 Article rating: No rating

How Does Infor LX Establish Costing For Purchased Items?

In LX, you will establish a standard cost (you define the standard) that LX will use for the purchase items. You also need to establish in LX the Cost Type, the Cost Bucket, and the Cost Set needed for cost accounting.

BPCS/LX Tip of the Week: Alternate Items

Anthony Etzel 0 78148 Article rating: No rating

How can I use an alternate item on a shop order?

The best way is to have the approved alternate item appear on the Bill of Material just after the standard item with a zero required quantity. Now the alternate item will appear on the Shop Order. So, if the standard item is not available, the alternate item can be issued to the shop order.

When the shop order is closed out, one item will have an unfavorable variance while the other shows a favorable variance. This is an easy way to provide alternate items provided engineering approves and they are part of the Bill of Material.

Crossroads MES Version 11 Released

Anthony Etzel 0 52750 Article rating: No rating

Crossroads MES Version 11 was rolled out in March, 2014. Some of the new features include a new GUI interface, improved End of Shift review functions, pre-formatted production label printing, and an electronic shop packet on the factory worker Job In screen.

Crossroads MES Released for Tablet

Anthony Etzel 0 49253 Article rating: 3.7

Crossroads RMC announces that the Crossroads MES solution is now compatible with tablet PCs running Windows 8.1. Tablet PCs are becoming the clipboard replacement for supervisors and managers to monitor what’s happening on the shop floor.

First121122123124125126127128130

Tips:  LX | BPCS | M3

Tips: LN | Baan

Eliminating ERP Customizations: Key Considerations and Modern Solutions

Transitioning away from customizations can indeed pose challenges, but it's not insurmountable with the right approach. Here’s a look at the real issues and solutions that can pave the way for a streamlined, up-to-date ERP.


Common Challenges:

  1. Dependency on Custom Processes
    Custom processes become ingrained, and removing them disrupts established workflows. However, business processes often evolve over time, as do best practices incorporated into modern ERP systems.

  2. Cost and Time Constraints
    Testing, retraining, and hiring consultants for an upgrade are valid concerns. Yet, consider the efficiency gains and reduced maintenance costs over time by utilizing standard ERP features.

  3. User Resistance
    Change management is critical, as employees can be skeptical of losing tools they’re familiar with. Effective communication about the benefits of standardized, future-ready tools can help ease the transition.


The Reality Check: Has Your Organization Changed?

Evaluate how much your business needs have shifted, how user expectations have evolved, and if any workarounds or interim solutions are now adding unnecessary complexity. Many companies discover that industry-standard ERP features can replace outdated customizations.


Did You Know?

  • ERP Upgrades Can Eliminate 25% - 50% of Customizations
    Modern ERP systems incorporate industry best practices as core features, allowing you to rely less on customizations and more on robust, standardized solutions.

  • Extensibility & Reporting Solutions
    Extensibility tools in Infor LN or Baan let users add last-mile functionality without modifying the core ERP. Reporting tools allow custom insights while keeping ERP data intact.


Solutions to Reduce Customization Dependency:

  1. Rewrite Customizations to Use Standard APIs and Libraries
    This ensures seamless interaction with core ERP features without modifying underlying code.

  2. Utilize Infor Extensibility and LN Studio
    Smaller tweaks can be handled with Extensibility; larger needs can leverage LN Studio for custom apps without touching the ERP's foundation.

  3. Incorporate Infor ION for External Integrations
    If customizations primarily manage integrations, Infor ION can connect and streamline external systems effectively.

  4. RMCgen for Custom Components
    RMCgen allows for custom development without altering standard programs, offering flexibility without compromising core stability.

  5. Analytics Dashboards for ERP Insights
    Dashboards offer tailored views and insights without requiring customizations in the ERP itself.

  6. Leverage Built-in Reporting Tools
    Infor Report Designer, Document Management, and BIRST can provide custom reporting, avoiding custom coding altogether.

  7. Assess Your Custom Components
    A thorough assessment of your customizations—internally or with Crossroads RMC consultants—can reveal areas for potential standardization and streamlining.

Let’s Talk Solutions

If customizations are standing in the way of your ERP’s full potential, Crossroads RMC can help. Connect with us at 800.762.2077, solutions@crossroadsrmc.com, or request a consultation to start your path towards a flexible, future-proof ERP.
 

Print
10021 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories