Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Work Center - Cells

Anthony Etzel 0 58289 Article rating: No rating
The LMP module (Lean Manufacturing Process) uses work centers but refers to them as production cells.

A cell is one or more work centers that produces an end item. So when a company decides to adopt the lean manufacturing philosophy, the concept of work centers takes on a new meaning.

In lean terms, the work center, or group of work centers, becomes a production cell. In other words, a mini-factory producing end items with similar characteristics.

Baan/LN Tip of the Week: Closed, Final Closed, Provisional Close – What’s The Difference?

Kathy Barthelt 0 73608 Article rating: No rating

Fiscal, Reporting and Tax Periods can have status Open, Closed or Final Closed. If a period is Closed or Final Closed, you cannot post entries to those periods. If a period is Closed, you can re-set it to Open and post entries. If a period is Final Closed, you cannot post and you cannot set it back to Closed or Open.

A Provisional Close is run at year-end to bring the balances forward for the new year without having to close the previous year. A Provisional Close can be run as many times as you like. After a Final Close, a Provisional Close cannot be run.

The Provisional Close allows you to continue into the new year with all financial reporting and not have to rush with the Final Close until all adjusting entries are made and any final signoffs have been completed.

Baan/LN Tip of the Week: Product Families

Kathy Barthelt 0 74395 Article rating: No rating

In Baan IVC, plan items on the lowest plan level were automatically actual items (not product families). All plan items on higher plan levels were product families.

The relationship between a product family and items on lower plan levels was defined in a planning bill of material.

In Infor LN, every family item must be defined in the Item Base Data module. A family item can exist on any plan level. The relationship between a family item and items on lower plan levels is defined in aggregation relationships.

Aggregation relationships in Infor LN are much more flexible than the planning bills of material in Baan IV. For example, users can define aggregation relationships between items on the same plan level.

BPCS/LX Tip of the Week: Create the Master Schedule

Anthony Etzel 0 71915 Article rating: No rating

In the master schedule creation, you have the flexibility to enter a planning start date, or default to the facility planning start date. Infor LX uses the planning date to plan both orders with forecasts and customer orders as demand.You can create your master schedule from the Master Production Scheduling module (MPS).

No one cares how hard you work! How you can do more, while doing less – know your MO.

David Dickson 0 54163 Article rating: 5.0

Would you like me to tell you a dirty, little secret?

No one cares how hard you work. Sure, some people will notice if you seem to be working hard. Your spouse or companion might note that you seem tired, stressed, not as much fun, or just aren’t around much, but they care about the consequences, not how hard you work. Your boss might note happily that his staff seems busy, things are humming along, but you can be sure that when it is review time she gets no credit for “keeps staff very busy.” Nor will the boss give you extra points for being busy. It is about results.

People outside your personal life, beyond your coworkers, might notice that you are hard to contact, perhaps because you are so busy. But trust me, customers do not care why they can’t get hold of you, and they will not see it as a positive.

Infor and Crossroads RMC are proud to offer a joint webinar on Taking Your Shop Floor Paperless - August 28th, 2014.

Anthony Etzel 0 43721 Article rating: No rating

Taking Your Shop Floor Paperless - Webinar, August 28th, 2014.

During this webinar, you will learn about the Crossroads MES Shop Floor Solution which gives you the ability to do all the following and more:

  • Collect production data
  • Provide real time feedback to your workers and your management team
  • Integrate to machines on your shop floor to pull counts directly
  • Provide up-to-date electronic versions of shop floor paperwork at the work center
  • Monitor your production against your key performance indicators
     

Join us on Thursday, August 28th at 12:00 p.m. Eastern to learn more.

TO REGISTER:

linked removed...

Baan/LN Tip of the Week: Company Calendar

Kathy Barthelt 0 71252 Article rating: No rating

Baan uses the company calendar in the following modules to determine the start and end dates for planned orders:

  • Master Production Scheduling
  • Material Requirements Planning
  • Capacity Requirements Planning (All three combined in a single planning module for Baan V and LN)
  • Shop Floor Control

The calendar provides the valid working days, number of shifts per day and the number of hours in a day.

Baan allows for a single calendar for the whole company or for a calendar for each work center.

BPCS/LX Tip of the Week: SFC600 & SFC650

Anthony Etzel 0 80145 Article rating: No rating

These programs are used to capture and post shop floor information. Labor reporting, machine time, etc. can be captured by either program. The key difference is that one will also capture the production receipt and backflush components. Based on your company information / transaction process, one of these programs will most likely be used daily to capture current shop floor data. You can use the shop packet labor ticket for the manual recording, and the keying of the data. Alternatively, you can incorporate an automated method like an MES solution to capture the data and streamline the process.

First119120121122123125127128

Tips:  LX | BPCS | M3

Item Facility Master has a new attribute to define the override inspection days lead time CICP.ICINSD.

  • When an item facility has a defined override inspection days lead time, that value will be used instead of the system parameter inspection days lead time.

MRP exception report, MRP200B
Purchase planning report, PUR285B
Purchase order / Requisition maintenance, PUR500D3
Purchase order consolidation / release, PUR640B1
Vendor splits, PUR653B

This enhancement improved the subfile utilized in MRP320D Master Schedule Detail Inquiry -SCR001 by expanding the subfile with data rather than clearing the subfile as user pages. This change provides full support for the WebTop 4.8 Grid decorator.

This enhancement updated the approach used to populate the subfile to allow a deployed Webtop Grid to function correctly. There is no visible or user-impacted change to the way the program functions.

This enhancement provides improved functionality and full support of a Webtop grid applied to the subfile.

Last

Tips: LN | Baan

Infor LN & Baan Tip: The ABC’s & 123’s of Serialized Items
Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: The ABC’s & 123’s of Serialized Items

A serialized item is a physical occurrence of a standard item that is given a unique lifetime serial number. This enables tracking of the individual item throughout its lifetime, for example, through the design, production, testing, installation, and maintenance phases. A serialized item can consist of other serialized components.

In Service, a serialized item can be a customer-specific or owner-specific installation. Installation groups are a group of installations/serialized items such as photocopiers, computers, air conditioners, forklifts, lathe machines, and even aircraft.

A serialized item is identified by both the item code and serial number. You can set up the mask used to generate the serial numbers so the serial number includes some fields of the item data, such as the item group and the manufacturer.

In a multi-company structure, the companies can share the serialized item data. All the service departments in the various companies can refer to the same serialized items.

The serialized item can originate from a sales order or a project. The details of a serialized item indicate their origin, for example, by using specific sets of serial numbers for items that originate from sales orders and from projects. Serialized items can also originate from an as-built structure or directly from the production bill of material in Manufacturing.

In Service, serialized items can start their respective life cycles in As-Built mode or As-Maintained mode. Each serialized item, with or without its installation group, can be covered by a service contract or a warranty.

The serialized item status

Serialized items can be status controlled. Each serialized item can have the following status:

  • Startup - The serial number has been assigned, but the item is not yet included in a service order or contract. You can only change the status to Active.
  • Active - The serialized item is part of a service order or contract. You can only change the status to Revision.
  • Revision - You can only change the status to Active.


Serial numbers

A unique serial number is assigned to every manufactured item or purchased item. The serial number is assigned to track the item in its life cycle. You can define a dummy serial number for an item. The dummy serial number is a temporary number and can be used to monitor the item until a permanent number is assigned. For each serialized item, you can define an alternative serial number for customer reference. You can use the alternative serial number to search for items when you register calls, create service order activities, or register parts lines for a maintenance sales order.


Serialized item groups

You can group serialized items by serialized item groups. A serialized item group is a group of serialized items with similar features. You can define the serialized item groups that you need, for example, to categorize the skills required for the maintenance of the items, or as a basis for enquiries and reporting. For example, you can select service engineers on the basis of their skills for a specific serialized item group.


Serialized items in physical breakdown structures

Serialized items are the building blocks of physical breakdown structures. A physical breakdown structure is the relationship definition of a set of serialized items with their underlying parts and assemblies. Some serialized items, such as a photocopier, have a simple structure whereas other serialized items such as a ship or an aircraft have a complex structure.

A top serialized item occurs at the highest level in the physical breakdown structure, while the underlying structure consists of assemblies that are either effective or outdated. Use the Tree View option to display a graphic view of the structure.

Each serialized item in the breakdown can be linked to a functional element, with a common function across the entire structure, and can be used to group serialized items based on the functional importance.

Previous Article Infor LN & Baan: Customizing Shipping Labels for All Customers
Next Article Infor LN & Baan Tip: Outbound Order Lines
Print
18292 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories